Loading…
Loading…
1,333 results • Recent activity
Rectification Works to the damaged Ash Slurry Trench Inner Walls below GL leading from Mill Plant Operator Room South side to Compressor Room from CH 90m to CH 150m in Unit 4.
Rectification Works to the Damaged Ash Slurry Trench Inner Walls below GL leading from ESP 5 Control Room to Ash Water Tank CH 120m to CH 160m in Unit 5
Rectification Works to the Damaged Ash Slurry Trench Inner Walls below GL leading Bottom Ash to ESP 5 North side from CH 0m to CH 80m in Unit 5
Rectification Works to the Damaged Pedestals and Providing Encasing Concrete to the Structural Steel Columns in Bottom Ash Hopper area in Unit 5
TTPS MechII AHP Unit I BAH Attending breakdown maintenance works in BAH I for the period from 01 04 2026 to 31 03 2027
Replacement of Wornout Vinyl Flooring by New Sheet in Unit 3 UCB at 13.50 m level