Loading…
Loading…
1,333 results • Recent activity
Repair and Maintenance Works to the Indoor Switchyard 1
TTPS MechII AHP Unit II Annual overhauling works of pumps valves and replacing of wornout pipes of sea water Booster Pumps during forthcoming annual overhaul
TTPS Mech II TM I Unit II Reconditioning of Lub oil Seal oil cooler cooling water butterfly Gate valves of various sizes during the forthcoming annual overhaul
TTPS Mech II TM I Unit II Inspection Painting Overhauling of condenser cw pipelines hotwells etc during the forthcoming annual overhaul
TTPS Mech II TM I Unit II Removal of deteriorated cladding over the inner surface of condenser East West cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mate
TTPS Mech II TM I UnitII Inspection overhauling and commissioning of actuators of Feed water Steam line valves during the forthcoming annual overhaul