Loading…
Loading…
1,424 results • Recent activity
ECHP-II- Reconditioning of various size of idler rollers at Conveyor-72,73,48A/B, RBFD-1A,1B,61 64
ECHP-I- Complete overhauling and load testing of 2 Nos. 15 Ton and 3 Nos. 10 Ton electrical wire rope hoists located at SCH-I
ICHP- Replacing the worn out chequered plate with new chequered plate in Conveyor-27A take up pulley floor size 12m x 8m
ECHP-II- Erection of skirt board assembly for Conveyor-73 tail end area
ECHP-I- Renewal of 10 Nos. Worn out earth wires, earth pipes in the existing earth pits of SS-III HT Switch gear 2 Nos., SCH-I freight cum passengers lift 2 Nos. PCH-I dust suppression system 4 Nos. and red gate area 2 Nos.
ICHP- Cleaning of coal dust accumulated in the cables, cable tray structure etc., routed through conveyor structure along with the conveyors from Conveyor-27A B bunker to 28A B PhaseI Conveyors