Loading…
Loading…
265 results • Latest
Repair and maintenance of Earthwork of Bhatsa Left Bank Canal from Chainage 240m to 360m to supply water to BMC and TMC
Achara Badekhajan Kharland Scheme Tal. Malvan, Dist. Sindhudurg Restoration Of Bund From Ch. 0 m To Ch. 720 m.
Providing Jacketting to D/S of w.w.bar for M.I.Tank at Roshani, Tal.Triambakeshwar, Dist.Nashik
Providing guniting to inner and outer side of Intake Well to prevent leakages of M.I.Tank at Waigholpada, Tal.Tryambakeshwar, Dist. Nashik
Providing Jacketting to D/S of guide wall to prevent leakag through it and Providing and Fixing Gauge Plate of M.I.Tank at Chinchavad, Tal.Tryambakeshwar, Dist.Nashik.
Korle Satandi Medium Project Tal Devgad, Dist-Sindhudurg. Constructing ICPO Service Gate, Energy Dissipeation Arrangment , Bulk Head, Concrete Conduit connecting EDA to Tunnel , Balance concrete work of Tunnel with Permanant Supports,Intake Wal
Construction of Pipe C. D. Work at Ch. 370 m. on RBC of M. I. Tank Shrimant Tal. Peth, and Repairing of VRB on LBC Ch. 3300 m. and Ch. 3428 m. and Construction of Protection Wall in selected portion at M. I. Tank Harangaon Tal. Peth, Dist. Nashik
Repairing of Pipe VRB at Ch. 5 m. 800 m., and 1900 m. on Right Bank Canal of M. I. Tank Pahuchibari Tal. Peth, Dist. Nashik
Arrange Jal Jagruti programs, cultural activity
Repairing Pipe VRB at Ch. 1200 m., 2300 m., and 2330 m.on on Left Bank Canal Karanjali-Harsul road at M. I. Tank Inambari Tal. Peth, Dist. Nashik
Repairing of Cross Regulator Canal Structure of Left Bank Canal and Right Bank Canal at M. I. Tank Shrimant Tal. Peth, Dist. Nashik
To Implement Leakage-Prevention measures and undertake ancillary works within the Earthen Embankment at M. I. Tank Cholmukh Tal.Peth Dist. Nashik
- Improvement and repairs to dam approach road and ancillary works at M. I. Tank Inambari Tal.Peth Dist. Nashik
Repairs And Re-construction of Pipe C.D. Work at Ch. 731 m, And Ch. 1200 m of RBC and allied works of M. I Tank Lingawane Tal-Peth, Dist-Nashik
Repairing of Cross Regulator Structure of Right Bank Canal and River Escape at M. I. Tank Cholmukh Tal. Peth, Dist. Nashik
Repairs and Re-construction of Pipe C.D. Work at Ch. 475 m, Ch. 602 m and Ch. 884 m of RBC and allied works of M. I Tank Aad Tal-Peth, Dist-Nashik
Investigation Taking trial bores And water intake test on Alignment of Damline, Head Regulator, Waste weir, Approach and Tail channel and Demarcation Of Boundary Stone At FRL For Submergence of Par River Project at Dumipada Tal.Surgana
Construction of Trash Rack Structure Near the Inlet of Tunnel of Arjuna Right Bank Canal at Ch. 16/400 km including all necessary allied works
Carrying out internal repairs, office furniture work, supply of materials and ancillary works in the Irrigation Project Construction Division, Ratnagiri.
Repairs to Sub division office of Irrigation Construction Sub division, Aravali, Tal. Sangameshwar, Dist. Ratnagiri Non Irrigation
Repair of chowki, constructing shed at hetawane dam top and providing paver block around electric transformer, gardening work.
Construction Of Cement Concrete Protection Wall to right side of Hetawane dam direct approach road Ch 80 to Ch 120.
Construction of Closed Pipe Distribution Network For Left Bank Canal Ch. 19508 m to Ch. 21643 m, Construction of Closed Pipe Distribution Network For Koproli Minors (Minor No. 1 to 16), Construction of Closed Pipe Distribution Network For Command....
Repairing work of leakage for the roof of Generator Meter room at Terwanmedhe Pickup Weir and other ancillary works.
Constructing the OPEN TROUGH in the concrete instead of the OPEN TROUGH in the breach construction of Tilari Left Bank Canal No. 18.016 on Maneri distributary originating from here, which has leakage in Tilari Left Bank Canal No. 12 distributory, alo
Construction Of VRB on Nalla Flowing beside Plot no. D-17 and A-251 of Mangvali Rehabilitation Colony Of Aruna Medium Irrigation Project, Tal - Vaibhavwadi, Dist - Sindhudurg
Submergence Clearance for Gorge Filling of Deharji Medium Project Tal. Vikramgad Dist. Palghar
Water supply scheme in rehabilitation plot near khaire gaothan for rehabilitation of families affected due to construction of mumari dam under Bhatsa Project, Tal-Shahapur, Dist-Thane.
Repairing of Khandape Dam And allied works at Khandape M.I. Scheme, Tal. Murbad, Dist. Thane
Repair of Aqueduct at Ch.0 280 and Construction of Village Road Bridge at Ch.4 070 Ch.5 640 Ch.10 755 and Repair of Super Passage at the rate Ch.17 900 of Palghar Branch No.2 Of Surya Right Bank Canal
Upgradation of the specialized Wi-Fi/Wired Transmission Control based security monitoring and supervision system at the Vaitarana Dam of Vaitarna Hydropower Project and Alwandi Dam of Vaitarna Hydropower Project for transmission of the necessary data
Talavade Tembavali Kharland Scheme Tal. Deogad Dist Sindhudurg Restoration OF Bund From Ch.540 m To 650 m and Renovation of CD Work at CH. 595 m.
TALAWANE KHARLAND SCHEME TAL SAWANTWADI DIST SINDHUDURGRENOVATION OF CD WORK AT CH. 90M.
Providing and Fixing Gates to CD Work of Kharland Schemes in Deogad taluka arising due to Emergency Situation Bhatwadi KLS Wada KLS Pural Kothar KLS Manche KLS Mutat KLS, Padel No.1 KLS, Padel No 2 KLS Mond KLS Puralgaonbandh KLS
BHATIMALI KHARLAND SCHEME TAL VENGURLA DIST SINDHUDURG RESTORATION OF BUND FROM CH.835 M TO 1030 M AND CONSTRUCTION OF C.D. WORK AT CH. 795M.
Constructing black topping for Internal Raod at rehabilitation Gaothan Mangvali Titha and Kinjalicha Mal of Aruna Medium Project at Vaibhavvadi
Survey for Submergence and Command Area and Taking Trial bores along alignment of proposed KT Weir at Dabhole in Kajali River Tal Sangameshwar Dist Ratnagiri
Providing fixing installation and commissioning of state of the art smart dam system for transmission of all essential data of State of the art smart dam system and other necessary compatible transmission control Internet protocol based devices wher
Erosion Prevention Measures
Repair and Maintenance of Road for Navin Kurli Vasahat Tal Kankavali, Dist Sindhudurg.
Construction of Retaining Wall at Tail Channel and Repairs embankment and pitching near H.R.well at. U.S of Harkul M.I. Scheme, Tal Kankavli, Dist Sindhudurg
Construction of residential and office buildings for the canal
Repair of Water supply Scheme HDPE pipe line in Kinjalicha Mal
Construction of Record Room, Repair and Renovation of R3 Type quarter, Blacktopping to Internal Roads, Renovation of Assistance Executive Engineer PA Cabin, Providing Labours and Material for Maintenance of Water Supply scheme, Fixing Iron Mesh on
4402 S and W.C.Renovation of Bund at SASUNAVGHAR K.L.S. Scheme, Tal. Vasai, Dist. Palghar.
4402 S and W.C. Renovation of Bund Chorkhar Annapurna K.L.Scheme Tal. Bhiwandi, Dist. Thane.
2402 E AND I Repairing And strenghtening of SG at ch.1450 m of Shirgaon Kothe K. L. SCHEME Tal- Vasai Dist- Palgar.
Kol K.L.S.
Shirgaon Son K.L.S.
Carry out ground analysis and study using airborne data acquisition technique with high accuracy by pre-approved fully Autonomous VTOL UAV.