Loading…
Loading…
3,164 results • Recent activity
Loosening dismantling of conv. Belt 330mtr. 1000mm width for 02 nos. damaged joint made by cold vulcanized, drive pulley lagging, gear box, oil seal changing ... unit 303 belt conveyor of main plant of KW
Repairing of 4 Nos of 3.3 kV grade 200 amps starter for control and protection of 2000gpm pump at main sump installed at AKKOCP
To establish 8.4 Gbps bifurcated 1 IS TO 1 uncompressed and unshared, Symmetric Internet bandwidth via Leased Line Last mile connectivity through redundant Optical Fiber Cable at 270 Nodes of CCL command areas As per Annexure I for a Period of 05 YR
Supply and installation of SPD with isolation transformer for road weighbridges installed of AKK OCP, under BnK Area
Preparation display of mine model on them Smart traffic management in mine to be displayed at Annual Safety week to be held at Barkasayal Area.
For maintenance, repairing and reconditioning of 2 Nos HT Starter 3.3KV grade A) 3.3 KV 180 KW Prabhu make HT Starter and B) 3.3 KV 190 KW Mineline make HT Starter at Kedla Open Cast Project under Hazaribag Area