Supply and fixing of 11KV and 3.3KV cable mounting, jointing and cable end termination at GVP Phase-II OCP
Repairing of GOAB switch, lighting arrester and limit switch at GVP Phase-II OCP
Shreshth Low-back Revolving Chair of Adjustable height with, Shreshth Low-back Revolving Chair of Adjustable height with Wheels
Diversion of 3.3 KV overhead line near amlo halt in respect to kargali OCP
Different repairing works applica-ble to Diesel Bowser (Reg. No. JH24H9392) deployed at Topa OCP, Kuju Area.
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; one hard top closed SUV engine capacity 1493 cc or above with seating capacity for five passengers including the driver; As per the ATC of GeM Portal; 2000 KMS MONTHLY RUNNING; A/C; 24 H..
Repairing of Oscillation Bar along with Pin and Eye of CAT773E Caterpillar dumpers Sl. No.-1045 and 1108 deployed at Karma OCP, Kuju Area.
Repairing of Push Arm, Trunnion, Fan guard and Blade Assembly of CAT 834K Wheel Dozer SI. No.-744 deployed at Karma OCP, Kuju Area.
Repairing of Radiator, Oil Cooler, Centralized greasing system, Steel bracket and Fan Shroud of BEML BE1000 excavator SI. No-10145 deployed at Karma OCP, Kuju Area.
Repairing of both side steering cylinder, lift cylinder, tilt cylinder, rotating jaw, rear axle, differential, hubs, battery box, engine guard, counter weight of Tyre Handler Sl. No. 18112 deployed at Topa OCP, Kuju Area.
Laying and Dismantling of 10inch 250 MM 8inch 200 MM pipe line and modification of base plates on as and when required basis for the Period of 01 Years 365 Days of Rajhara Colliery under Rajhara Area
Providing and fixing cautionary , mandatory ,informatory , directional and place identification sign boards at different locations under AADOCM , Dhori Area
Complete Rewinding and Repairing of 01 MVA,11KV/3.3KV Ece make Transformer SI No. 14354 of Central Saunda Colliery.
Safety Footwear (V3) ISI marked to IS 15298 (Part 2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Strengthening of LT Over Head line at different location in Hendegir colliery colony area, Hendegir project
Cleaning of old garland drain, settling pond and kurse Nallah for monsoon preparation work under Bhurkunda project, Barka-Sayal area
Erection, Dismantling, repairing and maintenance of HT OH line on as and when required basis for a period of 3 months during monsoon under Urimari OCP.
Providing and fixing of 11 KV and 3.3KV Grade station type Surge Arrestor/Lighting Arrestor with maintenance free chemical earth pit on both 33KV and 11KV sub-station under Urimari OCP.
Renovation and protection works of pond near community center in Bijain R and R site under Ashok OCP, Piparwar Area.
Trench cutting for taking physical possession of land falling out side of the awarded patch of MS Mahalaxmi Infra Pvt. Ltd for the purpose of R and R site, service buildings, substation etc. for a peripheral length of approx. 2.00 KM under Ashok Expa
(A) Repairing and A.P.P of roof of Machinery house for 03 Nos. Machines i.e. 195-BE Shovel SI No. Exc-1075, 182 M Shovel SL No. Exc-1851 and EKG-5A Shovel SI No. Exc-2859 of Kathara Colliery and (B) Repairing and A.P.P of roof of machinery house for
Repairing / rewinding of 08 nos. 15 HP/11KW induction Motor, 440 volt, 2830 RPM, make Kirloskar Brothers Ltd, Sl. No.A9AXEK0506 (2) A)XGVA0017 (3) A7ANIFM367 (4) AOXGVK0003 and ( 5 to 8) sl. Missing installed at CISF Colony and Camp, IR
Making arrangement for 415-Volt LT power distribution through busbar panel in various load centers like 5oo kva transformer installed in avantika Campus-Kundi the DG set installed at weighbridge number 13 the generator at weighbridge number 15 for p
Selection of Laboratories for Testing of Products/Material - All Civil Tests; Buyer to use custom filter to input technical specification of the product/material so that service provider may provide price offering accordingly; Sample; Civil
Provision of 25 No.s Additional lightning arrestor by Fabrication of 18 mtr height pole and erection of lightning arrestor on it with Sky netting and suitable earthing for the WBs and 02 No.s Checkpost under Ashok OCP, PPR Area
Repairing maintenance of 4 nos. (1500 KVA, 750KVA, 250KVA and 100KVA Transformer and 01no. 37 KW Motor installed at different places under GM unit, Piparwar Area.
Replacement of the 02 Nos. Rail sensor of the IMRWB (100MT) RCM-1 installed at RCM Siding under Ashok OCP, Piparwar Area.(Compatible with existing Pragati Make In-Motion Rail WB, 100T capacity)
Installation, testing and commissioning of 06 nos. of new 33KV CTs, 400/5-5 Amps in the outgoing Bay No.05 and 06 after dismantling of Old CTs and (b) Carrying out repair, maintenance and installation work in 33KV, 11KV and 440 volt Power sup
Relocation of LT OH line by dismantling and erection of LT OH line towards Benti Basti Under Ashok OCP, Piparwar Area
Arrangement of forced Air Cooling System for 10 MVA Transformer at Ray substation of Township (Bachra) under GM unit, Piparwar Area.
Maintenance with replacement of damaged pole foundation/insulator bracket/clamp tensioning of loose/ saged conductor f 3.3KV O/H l spare line from T.P of 33KV OHTL of north mine edge to rail weigh bridge last DP route length-550M etc as required
Cleaning, testing and painting of test Weights 850 Nos. each of 20 Kg to be stamped and to be used during Stamping of Road Weighbridge 13 under Ashok OCP, PPR Area.
Dismantling and laying of 8 Inch dia MS pipe line for dewatering of Coal Face at Dept Patch and Shifting and re installation of pumps accessories after shifting work by cutting/welding as per requirement based on progression of face at Dept patch ask
Repairing of Tata Bus BR13P 0172 under Ashok OCP, PPR Area.
Revival Of OFC Cable at various locations for smooth operation of CCTV under Ashok OCP, Piparwar Area.
Repairing and Refilling of 20 numbers of fire extinguisher of CHP-CPP, Piparwar
One Time Repairing of the 12 Nos. of Chiller cum water purifier installed at various location under Ashok Piparwar Area.
Repairing and Rewinding of 62.5KVA, 03 Phase 1500 RPM, 415Volts, Frame CM225S, Kirloskar Make Alternator M/C No. 9104AA-08 and Repairing of DC Arc Welding Machine 21.4KW, 2850 RPM, 400/440V Model EMG 450, Adwani Make Sl. No. 15/8304065 of RR Shop,
Work of repairing of damaged electrical wiring of weigh bridge no. 1,5,7,8,12,13 ,14 at different location under Ashok OCP, Piparwar Area.
Quarterly servicing, maintenance and replacement of damaged items as when required 08 No D.G. Sets (5 KVA/10 KVA) at Ashok OCP, Piparwar Area, C CL for duration of 01 year.
Installation of Sky-Net Type Lightning Arrestors at different Weighbridges and RFID Entry-Exit Gates under CHP-CPP, PPR.
Providing of grouting of pole base of various OH lines (HT LT) of mines RR sites etc for safety purpose during monsoon under Ashok OCP Piparwar Area.
Repair and Maintenance of UCWU branch union office at Jawaharnagar under Bhurkunda Project,BarkaSayal Area.
Cleaning of old garland drain, Provision of new garland drain at Sayal-D OCP Mines and provision of Reinforcement Concrete pipe culvert at Sayal-D OCP mines as per monsoon action plan of Sayal-D OCP Under Sayal-D Project.
Vocational Training Services - Version 2 - offline; 4; Buyers Location; Advanced Agricultural Practices
Diversion of the Incoming 11 kV OH line from Karo Mine Patch A to the Karo 11 kV/ 3.3 kV Main Substation, w.r.t. Karo O.C.P., under BnK Area
LUBRICATION SPARES for TZ Shovel
Some Misc Work at Ambedkar chowk, Dhamdhamia under Rohini Project,NK Area.
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6904405 Dated : 17-12-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 4 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 381603.84 Payment Timelines Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 30 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : 2/8 Materials Management B&K Area, Central Coalfields Limited, Ministry of Coal (Bank Account and SFMS platform details provided in buyer added bid specific ATC) (Depot Officer)
Operation and Maintenance Services of Power Generator(DG-Set) - Package 1 - O&M Service with operational and maintenance manpower; 2; Upto 1000 hours