Loading…
Loading…
2,976 results • Latest
Cleaning of existing drain (4000.00 mtrs) along the Haul Road of KDH Under KDH Project,NK Area.
Pump shifting, lowering and installation of 150mm and 200 mm dia. MS/GI pipeline work at Karma OCP and TOPA OCP under Kuju Area.
Fabrication,repairing, painting 02(Two) Nos. base frame and installation of 1000GPM-2000 GPM pump-motor set on the fabricated base frame for coming monsoon 2026 at Tapin North Open Cast Project.
Making and replacement of damaged earth pits with changing of lightening arrestor at different substation under different projects under Kuju Area.
Providing and fixing of Aerial Bunch cable at mines of Karma project under Kuju Area.
Roof treatment / tarfelting of roof, denting of roof, rear wall (including blower housing) and repairing of roof and ladder railing of EKG5A Shovel sl. No. 589 of Dakra project and sl.no. 591 of Rohini OCP, NK Area.
Repairing and maintenance of 7 Nos. earth leakage relay (ELR) make AMP CONTROL, sr. no. N9306-21135, N9306-20777, N9305-20631, N9306-21133, N9305-20622, N9306-20782 and N9306-20791 one no. Intellisys controller sr.no.27386-07332-GCE one no. 48 V DC c
Installation of 03 nos lighting transformer ar mines of different location of Topa Project Under Kuju Area.
Providing and fixing of different ratings TP-MCCB and MCB for different type of motors installed at 4212, 4214, 4216, 4213 and weighbridge and cable termination kit for trailing cables under CHP/CPP, PPR.
AS PER NIT
Rewinding and repairing of 370KW, 3.3KV, 1490 RPM, 3 Phase HT induction motor Marathon make Sl no-3F330891/11
Maintenance of 11KV OH line, replacement of stay sets, disc insulator, pin insulator from ,Murpa Substation to GM Office Under Kuju Area
Supply and installation of 300Watt LED light set at Sarubera Project under Kuju Area.
Bus Hiring Service - Short Term - Local; 52 seater; School bus; 56 & 48
School Bags (V2) (Q3)
Sipper Bottle (V2) (Q4), Lunch Box (V2) (Q3)
Automatic Line Voltage Correctors (Step Type) For Domestic Use (Stabilizer) Conforming To IS 8448 (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6991365 Dated : 09-01-2026 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 43220 Payment Timelines Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Transportation, Laying, extension and dismantling of 6 inch and 8 inch dia MS Pipes for fabrication of two delivery ranges required for installation of two pumps at Hospital Patch Sump Q-2 for the purpose of dewatering of mines and extraction of rese
Extension of 6.6 KV Overhead line from departmental patch of Quarry No. 1 to sump of Quarry No. 01 of Kathara Colliery.
Repairing of 03 Nos. of 6.6 kV, 1250 Amp VCB, Andrew Yule make, Sl. No. 3415, 3416 and 3417 installed at 33/6.6kV, 15 MVA New Substation of KDH OCP, NK Area
Laying and fixing of 8 inch and 6 inch dia pipeline for dewatering of new 0.75 MTY new expansion and Sump No. 04 for monsoon preparation work at Rohini OCP under NK Area
Shifting of Junction Box of Rail Weighbridge at KD Old Siding under Dakra Project, NK Area
Transportation, Fabrications, laying of suction and delivery ranges for installation of high capacity pumps at three different proposed sites near Safitola Patch Sump (Q1), Hospital Patch Sump (Q2) and Kathon Patch Sump for the purpose of de-watering
Repairing and reconditioning of 02 nos joint box of 180KW and 370KW HT motors,02 nos 3.3KW starter and foundation system of 3 phase ALSTOM and Marthon make A/C induction motor of Topa Project,under kuju Area.
Dismantling of 2000 GPM pump from Pundi and installation at Topa along with dismantling of 1000GPM pump from Topa and installation at Pundi for colony water supply under Kuju Area.
Supplying of water through tractor mounted water tanker near mining face area in Pokhariya Tola of Magadh OCP under Magadh-Sanghmitra Area 270 days
Making foundation, Reservoir and operator room for Engine load testing Dynamometer at Engine shop of CRS, Barkakana.
Portable Fire Extinguishers (V3) ISI Marked to IS 15683 (Q2), Wheeled Fire Extinguishers (V3) ISI Marked to Is 16018 (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Electrocardiography (ECG) Machine (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Handling, Transport and Other Mining Services - Percentage quote based - Handling & Transport Service, Feeding, crushing, loading & transportation of Coal for 90 days as per Scope of Work
Vocational Training Services - Version 2 - offline; 4; Buyers Location; TAILORING
Cleaning of drains, hume pipe and providing hume pipes at required location of sec 1 and sec 2 under Rajrappa project Retender
Handling, Transport and Other Mining Services - Percentage quote based - Loading and transportation of 95000 Te Approx Coal from different coal heaps Heap No 1 and 3 of Sayal D Project to Saunda B Railway Siding Mobile crusher of Urimari OCP Barka Sa..
Table - Tennis Table (V2) (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Renault Duster, Mahindra TUV300, Mahindra XUV300, Mahindra Scorpio, Mahindra Bolero, Mahindra Thar, Maruti Suzuki Jimny; 2023; 0-75000 kms; A/C; 12
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - Premium SUV; Toyota Fortuner, Ford Endeavour, Toyota Innova Crysta, Tata Harrier; 2023; 0-75000 kms; A/C; 24 hrs
Custom Bid for Services - communication arrangement Similar Category Internet Connectivity Operation And Maintenance Of Other Machines And Plants Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Goods Transportation service - Monthly Based Service - Within city; Machinery & Equipment; Open Body Taurus
Repairing cum electrical rewiring of guest house along with supply and fixing of on load change over switch at DG set at Rajhara colliery under Rajhara Area
Installation of GOAB and arrangement of earthing at Bhurkunda under Bhurkunda Colliery.
Complete rewinding or repairing of 630KVA, 3.3KV/440V distribution transformer having Sl. No. BHK/630KVA/08 under Bhurkunda Colliery.
providing and fixing of components Digitizer, Load Cell, Junction Box, and External Display for 50 MT Electronic Road Weigh Bridge at Rajhara OCP under Rajhara Area
Trimming of tree branches within 1 mtr span in either side of 11KV,3.3KV,440V and 220V Overhead line and claning of bushes in 2 mtr span of Overhead line poles at different locations of Karma OCP , Sarubera Project and Topa OCP under Kuju Area.
Repairing of brake system,Hub,spring leaf,gear box , kin pin, tail crown tanker body,Tata model water BHM-1273 of Topa Project Under Kuju Area.
Repairing work of (A) 325KW, 3.3KV DOL starter SI. No. HT-010 (B) 140KW, 3.3KV DOL starter SI. No. HT-009 (C) 240 KW, 3.3KV DOL starter make Prabhu SI. No. HT582 (D) 180KW, 3.3KV DOL starter make Teknik Pvt. Ltd., Sl.No SAHD-2711 of GVP Ph-II OCP
Repairing and re-conditioning of (A). 3.3KV VCB, 630A (Field switch) for 1200 GPM pump. Sl. No. 0365, (B) 3.3KV VCB, 630A (Field switch) for 2000 GPM pump. Sl. No. 1742, (C) 3.3KV VCB, 630A (Field switch) for 2000 GPM pump. Sl. No. 2731, (D) 3.3KV VC
Providing, fixing and installation of chemical earth pits for 11 KV overhead line from sawang Sub-Station to Zero Point Sub-station and face pump location of Govindpur Ph-II OCP
Construction and renovation of VIP parking area with tensile fabric and beautification of portico of new building Darbhanga House under Welfare and Services dept. CCL, HQ.
Departmental Estimate for pump shifting of different types of pumps installed at mines during Monsoon for the period of 06 months (180 days) of GVP Phase-II OCP
Repairing of (A). RKB 250, 200 mtrs. head, 2000 GPM, Sl.No.-12972150004, make-Kirlosker and (B) 5- CHR Pump, 200 mtrs. head, 1000 GPM, Sl.No.81269156/20/1, make-Wilo of GVP Phase-II OCP