Loading…
Loading…
2,998 results • Latest
Repairing of loader main center bearing replacement, steering cylinder eye bore repairing and repairing of bucket eye housing by worn out bore material depositing of pay loader sl.no. 284 of Konar Expansion, BnK Area.
Repairing maintenance of 10 nos star-delta, starter different type and make attached with induction motor installed at IWSS river side and filter plant under CCD, Dhori Area.
Repair and runing maintenance of 7 nos. 11KV 5 no. 3.3KV grade switchgears of diferent types and make installed at main sub-station SDOCM.
Repairing Maintenance of 04 nos of transformer of AADOCM.
Laboratory Equipment and Instruments
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Scorpio; Age of the vehicle shall be less than 3 years at the time of opening of tender; 75, 000-1, 00, 000 kms; A/C; 2000KMX372HRS, Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero; Age of the vehicle shall be less than 3 years at the time of opening of tender; 75, 000 kms; A/C; 2500KMX744HRS
Repair and running maintenance of 4 nos. 11KV grade A 11KV, 630A, VCB of 750KVA, 11KV440V transwitch unit NFLP sl no.TRFD00437734 B 11KV, 630A, VCB of 750KVA, 11KV440V transwitch unit NFLP Sl no.TRFD0024 7735 C 11KV, 200A, OCB make southern switchge
Work in respect of fogging through carrier vehicle including material cost like diesel petrol chemical in the all colony of Dhroi Area
Arrangement of temporary DDU automation and security room at ROCP, Rajhara area.
Re-handling of spilled coal/slime from take-up area unit no. 302, 303, 304 belt conveyor and 228 pump outside area at main plant at Kedla Washery
SO(EnM)/GRD/E-NIT/25-26/39 Dtd- 14.03.2026
SO(EnM)/GRD/E-NIT/25-26/32 Dtd- 21.02.2026
Providing and fixing of flanges in MS pipes of different sizes in r/o AADOCM Project Dhori Area
Leasing of Electric Vehicles (Long Term) - Wet Lease; TATA Tigor EV; 2400 KMs & 300 Hours; 36 Months Lease; White
Monthly Ambulance Service (All Inclusive) - All inclusive service except fuel. Fuel charges to be reimbursed separately or arrangement of fuel to be done by the buyer; Type D Advance Life Support Ambulance; Single Stretcher Premium Van; Tata Winger A..
Supply and installation of telemetry system, Annual Maintenance (AMC) of 10 Nos. Electromagnetic Flow Meter with calibration of flowmeter from NABL for 05 years of Amrapali OCP, A-C Area
Repairing and reconditioning of Trunnion ball and cover both side, track chain link and repairing of carrier roller foundation LHS and RHS of BD355 Dozer Sl. NO. 11970, CIL No. T 3731.
Repairing and cleaning of 05 Nos. Radiator assembly
Repairing work of cat walk and hand railing, Rear Suspension and its mounting both side, Tie rod and steering cylinder both side for Dumper Sl. No. 1060 CIL No. D13530 and rep. of final drive assembly of BD155 Dozer Sl. NO. 13584.
Rep. of CK300 Shovel SI No. B762 and B771.
Repairing of LHS and RHS brake drum replacement from serviceable assly, removing blade stabilizer rod broken bolt material filling and fitting new bolt 4 nos. as per size with welding supporting plate of Dozer Sl. No. T-11971 of Konar Expansion, BnK.
Rep. of Dozer 13770.
Repairing of main arm mounting bracket and blade support arm/cross arm, rep. of track frame, rep. of engine and radiator guard, rep. of idler assy. on both sides of Dozer SI No. 104859 and Rep. of cutting blade of Motor Grader SI No. M.G.3111.
Repairing of 02 nos. Arm link assembly and bucket link assembly eye portion, pin bush replacement, bush welding, machining, grinding, link assembly opening and fitting etc. of Pay Loader PL-270 at AKKOCP.
Rep. of IDM30 Drill Sl. No. 201906938.
Rep. of Dozer 13584 and Dumper 60428.
Rep. of Dozer SI NO. T13602 and T12098
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) ( PAC Only ), Toner Cartridges/Ink Cartridges Consumables for Printers (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) ( PAC Only ), Toner Cartridges/Ink Cartridges Consumables for Printers (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
People Link 86 Inch Display Interactive Panel with CPU with, People Link 86 Inch Display Interactive Panel with CPU with warranty 3 Years
Repair work on the engine and transmission oil cooler, including dismantling, fitment, and replacement of the air seal and bolts, repair of the seat and blade arm joint ball stud with material filling, and fabrication of the A-frame for Dozer Sl. No.
Repair of Diesel Bowser (JH02BJ5855) and Truck (JH13H8510) at Birsa Project.
Dismantling of old drum bearing housing of 931belt conveyor head drum, repairing of it including sprocket teeth welding and fitting in head drum of 931 belt conveyor in RLB Section at Kathara Washery
Dismantling of head drum of unit no. 180 B/C and 181 B/C then repairing, fabrication, erection and installation of the same including repairing of its supporting structure in Raw Coal Section of Kathara Washery
Repairing and overhauling of transmission, engine and other related parts and spares of LnT Loader 9020 at Kathara Washery
Repairing of Vehicle No. JH09AX-3271 (Mahindra Truck) deployed at Kathara Washery
Day-to-day removal/rehandling of spillage coal of different Plant section near and around belt Conveyor no. 52,66,74,79,136,138,143, 144,180,181,201 and 202 at Kathara washery
Repair and maintenance of 10 nos. water coolers with R.O.installed at different places of SDOCM
Catering service (Duration Based) - veg, non veg; breakfast, lunch, dinner; Thali as per requirement
Work in respect of fresh wiring of one shiv mandir and one community hall at CCD under CCD GM unit Dhori Area
Work in respect of Repairing and maintenance of Tripplier sl no 01 of 4 5 6 incline and Trippler Sl no 02 of 7 8 incline with maintenance of rail transporting line of Dhori K Colliery
Work in respect of Part repairing or rewinding of 500 KVA 11KV 440V transformer at Raja Bungalow and 315 KVA transformer at Central Hospital Colony GM unit Dhori Area
Providing of Silica Gel in the different transformers at Sub-station HT transformer 11KV/440V installed at different places in G.M. unit, Dhori Area
Providing fixing of LED Bulbs /Lighting fitting with upgrade of existing wiring including fixing of lightning arresters in different shops at RWS Bhurkunda Barka Sayal
Repairing of final drive assly (both side) and repairing of front suspension( both side) and Repairing of battery box with cover, railing, ladder, foot step and catwalk for dumper sl no D10352 at AKK OCP.
Annual Maintenance Contract (02 Years) of 02 nos. RO water purifier, Capacity-250 Ltrs and 40 Ltrs Aqua Guard make installed at Canteen and PO Office under Kathara Washery
Fabrication, erection and making of new by pass chute in between 949 belt conveyor in RLB Section including scrapper, side guard and rollers fitting as per requirement in RLB Section of Kathara Washery
Repairing of side guard and skart rubber, channel, angle, joist and plate etc. of unit no. 52 and 74 belt conveyor of Raw Coal Section at Kathara Washery
Repairing and thorough overhauling of take-up drum U-1200 Gear Box of Unit No. 66 belt conveyor and secondary double roll crusher in gear box SEN-280 in Raw Coal Section of Kathara Washery
Repairing and new making of 04 nos. end cover dala both side (DE and NDE) for 14KW motor, Volt-415, 3 Phase, RPM-1460 vertical motor, (B)repairing and reconditioning of end cover dala both side (DE and NDE) of 11 KW motor, Volt-415, RPM-975 and (C)pa