Renovation of over head street light with providing of PCC poles, Aerial Bunched cable, junction box etc. for provision of 415V overhead street lighting arrangement through AB cable at CPP Plant under Kathara Area
Renovation of over head line with providing of 8 mtr PSC poles, 95 sqmm Aerial Bunched cable, junction box etc for provision of 415V overhead line through AB cable at Asnapani Colony under G M Unit Kathara Area
Renovation of garden lights with 6 sq mm twin core power copper cable, control switch and garden lights etc. for Asnapani park beautification under G M Unit Kathara
Repairing and overhauling of (A). 400A, 3.3KV VCB switch, make-Andrew Yule, Sl.No.-1524 (B). 400A, 3.3KV VCB switch, make-United Transwitch, Sl.No.-058 for colony sub-station of GVP U/G Project
Part repairing, casting, machining, molded and new making or supply and fixing of spares and parts of (A) MLA-5 Pump, make-Kirlosker, Project Sl.No.-GVP Pump/01, 500 GPM, 150 mtrs. Head and (B). 6-CHR Pluro vane-II multistage Pump, M and P Make, S/N-
AMC for repairing and changing of damaged LT and HT stud bushing with cleaning, washing and painting of different types of transformers installed at different places under GVP Phase-II OCP for the period of 01 year or till the quantity exhaust (which
Welding Rectifier Machine, High Pressure washer, Air Compressor, Hydraulic Press Machine, Hydraulic Hacksaw Machine
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - Premium SUV; MG HECTORS; 2023; 75, 000-1, 00, 000 kms; A/C; 24
Maintenance of 3.3kV and 440V/ 230V Overhead line for one year on as and when required basis under Dakra Project, NK Area
Supply, Installation and Commissioning of Water Sprinkler of not less than 28KL capacity (on NCD)
SHUNT TRIP_SERIES TRIP COIL, 11KV_110V, 100VA PER PHASE 3 PHASE PT, RESIN CAST CT CLASS_ 5P 10_ CLASS 1.0, MASTER TRIPPING RELAY, SHUNT TRIP COIL ASSY. 110V DC, BREAKER CHARGING HANDLE, AUXILLARY SWITCH ASSEMBLY 4NO + 4NC, 3.3KV GRADE RESIN CAST POTENTIAL TRANSFORMER, RECTIFIER CAPACITOR UNIT _ 15A, 3.3KV, 3AMPS P.T. FUSE, 3.3KV GRADE RESIN CAST POTENTIAL TRANSFORMER RATIO_ UP TO 300_5, 10VA, CI_1 5P10, EARTH LEAKAGE RELAY, FRONT OPERATED MANUAL TYPE CHARGED MECHANISM
Strengthening of community hall near Durga Mandap at Rahwan under CSR scheme 25-26 of Hazaribagh Area
Construction of 01 no Deep borewell and 01 no room near Awdesh Kumar Mahato at Karukhap under CSR 2025-26 under GM Unit, Hazaribagh Area
Development of R AND R site-I for shifting of PAFs of Phusri village under Tapin South OCP of Hazaribagh Area
Writing of safety slogan coal stock heap no. , Traffic rule non entry gate for outside at different walls and boards of Sawang Washery.
Procurement of Spares for Wheel Separator at Kathara Washery, Procurement of Wheel Separator Spares for Kathara Washery, Proc of Arc Liner, Proc of Bottom Punch Plate
PART-A) Shifting one number pump of 1000 GPM capacity (Make - Kirloskar Oil Engines Ltd) from one place to another place within 70 metre radius (PART-B) Dismantling of 6 inch dia. 200 mtrs. pipeline and welding laying of 250 mtrs. 6 inch dia. pipe
Sewage/Effluent Treatment Plant (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 4 Bid Number : GEM/2025/B/6964607 Dated : 11-12-2025 Bid Document 1/9 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Comprehensive Maintenance Charges Required Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 2288852 Payment Timelines Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 46000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 15 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and 2/9 Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Materials Management Central Coalfields Limited, B&K Area, Ministry of Coal ( Bank account and SFMS platform details provided in buyer added Bid Specific ATC) (Depot Officer)
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Bid Number : GEM/2025/B/6587963 Dated : 11-09-2025 Bid Document 1/9 Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 249000 Payment Timelines Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Vibrometer - Induced Ground Vibration Monitoring Instrument (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Comprehensive Annual Contract of Electrical repairing of Colony No-1,2,3 Quarters and R.R Shop, workshop Kathara under Kathara Area for a period of 02 years.
Repairing of 160 KVA, 11 KV/440 Volt transformer located at colony no 3 of RR Shop Jarangdih
Following repairing is to be done in Dumper Sl. No D61064. (1) Repairing of exhaust manifold rear center and rep of fly wheel. (2) Repairing of Damaged fan blade and fan hub assembly. (3) Complete repairing of Anchor Pivot pin.
Following repairing is to be done in BD 155 Dozer Sl. No 13275 at AADOCM, Dhori Area
Following repairing is to be done in RECP650 Drill Sl. No 6021713 (1) (a) Repairing of 06 nos. pull down and pull up sprocket pin and G.M. bushes 06 nos. (b) Repairing of drive shaft cross changing 02 nos. and guard
On site repair of the idle and bent poles of the 440 V and 220 V OH Electric Line by cutting and welding, in Mine, w.r.t. Karo OCP, under BnK Area
Repair, maintenance, testing and commissioning of Timer Switches with all accessories for control of different lighting circuits at all the Coal Stocks, and the approach road leading to the Coal Stocks, under Karo OCP, BnK Area.
Dismantling, cutting and laying of 8 inch dia M.S. Pipeline needed for diversion of the delivery pipeline of the two nos. of 2000 G.P.M. Pump Motor Sets, in the A Patch in Mine for developement of Haul road w.r.t. Karo OCP, under BnK Area
Painting of O/H line poles, pole numbering and cradling of 11KV, poles for safety at KUGP of mine no-01 of Kedla U/G Project
Lightening protection with providing of earth pit for water supply at Kedla U/g project under hazaribagh Area.
Cleaning, testing , adjusting of C.I. test weights 20 kg for annual verification and stamping of different weighbridges 60,100 Te capacity installed at Magadh OCP under M-S Area
EPSON A4 and Legal Monochrome (Black) Inkjet Computer, EPSON A4 and Legal Monochrome (Black) Inkjet Computer Printer
Extension of overhead line for lighting arrangement in coal stock 59,60,62, and 64 including transporting road to 44 number coal stock approx route length 1600 metres under Magadh OCP, M-S Area
Repairing and maintenance of different unit, assembly of 01 no. Explosive van under Magadh OCP, M-S Area
Electrical Part re-wiring and providing illumination to the branch office of UCWC Sayal-D Project.
Repairing of 20 numbers Bajaj Make 16 metre Highmast Tower lights by changing of LED lights and Various control circuits with heightening of its control panels which installed in various places of mines and Railway siding under Magadh OCP, M-S Area
Providing and Commissioning of 10 KVA isolation Transformer at 03 Nos. road Weigh Bridge under Sayal-D Project
Installation of two number Hexagonal cross arm fabricated in steel tubular pole for lighting at coal stock 49 and lighting arrangement in 44 number coal stock by erecting of 11 mtr tubular pole with led lights under Magadh-OCP M-S Area
Vibrometer - Induced Ground Vibration Monitoring Instrument (Q3)
Supply and Fixing of Danger Notice Plates with Numbering of tubular poles including painting of all poles of Kundi and Chamatu Patch under Magadh OCP,M-S Area
Extension of Power Line at Newly Proposed Checkpost -12, Amarwadih, from Coal Receiving Point Phulbasiya Siding, Line - 04, Approximate Route Length of 1300 Meters at Magadh OCP Under M-S Area
Dala Repairing of Store Truck Reg. No. JH 02 BG 7864 at Tapin North OCP under Hazaribagh Area.
Fabrication of LIGHTING TOWER from old and rejected dumper type of illumination of different places of mines w.r.t Kathara Colliery.
Welding Electrode - Covered Arc Welding Electrode - Basic Type (BEML) (Q3)
Following repairing is to be done in W/S-28017 at AADOCM, Dhori Area
(A) Following repairing is to be done in Dumper Sl. No.-D-1057. (i) Repairing of front drive propeller shaft damaged spider assy. opening, hole making, thread making, spline repairing. (ii) Repairing of rear drive propeller shaft damaged spider assy.
Job of repairing, fitting, painting and stamping of 20KG. CI Test weights at Sawang Washery.
1).Complete repairing of damaged water sprinkling system, 01 set rear suspension of Water Sprinkler Sl. No.- 28363 and centrifugal pump of Water Sprinkler Sl. No.- 28133 (2) Repairing and denting of operator cabin plate, water tank foundation
Following repairing is to be done in Tata Hitachi Model ZX650H BE Shovel Sl. No.- 195. (1). Repairing of cracked ring gear housing car body from inside and outside V cutting, welding and grinding, support plate fitting and welding, (2). Partial