Loading
Loading…
Loading…
1 results • Latest
Construction of Boundary Walls, Gates, and Laying of Paver Blocks for FH at PDHEP, Kishtwar, JnK
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil including carriage including loading and unloading upto 3km.