Loading…
Loading…
1,629 results • Latest
Renewal of Pure Boosa to Foolshahghadhi link Road in km-1, 2
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
BOQ
1- Interior decoration, boundary wall construction, painting and whitewashing of the watchman quarters, and construction of the generator room at the VVIP Guest House of the Government Airstrip
Renewal of Ghorwal Sathinghat Approach Link Road
Renewal of Sherpur Link Road
Faizabad Allahabad Marg se Dabhasemar Nahar Ki patri Kadipur Chauraha Sampark marg ka Naveenikaran ka karya
Construction work of RCC culvert of 1 x 6.00 m span on Pausara canal near Mehboobganj on Gosaiganj Sherwaghat road in Ayodhya district
Work of widening and strengthening of Chaure Beruganj Road
Construction work of four lane road from NH-27 to Government Girls Polytechnic to Ayodhya Ring Road in Ayodhya district (Chainage 0.000 to 4.000) First phase-Chainage 0.000 to 0.700 (Length 0.700 Km)
Renewal of Sursari Coloney Campus Road
Ramdaspur Mijhauli sampark ka Naveenikaran ka karya
Renewal of Dasaipur link road
Renewal of Rotigoan to Bhayara Via Lahbarpurwa Link Road
Construction of Bigniyapul to Akhaiyamau Link Road
Construction of Chikhadi Chilbili link road to Pure Tiwari ka Purwa Link Road
Construction of Mohommadpur Khala Shailak Jalalpur ODR to Showhipur via Shohai Link Road in Block Suratganj, District Barabanki.
Renewal of Patipur to Makunpur link road and Amethi Vishesharganj road to Jairampur link road
Construction of a 2x4 meter span box culvert in place of the dilapidated small bridge at kilometer 12 of the Baraulia Manmatipur Kouhar other district road
Construction of Kadunala Thauri Road to Ram Nihal Dubeys Purva including 5-year maintenance
Construction of a new 3x3 meter culvert in place of the narrow bridge on the Amethi Rajwaha canal at kilometer 7 of the Gauriganj-Musafirkhana road to Basupur other district road in Amethi district
Repair work on the pre-existing minor bridge and approach road situated over a drain at Km 8 of the Musafirkhana-Dharoli-Pichhaura-Matha-Rampur-Majhgawa-Paliya road (Other District Road) in District Amethi
Repair work on the pre-existing minor bridge and approach road situated over a drain at Km 1 of the Chhappan Kot-Pandey Ka Purwa to Nandaur link road in District Amethi
Repair work on the pre-existing minor bridge and approach road situated over a drain at Km 3 of the link road connecting Nandaur village to Dharoli in District Amethi
Repair work on the 3x3m span minor bridge, approach road, and protective works situated over a local drain at Km 1 of the Judiapur-Kouhar road in District Amethi
Repair work on the damaged 2x2m span culvert situated over the Tikri Rajwaha at Km 1 of the Jalama link road in District Amethi
Strengthening Work of Madhopur Padri to Pure Shuklan village via Raghupur Road including 5-year maintenance
Construction work of RCC box culvert in place of damaged culvert in Chainage 4.65, Chainage 6.40 and Chainage 6.85 of Musafirkhana-Palia, Chandapur, Pindara Thakur-Manshahpur, Gunnaur, Matha, Bhusunda, entire Pahalwan Marg (AD)
Construction of a 1x7 meter span RCC box culvert in place of the damaged small bridge on the drain at kilometer 1 of the Nizamuddinpur to Mohiddinpur link road in Amethi district
Renewal of Juwari link road Chainage 0.150 to 1.00 and Chainage 1.00 to 1.200 link road
Construction of Pure Joga link road to Gobri ka purwa via Pure Vishambhar Purwa missing link road
Construction of Pure Balwant to Mau Deviganj Subeha link road
Kalyanpur Barauli Arvat Aimighat Marg ka samanya Marmmat ke sath Naveenikaran ka karya
Renewal of Dehwa Nahar Pul to Lohti Saraiya Pul Link Road
BOQ
BOQ
Construction of 5x5x4 m span Box Culvert at Markamau Chaukaghat Road (ODR) on Katka Nala in damage RCC culvert
Renewal of Rudauli saidpur km 13 to Amaniganj to Kali GosaiLink Road
Renewal of Bhari to Aili Bankhodwa Link Road
Renewal of Junaidpur to Barai Link Road
Renewal of Faizabad Raibarelie road km 39 to Rattapur Link Road
Renewal of Basawanpur Narayanpur Link Road.
Shiaganj to Miyaganj to Maniyarpur link road
Sinhauli Railway Station Link Road