Loading…
Loading…
1,307 results • Recent activity
FDR of different roads under Dumburnagar R.D. Block under PWD(RnB), Gonda Twisa Sub-Division during the year 2026-27/SH- Jungle clearing, surface drain, patch repairing, flat brick soling, patch carpeting etc. (Group-II).
Improvement of Road from Khowai Chowmuhani to Simna via Bramhakunda Length 19.00 Km on Engineering, Procurement and Construction EPC mode
Replacement of existing Hume pipe culvert by RCC Cross Drainage structure 2.00x2.50m on the road Bhallukcherra to Damcherra at CH.11.00 KM under Damcherra Sub Division, PWD R and B during the year 2025 to 2026 SH Box Culvert, Return Wall,WBM etc.
Pot hole repair, Metaling, Patch Carpetting, seal coat, and others allied works etc. during the year 2025-26
Paver block, WBM, Carpetting CD and alied works.
Grouting, BC and Road marking etc.