Loading…
Loading…
1,518 results • Latest
Supplying Installation testing and Commissioning of 15 KVA DG Set at Amarpur Sub Jail Amarpur Gomati Tripura
Providing Internal Electrification along with installation of starter and panel installation for AHU and VRF at the new IPHL under PM ABHIM at Sub Divisional Hospital Melaghar, Sepahijala
Providing illumination at Vidyapith Park under Belonia Municipal Council Belonia South Tripura
Providing illumination at Mahatma Gandhi Statue under Belonia Municipal Council Belonia South Tripura
Installation of CCTV cameras covering strategically important location at Sub Divisional Hospital Melaghar Sonamura Sepahijala Tripura
Providing and installation of inverters along with Maintenance and repairing for Light Fans Switch Boards etc at the Mechanical Sub Division Udaipur Gomati Tripura 2nd Call
Renovation and maintenance work for conversion of existing Female unit I and Male unit I wards into ICU and old emergency room into a general ward at Jayanti Block during the FY 2026-27.
PROVIDING SURFACE EI WORKS FOR JAIL AND TOWER AT KAILASHAHAR DISTRICT HOSPITAL, UNAKOTI TRIPURA
PROVIDING EI FOR OUTDOOR LIGHTS AND UNDERGROUND CABLE AT KAILASHAHAR DISTRICT HOSPITAL, UNAKOTI TRIPURA
PROVIDING IE WORKS AT NEWLY CONSTRUCTED CHEBRI HS SCHOOL, KHOWAI DISTRICT, TRIPURA
PROVIDING EI IN BURN AND ISOLATION CHAMBER AT UNAKOTI DISTRICT HOSPITAL, KAILASHSHAR, UNAKOTI TRIPURA
RENOVATION OF ELECTRICAL INSTALLATION WORK AT DISTRICT HOSPITAL, DHARMANAGAR, NORTH TRIPURA (SECOND CALL)
PROVIDING I.E. WORKS (CONCEAL) INCLUDING FIRE DETECTION SYSTEM IN THE NEWLY CONSTRUCTED POST-OPERATIVE AND OT BLOCK AT KHOWAI DISTRICT HOSPITAL.(3RD CALL)
Urgent maintenance of road from Bijoy para to Manya kumar para under PWD(RandB), Gonda Twisa Sub-Division during the year 2026-27/SH- Jungle clearing, surface drain, patch repairing, flat brick soling etc.
Urgent maintenance of road from Garia para to Bijoy para under PWD(RandB), Gonda Twisa Sub-Division during the year 2026-27/SH- Jungle clearing, surface drain, patch repairing, flat brick soling etc.
Urgent maintenance of road from Narayanpur to Garia para under PWD(RandB), Gonda Twisa Sub-Division during the year 2026-27/SH- Jungle clearing, surface drain, patch repairing, flat brick soling etc.
SH- Jungle clearing, surface drain, patch repairing, flat brick soling etc.
Urgent construction of Retaining Wall at Gonda Twisa-Raishyabari road to Boalkhali H.S. School under PWD (RandB) Gonda Twisa Sub-Division during the year 2026-27 /SH- Excavation for structure, Sand filling, P.C.C, Pucca drain etc.
mprovement of road from Rabicharan para to Chowkider hour para length 1.50km from Ch 0.50Km to Ch 1.00Km under Tulashikhar RD Block during the year 2026 27 SH GSB WBM 2 and WBM3 Carpeting Seal coat Retaining wall CD and protection work etc.
Development of road from Marehaduk to Ampura Moglam road L 2.28 Km under Padmabil Block 24 Ramchandraghat constituency during the year 2026 27 SH Patch metalling Re-carpeting seal coat Surface Drain Pucca drain Paver Block etc.
Development of road from Bhaktapara to KMR School NH 108B L 1.50 KM under Padmabil Block 24 Ramchandraghat constituency during the year 2026 27 SH Patch metalling Re-carpeting seal coat Surface Drain Toe wall etc.
Development of Baijalbari Sub Zonal Office to Athaibari road under PWD RandB Padmabil Subdivision 24 Ramchandraghat constituency during the year 2026 27 SH Earthwork WBM 3 Pothole Repair Recarpeting Seal Coat Surface Drains Protection Works and Roa
iRangauti rd to Baburbazar Irani Rd via Khowrabill, Ch . frm 1km to 3km iiNH-208 A to NH 208 via DM office L1.45 km iii Rangauti Rd to Lxmipr Ch.0 to1Km iv Pakhirbadha Auto stand to Pakhirbada Scl L1Km v Rangauti Rd to Devipur Scl Ch.0 km to 1 km
Imp of rd fm Ichabpur Embankment to Noorpur Trijunction L 1.70 Km under Part-XI Scheme for Special Assistance to States. SH. BM,patch metaling, carpeting, seal coating, etc.Job No. TPCOM180202526 3rd Call
Development of roads from i Tilabazar to Irani 3.00 km Group-I
Development of roads L 3.600 Km I Kailashahar Murticherra road at Murticherra to Samrurmukh L 2.90 km ii Kailashahar Murticherra road at Chandipur to Samrurmukh upto border road L 0.70 km Gr I
Development of roads from I Jamtailbari PWD road to Tachai Tea Estate via Tachai School L 1.79 Km ii Kailashahar Golakpur road to West Kinairchar L 0.96 Km Group I
Strengthening of road from Kanchanpur to Machmara from CH 4.00 km to CH 12.50 Km , under Jampui Hill Sub-Division, PWD R and B during the F.Y. 2025 2026 SH Side shouldering, Repair pot holes, BM, Tack coat, carpeting, seal coat, surface drain, Mtc
SH Stripping of excess soil Removal of unsuitable soil Patch soling protection work surface drains mix class bats etc and allied works
Retaining Wall, WBM-3, Carpeting, Road side CC Drain etc.
Grouting, carpeting, brick masonry toe walls, CC drains and other allied works
Grouting, patch soling, WBM 3, PMC, Brick masonry wall and CD, paver block etc..
Potholes Repairs, tack coat, PMC, clearing and grubbing road land etc
Grouting, Patch Carpeting, Paver blocks, brick masonary toe wall
Patch matalling, Grouting, re-carpetting, Seal coat etc.
SH- Patch WBM- 3, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2026-27
Paver block, brick masonry retaining wall, grouting, carpeting etc
SH-Removal of Soil, Missing Soling, Repairs of Potholes, Unlined Surface Drain, Palasiding Works,paver Bock etc. during the year 2026-27 (Gr-II)
GSB, WBM-2, WBM-3,Carpeting,RCC drain,etc
GSB, WBM-2, WBM-3,Carpeting,RCC drain,etc.
Road development from Sanat Deb house to Ambassa Gym center (L-400.00 metre) at Ward No-4 under Ambassa Municipal council /SH- laying paver block, Toe wall etc from chainage 0.00 Km to 0.20 Km.
Maintenance of Non Residential Buildings at Ambassa PWD quarter complex/SH- Construction of boundary wall (L- 135.00 m), gate and Brick masonry Drain etc. at PWD Quarter Complex near Petrol Pump.
SH- Patch WBM- 3, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2026-27
SH - Patch WBM- 3, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc during the year 2026-27
SH Stripping of excess soil Removal of unsuitable soil Patch soling protection work surface drains mix class bats etc and allied works
Proposed construction of double storied new School Building for Anandabazar H.S. School at Anandabazar, Kanchanpur, North Tripura under State Plan for SPA tied during the year 2014 2015 SH Building portion including internal water supply and san
FDR/ Mtc. of Different roads under Satchand R. D. Block during the year 2026-27/ SH- Patch Soling, Gunny Bags, Wire crates, Surface Drain and Removal of unsuitable soil etc.
Providing installation and commissioning of AirConditioning Machines in the Computer Lab at Eklavaya Model Residential School EMRS Khumulwng Tripura W 3rd Call
WBM-II , III, Tack Coat, Bituminous Concrete etc. during the year 2026-27
Construction of new G-2 storied school building at Natunbazar H.S. School, under Amarpur Sub division , Gomati District ,Tripura under RIDF-XXX during the year 2024-25 /SH- Building portion including internal water supply, sanitary installation, sew