Loading…
Loading…
1,528 results • Latest
RCC retaining wall, brick wall, railings etc.
Metaling, grouting, PMC and sand seal coating, etc
RCC works, GCI roofing, flooring, plastering, painting, Kota tiles, chequered tiles, drain mtc etc./2nd Call
Metaling, grouting, PMC and sand seal coating, etc
Patch WBM, Grouting, Re-carpeting , seal coating, protection work and road side pucca drain etc
Patch WBM, Grouting, Re-carpeting , seal coating, protection work and road side pucca drain etc
Patch WBM, Patch Grouting ,Part Widening of narrow road streches, Bitumimous Macadam, Bituminouous Concrete, Cross Drainaige Works, Protection Works and Surface Drains along with Road Furniture and Marking etc
Soling, WBM, PMC, drain mtc etc._2nd Call
Patch WBM, Patch Grouting ,Part Widening of narrow road streches, Bitumimous Macadam, Bituminouous Concrete, Cross Drainaige Works, Protection Works and Surface Drains along with Road Furniture nd Marking etc
GSB, WBM, 80 MM Paver Block and Cross Drainaige Structurtes and Protection Works etc
SH- Patch WBM- 3, Grouting, Re-carpeting, Tack Coat, Seal coat, pucca drain etc. during the year 2026-27
Patch repairing by metalling, carpeting drainage work etc
Patch repairing by metalling,carpeting drainage work, etc
Development of different road Under the jurisdiction of AMC ward no. 3 and 4 Under 4_Barjala AC during the year 2026_27_SH_ Soling, GSB, Metaling, Brick masonry , Paver block, Grouting, Carpeting ,Seal coat and other allied works.(GR_II)
Renovation/ Mtc. of PWD (RandB) Sub-division office at Karbook, Gomati district Tripura during the year 2026-27/ SH-Extension of room, flooring, roofing, approach, road and sanitary work, etc.
WBM, PMC, Drain, road markings, road studs etc
HIRING OF 01 NUMBER VEHICLE, EECO NOT BEFORE THE MANUFATURE OF YEAR-2025 FOR THE USE OF THE S.D.O., IE SUB-DIVISION DHARMANAGAR, NORTH TRIPURA FOR THE YEAR 2026-27 (SECOND CALL)
Development of different road Under the jurisdiction of AMC ward no. 1 and 2 Under 4_Barjala AC during the year 2026_27_SH_ Soling, GSB, Metaling, brick masonry ,paver block, Grouting, Carpeting ,Seal coat, and other allied works.(GR_II)
Mtc of road from Hranghkhal-Debthang road to Zion tang girls hostel road (Length-2.45 km) (portion from 0.00 km to 1.225 km) /SH- Restoration of different stretches of road embankment damaged due to heavy rain by laying PVC coated GI.......... /Gr.I
Development of road from GP Colony to Wakhirai via Kebel Para (Ch 0.00 Km to 4.00 Km) under 12-Takarjala Assembly Constituency.
Development of roads from (i) Road from NH44 to NH44 via Bridhyanagar Dighirpar. (L 0.700 km) (ii)Road from NH-08 (Guramara Bridge) to Kali Nagar via Durga Nagar (PMGSY) road (L 2.000 km), (iii) Shibbari old Agartala to PWD road Sukanta palli..
Development of road from (i) Chaturdash Debta Temple to Meghli para Sanitala ICDS center(Adjucent Lambucherra JB School) via Meghlipara Tea Eastate, Meghli para GP office (L 1.00 km ) and (ii) Tolakona pump house to Tripura Sundari Nursing..
Development of road from (i) GB road to Palpara Shanitala via Laddu Chowmuhani.(L 1.500 km ) (ii) Trinath Daspara to Banikya Chow. To G.B Rd. (L 1.30 km) and iii) Road from Amtali bazar to beltali Chowmuhani via kalitila Pump house and..
Development of road from (i) Khayerpur to Aralia (T-06) (TR-01-128)(L 1.663 km) and (ii) Approach road of Tulakona Govt. Degree College (L 0.240 km ) under 05-Khayerpur Assembly Constituency.
Development of roads from (i) Jatra bari to Dalura via Khash Noagaon (L 0.630 km ) (ii) Const. of approach Rd. for newly construction PWD Sub-Divisional office at Khayerpur (L 0.300 km) under 05-Khayerpur Assembly Constituency.
Development of road from Bagbari (Parchibari) to Birchandra Thakur Para via Bardhaman Thakur Para PHC, Kwtui Para (L 5.04 Km) under 05- Khayerpur Assembly constituency. (Road to be repaired from Ch.0.00 km to 1.50 km).
Development of road from AA road (Champaknagar) to Khumtia via Bikram Molsom (from Ch 8.00 Km to Ch 12.00 Km) under 12-Takarjala Assembly Constituency (Gr-III)
Development of road from ADC HQ to Dinabandhu para (Ch 0.00 Km to Ch 3.00 Km) under 12-Takarjala Assembly Constituency.
Development of road from Kalashakti to Basanta Sardar Para (Ch 0.00 Km to 2.30 Km) under 11-Mandai Bazar Assembly Constituency.
Development of road from AA road to Narengbari (Ch 0.00 Km to 3.50 Km) under 12-Takarjala Assembly Constituency.
Development of road from Shantinagar to Farm Chowmuhani (Ch 0.00 Km to Ch 3.50 Km) under 12-Takarjala Assembly Constituency.
Earthwork, PCC, RCC, Steel work, Sythetic Paint etc
Earthwork, CC Work etc.
Proposed infrastructure development of Kalkalia High School at Kalkalia under Mohanpur West Tripura sanctioned under RIDF XXIX SH Construction of new double storied school building Building portion ic internal water supply sanitary installations sew
Mte of various roads under Dhakshin Dhanicherra VC Uttar Dhanicherra VC Shantipur VC Karai cherra Machmara VC Uttar Machmara VC Ramguna VC and krishnatilla within the juridiction of PWD R and B pecharthal sub division during the year 202627
Improvement of road from Wandalwng PWD NH To Subhananda para Under Padmabil RD Block L1.00 Km SH GSB,WBM, carpeting and other allied works.
Renovation/Mtc of PWD (RandB) office at Ompi Gomati Tripura during the year 2026-27 /SH-Dismantling works, RCC, wood work, roofing and ceiling work, painting work etc.
Maintenance of Govt. Non residential building during the year 2024_25_ SH_ Construction of Alluminium partition wall, Store room, Repair Of old building portion of Pragna Bhavan at Pandit Nehru complex, Gurkhabasti, Agartala.
Improvement of road from Rasarajnagar Panchayat PWD road to Battali L 992.0 m under Padmabil PWD Subdivision during the year 2025 26 Sh GSB, WBM2, WBM3, Prime coat, Tack coat, Carpeting, Seal coat, Pucca drains, Retaining wall, Box cell, etc.
OR of the road from Hatimara A to Parsuram bari B L 1.704 Km under Tulasikhar RD Block during the year 2026 27 SH Patch WBM III, Recarpeting, Seal Coat, Protection work etc.
Providing Installation and Commissioning of High Wall Split type Air Conditioning system in different locations Medicine storage room Pathology lab Eye OPD and ward etc of IGM Hospital complex Agartala
Comprehensive Annual Maintenance Contract CAMC for 01No of Johnson Lift installed at Amarpur Court Building Amarpur Gomati Tripura for 03 Years 36 Months2nd Call
Providing Installation and Commissioning of 15 TR 20 TR High wall Split type Air Conditioning system in different locations ICTC Biochemistry Orthopedics ENT of AGMC GBP Hospital Agartala
Earthwork, Brickwork, CC Work, Wood work with Tubular Truss, Rolling Shutter, Painting Plaster and other allied works.
Development of road from Kebal Para to NEC Para (Ch. 0.00 Km to 1.30 Km) under 12- Takarjala Assembly Constituency.
Development of road from Rajkumar to Sovamani para (Ch 0.00 km to 1.564 km) under 12-Takarjala Assembly constituency.
Development of Road From ADC HQ to Devsingh Thakur Para via Nabasardar Para (Ch 0.00 Kmto 1.50 Km) under 12- Takarjala Assembly constituency.
Development of road from AA Road to Twisikam (Ch 0.00 Km to 0.893 Km) under 12-Takarjala Assembly Constituency.
Development of road from Meghnath sardar para to Khaswrang Chowmuhani (Ch 0.00 Km to 2.10 Km) under 12- Takarjala Assembly Constituency.
Development of road from AA road (Champaknagar) to Khumtia via Bikram Molsom (from Ch 4.00 Km to Ch 8.00 Km) under 12-Takarjala Assembly Constituency (Gr-II)