Loading…
Loading…
9,362 results • Latest
Widening and Strengthening work on Distt. Border Surpura-Liliya - Khakarki- Indawar - Mokala - Lamba Jatan- Basni Seja-Toonkliya- Gotan upto ODR-32 in km 0/0 to 13/0, 23/0 to 28/0 and 37/0 to 54/0 (BA 2026-27).
Repair Maint servicing to rolling shutter frame false ceiling aluminium joinery Roof sheet gutter valley plinth protection with allied works at 24 ED AF Stn Manauri
8573/E8 SPL REPAIR/REPLACEMENT TO LT OVERHEAD LINE INTO UG CABLE, LT PANEL AND OTHER ALLIED WORKS FOR BDE HQ AREA AT SHAHJAHANPUR CANTT UNDER GE (EAST) BAREILLY
AGE CGN 04 2026 27 SOIL INVESTIGATION FOR THE PROPOSED SITE OF CONSTRUCTION OF HIGH SECURITY WALL ALONGWITH ONE IN NUMBER WATCH TOWER AND ALLIED SERVICES AROUND 1.65 ACRES OF CG LAND AT DEHRADUN UNDER AGE I CG NOIDA
Construction of Trishul Chowk, Ward no. 34 on Patiala Pehowa Road (SH08) RD 3.10 km in District Patiala
Special repair/replacement of wiring, fittings and fixtures at 3 BRD under GE (AF) MC Chandigarh
COMPREHENSIVE MAINT OF OLD UNSV LED FITTING / INTERNAL WIRING DB,MCB,MCCB AND MISC E/M WORKS AT CARIAPPA VIHAR OFFICERS MD ACCN,STN WKSP EME,MT LINE,TAURUS SAINIK ARAM GRAH AND ADJOINING AREA UNDER GE WEST DELHI CANTT-10
Construction of Haripurwa Link Road from Km.- 1 and 2(800) Under Mukhyamantri Gram Sadak Yojna in Financial Year 2026-27 with 05 year maintenance.
Construction of Tin shade in front of EVM ware house at district Sant Kabir Nagar Collectrate.
Construction of two classrooms for training purposes at the 27th Battalion PAC Sitapur
Construction of one barrack for the rest of Constable Drivers in the Transport Wing of the 27th Battalion PAC Sitapur
Construction of Boundarywall at Inspection House Ramsanehighat
Construction of Udanpurwa (Udai) Link Road from Km.- 1 and 2(500) Under Mukhyamantri Gram Sadak Yojna in Financial Year 2026-27 with 05 year maintenance.
New construction of the Pakriyapurva link road. (Dhaurahara)
New construction of the link road from Babiyari to Behannanpurva. (Nighasan)
Construction of Kumharanpurwa Link Road from Km.- 1 and 2(200) Under Mukhyamantri Gram Sadak Yojna in Financial Year 2026-27 with 05 year maintenance.
Construction of Gondaura Link Road to Satpediya Road Via Ramwapur Chauraha from Km.- 1 Under Mukhyamantri Gram Sadak Yojna in Financial Year 2026-27 with 05 year maintenance.
Construction of Kaharanpurwa Link Road from Km.- 1 and 2(600) Under Mukhyamantri Gram Sadak Yojna in Financial Year 2026-27 with 05 year maintenance.
New construction of the road from Umariya Kala canal culvert to Lonpurva (Benipurva Raja) in Behjam Development Block (5-cell 3.00m x 3.00m box culvert). (Lakhimpur)
Construction of the missing link between the Ganeshpurva and Tendua link roads. (Srinagar)
Construction of the missing link between Kauraiyasanjar and Jamkohana. (Lakhimpur)
Construction of a road on the Sharda River embankment, connecting Village Khamariya to the Srinagar link road. (Srinagar)
Construction of Deendayalpurwa Link Road from Km.- 1 Under Mukhyamantri Gram Sadak Yojna in Financial Year 2026-27 with 05 year maintenance.
New construction of the link road from Babiyari to Kathiriyanpurva. (Nighasan)
Construction of Ganjwa Mohammadpur to Dhaukalpurwa Link Road from Km.- 1 to 3(600) Under Mukhyamantri Gram Sadak Yojna in Financial Year 2026-27 with 05 year maintenance.
New construction of the Ramnagar link road. (Nighasan)
Construction of Paschimpurwa Link Road from Km.- 1 Under Mukhyamantri Gram Sadak Yojna in Financial Year 2026-27 with 05 year maintenance.
Construction of Tamolipurwa to Sathariya Kodwa (Korahwa) Link Road in Gram Panchayat Badagaon from Km.- 1 to 3 Under Mukhyamantri Gram Sadak Yojna in Financial Year 2026-27 with 05 year maintenance.
New construction of the Tapri Hasnapur link road. (Dhaurahara)
Construction of Shekhdaheer Road to Nazim Chauraha Banjari Gaon Via Kalyanpuri Colony Link Road from Km.- 1 Under Mukhyamantri Gram Sadak Yojna in Financial Year 2026-27 with 05 year maintenance.
Construction of Koriyanpurwa Link Road from Km.- 1 Under Mukhyamantri Gram Sadak Yojna in Financial Year 2026-27 with 05 year maintenance.
Construction of Premnagar Link Road (dhaurahra)
Construction of Chivatipurwa Link Road from Km.- 1 to 3(100) Under Mukhyamantri Gram Sadak Yojna in Financial Year 2026-27 with 05 year maintenance.
New construction of the Raipur (Revenue Village Dulhi) link road. (Dhaurahara)
Construction of Ahiranpurwa to Kumharanpurwa Link Road from Km.- 1 Under Mukhyamantri Gram Sadak Yojna in Financial Year 2026-27 with 05 year maintenance.
Construction of a 1x6 m span R.C.C. box culvert, approach road and additional approach road on Tadiyawan road Km-7 to mampur Bhaisari Road Km-2 to Bharav Road in Dist-Hardoi
SPECIAL REPAIR OF GAUR TINICH ROAD HOTE HUE GAUR GAON ROAD
RENEWAL WORK OF GAIGHAT- KATARNIYAGHAT-MOTIPUR- PALIYA KM-5 TO LEFT TULSIRAMPURWA LINK ROAD IN DISTRICT BAHRAICH FINANCIAL YEAR 2026-27 VIDHAN SABHA-BALHA (USING HOT MIX PLANT)
SPECIAL REPAIR OF BABHNAN HALUWA ROAD TO PANCHMOHNI LINK ROAD
SPECIAL REPAIR OF RAJMARG-28 TO GODSARA TIWARI ROAD
SPECIAL REPAIR OF AMAULI RAJWAPUR ROAD TO HANSRAJPUR ROAD
SPECIAL REPAIR OF MARWATIYA TIWARI PRADHANMANTRI SADAK TO RAMAPATIPUR ROAD KA AWASHESH BHAG
SPECIAL REPAIR OF GAUR PAIKOLIYA ROAD TO AMBEDKAR GRAM SEMRA AAMA ROAD
Construction of a 3x6 m span box culvert (1.60 km) approach road and additional approach road from Beruijor to Ajanbaba (Shiv Temple) over the Sai river in Dist-Hardoi
Construction of an interlocking tile road from the CC road to Ravindra Singh house in Village Rohinda, Block Khurja.
Construction of an interlocking tile road from Bhagat Ji temple to Devendra house in Village Faridpur, Block Sikandrabad.
Construction of Missing Link/ Non Patchable Roads Under Package No. RJ-31-07/ ML-NP/ 2026-27 in Distt. Sriganganagar
Construction of Missing Link/ Non Patchable Roads Under Package No. RJ-31-11/ ML-NP/ 2026-27 in Distt. Sriganganagar
ADDITIONAL REPAIR AND MAINTENANCE AT E.M.R.S. RISHABHDEO
CONSTRUCTION OF WATER TANK AND OTHER UTILITY WORK AT EMRS RISHABHDEO