Loading…
Loading…
21,032 results • Recent activity
Repairing of make Tata Pick-up van Reg .No. JH02D-8003 of Parej East O/C Project Under Hazaribagh Area.
Repairing of Tripping Mechanism , Overcurrent tripping ,Over-voltage, Under-voltage tripping and making circuit of 1 Nos 3.3 KV/400AMP field switch of CK-300 SL No.-167 and one nos sparable fieldswitch sl.vo. VCB9016 For of KDH Project
Erection of LT OH line and dismantling overhead lines at Hingula OCP mines (HA) for period of one year.
Precast RCC Slab Fencing of Mine Boundary, Coal Dump and siding under Bastacolla Area
Fabrication of one number of complete drive head with loop structure for installation of 1200 mm belt conveyor for evacuation of coal from panel-5 at CM2 section in R-V seam located in MIC, under Jhanjra Area
Loading, unloading and placing of Test weights (20 Kg C.I each) at the weighbridge platform during weights verification/Calibration of weighbridge no-2 installed at PEOCP under Hzb. Area. for verifications during 12 months at an interval of 2 weeks.