Loading…
Loading…
5,991 results • Latest
Desilting of 450mm dia. peripheral sewer line from 9/54 Kirti Nagar Industrial Area to Kirti Nagar Metro Station in Ward Moti Nagar in AC-25 Moti Nagar under EE(C)-15.
Replacement of old-damaged and under Sized sewerage network near H.No- 28/2E/26B/1 to H.No-466 Ravi Dass Mandir Maharathi Colony Jwala Nagar Shd under ward 216 AC-62 in EE(C)-08.
Replacement of old-damaged 100/150mm dia water line near H No-27/90 Lahori gali to H.No27/94/14 pandav road near Amar Asharam Gaushala Jawala Nagar in ward 216 Shd AC-62 under EE(C-08).
Restoration of old damaged settled sewer line by replacement of 300 mm dia pipe at 340/465B at Friends colony industrial area ward no. 216 AC-62 under EE(C)-08.
Improvement of water supply by interconnection from 250 mm dia water line by P/L 250 mm dia from Mrignayani chowk to F Block Dilshad Colony UGR in Dilshad Colony ward no-217 in AC-62 under EE(C) -08.
Re-construction of drainage/storm water system and other allied work adjoining the reservoir of the Clear Water Pump House at Chandrawal Water Works-II.
Construction of roads near old pump house Okhla Water Works.
P/L interlocking paver block and other allied civil works near barrage at Wazirabad WW.
Construction of pathways and footpath along Yamuna side boundary wall at Wazirabad WW.
Procurement of insulating rubber mats for various secondary BPS under Bijwasan AC-36.
Hiring of 01 auto desilter for maintenance of sewerage system of AC-25 Moti Nagar under EE(C)-19 (Re-invite).
Hiring of 01 no. auto desilter machine for maintenance of sewerage system of Moti Nagar under AC-25 Moti Nagar under EE(C)-19 (Re-invite).
Replacement of old and damaged sewer line in Gali No. 8, Lower Side Chuna Mandi, Pahar Ganj AC-23 under EE(Civil)-15.
Repair and maintenance of tubewell G. I. water network water lines in Pahar Ganj Ward 82, Karol Bagh Constituency AC-23 under EE(C)-15.
Reconstruction of damaged manholes in Multani Dhanda, Main Bazar, Nehru Bazar, Double Storey Motia Khan and raising, repairing of manholes in other adjoining areas in Pahar Ganj Ward in Karol Bagh Constituency under EE(C)-15.
SITC of 450 KW/600 HP VFDs for Nilothi SPS under ISP Package-2
Removal of sand, sludge and floating material at intake of sangam raw water pump house to lift raw water from Yamuna under Bhagirathi WTP.
Removal of contamination by repair of damaged water line portion and shifting damaged water connections in Kardampuri, Balbir nagar,Babarpur,Chajjupur and its adjoining area in Babarpur AC 67
Renovation of BCH Make LT panel installed at Nilothi SPS under ISP Package-2
Hiring of 2 Nos. 25HP Sewage Electri Trolley For Immediate Relief in Maharani Bagh and Adjoining areas under Kalkaji Constituency AC-51.
Electrification at JE(Sewer) Store Seelampur in AC-65. (Re-invite)
Repair and maintenance of RWH system in ward Tughlakabad Ward No. 178 Tughlakabad Constituency AC-52 under EE(C)-32.
Repair and maintenance of sewerage system Kalkaji ward-175 in Kalkaji Constituency AC-51 under EE(C)-33.
Hiring of jetting cum suction machine 4000 Ltrs. capacity for maintenance of sewerage system in Ward No. 246, 247 and 248 in Karawal Nagar AC-70 (Re-invited)
Construction of boundary wall, repair and maintenance of existing structure and jungle clearance at JE store Nanaksar in Karawal Nagar Constituency under EE (C)-36
SITC of CCTV s at various location inside the premises of Vasant Kunj Sec A SPS.
SITC of CCTV s at various location inside the premises of Sarita Vihar SPS.
SITC of CCTV s at various location inside the premises of Vasant Vihar SPS
Construction of 03 Nos. of new RWH alongwith repair and maintenance of 06 Nos. of already existing RWH in Delhi Govt. School Building and Karawal Nagar Bus Terminal premises in Karawal Nagar Constituency under EE (C)-36
Removal of Chocking from Suction and Delivery side of pump Set No.1 at Sarita Vihar SPS
Strengthening Renovation of Shutters installed at Dakshinpuri SPS
Repair Renovation of Upadhaya Make Suction and Delivery valve of Set No.1 installed at Sarita Vihar SPS
Repairing of wireless signal transmitter panel with other allied works at Delhi Gate Effluent Filling Points
Lifting n Disposal of Floating Materials and debris from Sarita Vihar SPS
Repair Rrenovation of Jyoti make 3.3 KV HT panel for HT Motors installed at Sarita Vihar SPS
Removal and Installation of flow control system with other allied works installed at Delhi gate drain
Deployment of staff for operation and maintenance of Daulatpur BPS under Matiala AC-34.
Maintaining Water supply by Deployment of staff for operation of 3 Nos BPS i.e. Sec-19 Pkt 1, Pkt 2 and Pkt 3 under Command Tank -4 in Dwarka AC-34
Maintaining Water supply by deployment of staff for operation of Bindapur 1 and 2 BPs under Command Tank-2 in Dwarka Sub-city.
Deployment of staff for day-to-day work at Command Tank-1 in Dwarka Sub-city.
Maintaining Water supply by deployment of staff for operation of Sunrise Appts., Dreamland Appts., Jai Maa Durga Appts., Navdeep Appts. and Manglapuri BPS in Nasirpur area in Dwarka AC-33
Deployment of staff for day-to-day operation and minor maintenance at command Tank-6 in Dwarka Sub-city.
Electrification with allied lighting and wiring work at C- Block Park Dilshad Garden SPS.
Supply and Installation of water cooler and desert air cooler at various installations under sub division AE (E and M)-II in AC-67. (Re-invite)
Construction of scrap yard for storage of scrap at Bawana WTP under EE(C)Plant,WW-HP.
Construction of tubewell rooms for bore/tube wells at Haiderpur WW Phase-II under EE(C)Plant,WW-HP.
SITC of CCTV Security Surveillance system at Loni Road BPS in AC-64.
Construction of room/cabin for supervisory staff and basic administrative use at incineration unit at Haiderpur WW Phase-I under EE(C)Plant,WW-HP.
Construction or room for operational and equipment storage purpose at Raw Water Pump House Phase-II.
SITC of CCTV Security Surveillance system at East of Loni Road SPS in AC-64.