Loading…
Loading…
554 results • Latest
Stereo Microscope (V1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
USB Type External Solid State Drive Capacity Greater Than256 GB (V2) (Q2)
AMC (Annual Maintenance Contract) of Radio towers for two years.
Completion of Balance work of RE/RS wall and Ramps on both side at Yamuna Vihar and Bhajanpura ends of PWD flyover of Integrated Elevated Viaduct.
Development of container office cum store, circulation road, drainage and part renovation of existing DMRC Phase-IV project office at Malviya Nagar office of CPM-6.
USB KVM Extender for PIDS-PAS Ph-3
Shunt Signal Assembly Unit
SITC of ICT IOT based Health Hygiene Monitoring
NIAHH Nylon Bristle Hand Held Scrubbing Brush
BSC HISHEEN Liquid Enamel paint remover, Warranty 12, BSC HISHEEN Liquid Enamel paint remover, Warranty 12 Month
Construction of CMV/ETU building as a part of Depot Augmentation in Sarita Vihar Depot of Delhi MRTS Phase-IV.
IMPLEMENTATION OF NEW COMPANY CODE AND CUSTOM DEVELOPMENT IN SAP.
OH kit for grease coupling
Main Door Lock with Limit Switch for Thales CS24 TVM
Monthly Basis Cab & Taxi Hiring Services - Sedan; 1500 km x 275 hours; Local, Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 275 hours; Local, Monthly Basis Cab & Taxi Hiring Services - Sedan; 2500 km x 275 hours; Local, Monthly Basis Cab & Taxi Hiring Services - Sedan; 3000 km x 275 hours; Local, Monthly Basis Cab & Taxi Hiring Services - Sedan; Night Vehicle 2000 km x 300 hours; Local, Monthly Basis Cab & Taxi Hiring Services - Sedan; Daily basis vehicle requirement as per BOQ rates; Local
Waiting Area/Airport Terminal/Public Place/Reception area Chair or Seat (V2) (Q2) ( PAC Only ), Metal Shelving Racks (Adjustable Type) conforming To Is 1883 (V2) (Q2) ( PAC Only ), Executive Table (V4) (Q2) ( PAC Only ), Steel Almirah/Cabinets (V4) (Q3) ( PAC Only ), Steel Cloth Lockers (V3) (Q2) ( PAC Only ), Chair for General Purpose (Q2) ( PAC Only ), Revolving Chair (V5) (Q2) ( PAC Only ), Modular Table/Meeting Table/Centre Table (V2) (Q2) ( PAC Only ) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Manufacturing and Supply of Field Units duly fabricating PCBs, assembling PCBs with components, assembling Chassis, and testing including associated accessories for Depot field trials for iCBTC Project.
AC Current make fluke model i3000S
FMM FILTER (PH-2) P. NO. 2258290009, MAKE-CHICAGO PNEUMATIC, OIL SEPARATOR (CHICAGO PNEUMATIC) STOCK CODE 2903087100 OF CHICAGO PNEUMATIC, PHASE SEQUENCE RELAY PH-2 P. NO. 909523500 MAKE-CHICAGO PNEUMATIC, Clean oil(500ml pack) stock code of M/s Chicago pneumatic is 9095954669 PACKING SIZE= 500 ML
Supply, Installation, Testing and Commissioning of Fire Detection and Suppression System, Testing and Commissioning of Master Controller
Lateral Damper of Bogie/RS-3, Vertical Damper of Bogie/RS-3
Design, Manufacturing and Supply of Standard Gauge UIC-60 Turnouts and Scissors Cross Overs for Ballastless Track of Line-08 Extn. of Delhi Metro Phase-IV Corridors.
High End Laptop - Notebook (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Unbranded 2x400W as per Cl.2.11 of IS:13383 (Part 3):1992 latest, Unbranded 2x400W as per Cl.2.11 of IS:13383 (Part 3):1992 latest (Symmetric 1 Plane)
VCC Detection Unit Type C9472 Left Side, VCC Detection Unit Type C9472 Right Side
Horn Fabrication for MC type pantograph, AIR FILTER FOR BRAKE UNIT 4.07, 5.01 and, SAFETY VALVE 11 BAR, Suction Fan Radiator Fan of RS2 comp, BONDED WASHER for APPLICATION 4.34 EP, OH KIT CM COCK RED AGTU 13.12, O-RING, Oil Level Indicator of AGTU for RS-2, Levelling Valve Stem, Anti Vibration Mount of AGTU, Temperature SensorSaloon and cab HVAC
Ball Point Metal Markers (V2) (Q3)
Maintenance of Existing Borewells, Rain Water Harvesting Pits, Installation of New Borewells and Construction of New Rain Water Harvesting Systems at Airport Express Line, Dwarka Sub-city (Line-03), Line-9 and Dwarka Depot.
A3 Size Multifunction Printer (MFP) (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Bill of Quantities for Stationery Items 2026
Steel Bookcases conforming To Is 7761 (V2) (Q2) ( PAC Only ), Composite Office Tables conforming To Is 8126 (V2) (Q2) ( PAC Only ), Steel Almirah/Cabinets (V4) (Q3) ( PAC Only ), Metal Shelving Racks (Adjustable Type) conforming To Is 1883 (V2) (Q2) ( PAC Only ), Modular Table/Meeting Table/Centre Table (V2) (Q2) ( PAC Only ), Executive Table (V4) (Q2) ( PAC Only ), Sofa (V3) (Q2) ( PAC Only ) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
'B' check kit for 8 wheeler CMV
Dismantling, Shifting and Recommissioning of Radio Tower.
Procurement of Voith make spares
Relay Module (Q3) ( PAC Only ) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7088092 Dated : 13-01-2026 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
46" TOUCH MONITORS, 24" TOUCH MONITORS, 23.8" NON TOUCH MONITORS
Tilt Servo Valve
GRAPHICS CARD XVR 300, GRAPHICS CARD XVR 100, RS30 ATS NETWORK SWITCH (18PORT), RS30 ATS NETWORK SWITCH (10PORT)
FOLDING WHEEL CHAIR WITH CUSHIONS, Make: Godrej, 2nd Year CMC of Godrej make Wheel Chairs, 3rd Year CMC of Godrej make Wheel Chairs
POWER MODULE OF SYMETRA UPS Model- SYPM4KI Make- M/S Schneider Electric, INTELLIGENT MODULE OF SYMETRA UPS Model- SYMIM5 Make: - M/S Schneider Electric, BATTERY MODULE OF SYMETRA UPS, Model- SYBTS Make: - M/S Schneider Electric
Refurbishment and Redevelopment of Vertical Garden at piers near DDSC, SVMB and APL in Line-7.
Refrigerant Gas (Q3) (3 (3 ))
Service overhauling and Retrofitment work in 415V AC GE Spectronic make LT breakers along with Supply, Installation and Testing of ABB make 415V AC LT breakers components in existing ABB LT breakers installed in DMRC network.
Revolving Chair (V5) (Q2) ( PAC Only ), Executive Table (V4) (Q2) ( PAC Only ), Wooden Shelf/Case/Rack Credenza/Modular Storage (V2) (Q2) ( PAC Only ), Sofa (V3) (Q2) ( PAC Only ), Modular Table/Meeting Table Centre Table (V2) (Q2) ( PAC Only ), Chair for General Purpose (Q2) ( PAC Only ) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Heat shrink straight through joint for 66 KV Aluminium conductor, XLPE Cable size - 1CX800 sq mm
Hiring of Tea/Coffee Vending Machine
Refrigerant Gas (Q3)
Monthly Basis Cab & Taxi Hiring Services - Hatchback; 3000 km x 275 hours; Local, Monthly Basis Cab & Taxi Hiring Services - SUV; Daily basis vehicle requirement as per BOQ rates; Local
Pressure Belt with 12 Grooves suitable to Schindler make Escalator SVH399826.
Supply, Installation, Testing and Commissioning for Shifting / Modification of 33kV, 11kV and LT Electrical Utilities of UHBVN infringing in Haryana Portion of Rithala - Kundli Corridor of Delhi Metro Phase - IV.