Loading…
Loading…
859 results • Latest
Work of Construction of civil works for 66KV Capacitor Bank at 220KV S/S Badal
Procurement of 11kv cable termination kits
Construction of 1 no. 20 MVA 66/11 kV T/F plinth and allied civil works at 132 kV S/S Moga-Dhalleke
Procurement of Hydrazine Hydrate (80 percent) for GHTP, Lehra Mohabbat and GGSSTP, Ropar for the year 2026-27. Quantity as per NIT
Outsourcing of Labour Part for Erection, Testing and Commissioning of New 11KVLT/HT Lines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Set for Various Works under Ds City West.
Outsourcing of Labour Part for Erection, Testing and Commissioning of New 11KVLT/HT Lines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Set for Various Works under Ds Model Town.
Restoration of damaged CC lining slabs in between RD 0 M to RD 602 M on both sides of MHC-II during the year 2025-26
Filling of cavities behind CC lining slabs by Random grouting in between Rd 1846 M to RD 3800 M on both sides of MHC-II during the year 2025-26
To carry out the work of housekeeping such as cleaning, sweeping and maintenance of office lawns of various offices of PSPCL situated under DS Circle Jalandhar for the year 2025-26
To carry out the work of housekeeping such as cleaning, sweeping and maintenance of office lawns of various offices of PSPCL situated under DS Circle Hoshiarpur for the year 2025-26
Extension of Switch House Building at 66KV S/S Tohra (Under RDSS)
Extension of Switch House Building at 66KV S/S Galib Kalan (Under RDSS)
Various Works such as Releasing of T/Well Connections, GSC/ISC Connections, Deloading of Overloaded T/Fs, Shifting of Meters Outside Consumer Premises, Earthing of DTs/Lines or any Development Works Under DS Division PSPCL Garhshankar
Construction of all technical civil works at the 66KV S/S Fatehgarh (Under Op. Circle, Faridkot) Under RDSS
Outsourcing of Labour Part for Erection Testing Commissioning of New 11KV LTHT Lines on RailPCC Poles Distribution TFs Augmentation Sagging of ACSR of HT LT Lines Cables laying Guarding Stay Set for Various Works such as Releasing of TWell
AMC for Routine Preventive Breakdown and Shutdown Maintenance of complete EMD Equipment Instruments of BTG BOP AHP CHP
Outsourcing of Labour Part for Erection Testing and Commissioning of New 11KVLT HT Lines on Rail PCC Poles Distribution TFs Augmentation Sagging of ACSR of HT LT Lines
Outsourcing of Labour Part for Erection Testing and Commissioning of New 11KVLT HT Lines on Rail PCC Poles Distribution TFs Augmentation Sagging of ACSR of HT LT Lines
Outsourcing of Labour Part of LT HT Network Safety Compliance and System Strengthening Project by upgrading the LT HT distribution infrastructure in municipal council class 2 AND 3 Under Circle Jalandhar
Construction of extension in SHB and Addl 31.5MVA T/F Plinth , burnt oil pit and allied civil works at 220kv ss Ghulal
Supply Installation Testing and Commissioning of Temperature sensors and CCTV (PTZ) Cameras etc. at GGSSTP, PSPCL, Roopnagar and sending real time feed to PPCB server.
Coal Valves, Mill Reject Handling system, transportation/ Dumping of Coal Mill Reject etc. on Lump sum basis at GHTP for a period of two year.
Supply, Erection, Testing and Commissioning of Dust Opacity Analysers for U 4 , 5 under CI-5 cell, GGSSTP, Ropar
Supply of Consumables and other materials for PLC, DCS and LCP.
Outsourcing of One No. Scorpio/Xylo/Mahindra Bolero/TUV 300 or equivalent in price Diesel vehicle (Model not more than five years old) for one year for the O/o Sr. XEN/ Technical Audit (Civil), PSTCL, Patiala
Supply of Analytical Instruments in BOP area.
shifting of 66 kV line in the premises of M S Apra Developers Pvt Ltd
Outsourcing of Labour Part for Erection Testing Commissioning of New 11KVLT HTLines on Rail PCC Poles Distribution TFs Augmentation Sagging of ACSR of HT LT Lines Cables laying Guarding Stay Setfor Various Works under division city moga
DNIT for laying of Tower Foundations,Erection of Towers,Stringing and Sagging of conductor for Part A Re arrangement to provide 2nd connectivity to 220 KV SS Naraingarh 1. 220 KV DC line 220 KV Khassa to Chogawan. 2. Disconnecting 220 KV Khassa
Outsourcing of Labour Part for Erection, Testing and Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT under DS Division Budhlada
TO CARRY OUT ANNUAL OVERHAULING WORKS (LOWER MECHANICAL PORTION ONLY) OF MOTORIZED and PNEUMATIC OPERATED VALVES and GEAR BOXES OF UNIT 5 AT GGSSTP, RUPNAGAR
Supply and Delivery of ISI marked Single Core 1.1 kV LT XLPE Insulated, PVC Sheathed, Aluminum Conductor unarmoured cables
Work of Construction of extension in 11 KV Control Room Building at 220 KV S/S Abohar
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT HTLines on Rail PCC Poles, Distribution TF
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works such as Releasing of T/Well C
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT HTLines on Rail PCC Poles, Distribution TF
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT HTLines on Rail PCC Poles, Distribution T Fs, Augmentation Sagging of ACSR of HT LT Lines, Cables laying, Guarding, Stay Setfor Various Works such as Releasing of T Well C
Shifting of 66KV BBMB Tanda Road T-off Radial in Surya Enclave Playground Deposit work Punjab Water Supply and Sewerage Board
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT HTLines on Rail PCC Poles, Distribution TF
Outsourcing of Labour Part for the pilot project to rectify low-lying PVC cables at road/street crossings under 3 No. ULB, Budhlada, Bareta and Boha Under DS Division Budhlada.
Work of routine loading and unloading of material from transporters godown railway station running of diesel pump checking shifting restacking of material from other store to GHTP store for 2 years
Outsourcing for the activity of Special Watch and ward of UBDC Hydel channel from RD 0ft to RD 65640ft Both Banks for the 2025 -26
Design, Manufacture,testing, supply and delivery of 66kV and 220kV SF6 breakers.
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT HTLines on Rail PCC Poles, Distribution TF
Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT HTLines on Rail PCC Poles, Distribution T Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works such as Releasing of T Well
Outsourcing of Labour Part for the pilot project to rectify low-lying PVC cables at road/street crossings under 5 No. ULB, Bhagta, Maluka, Kotha Guru Bhairupa and Nathana Under DS Division Bhagta Bhaika
Annual Contract for Rewinding/Re-caging/ Re-staggering and other repairs of HT Motors of GGSSTP, Rupnagarfor 2026-27
Outsourcing of Labour Part for Replacement of low-lying PVC at road crossings with 4-core cables and re-locations of MCBs etc
Procurement of Hydraulic Actuator Device (Servo motor) 336/50 for PA fan model no- 17/11.8-2
The work of Breakdown, Periodical, Preventive and Shut down maintenance of all 6.6 KV HT Switchgear of main plant (Unit 3,4)Stage-II ,(unit5,6) stage-III, Ash Handling Plant-Stage-III , Coal Handling Plant including 6.6 KV HT