Construction of 02 nos. transformer shed at 10 no quarry under Chapapur Colliery.
Construction of 04 nos Retaining wall at different places shown in enclosed mine plan in R VI seam of MIC under JPC
(1) Installation commissioning and dismantling of 1000mm Conveyor belt setup for Panel No.B1 and B3 in RVIIA seam for SHCM package and Installation and Commissioning of 1200mm wide X 420M long and 1200mm wide x 385m long conveyor belt for Panel C
Construction of 15(fifteen) nos. Sectionalisation Isolation stoppings around the proposed stowing panel RVII S 10 in RVII seam of Sankalpa Khani Incline of Bankola Colliery.
Installation and commissioning of 3x2MVA 11kV/3.3kV Substation with Earthing and cable connections at Shyamsundarpur colliery under Bankola area
Installation and commissioning of 3.3kV substation at sarpi bore hole no.2 for operation of submersible pump at Shyamsundarpur colliery under Bankola area