Loading…
Loading…
3,417 results • Latest
Making grizzly over the hoppers (4nos) of TRS at new CHP SB Area
Replacement of water supply pipe line at various colony of Parbelia Group under Sodepur Area.
Complete mechanical repairing with rotor shaft change for 2(two) nos. 40HP C.G. make 550Volt, 960 RPM Tapper shaft motor of Tapper shaft motor of N.K.J. Unit under Khandra Colliery.
Complete repairing and rewinding of 1(one) no 12.5HP550V and 2 nos of 40 HP 550v motors of Bankola colliery
Complete repairing and overhauling ECE make 11KV-400 Amps OCB at 3 n 4 Pit Incline of Shankarpur Colliery under Bankola Area.(Retender)
Day to day maintenance activities related to HEMM working at Nakrakonda Kumardihi B OCP.
Repairing of Auto lubrication system for hydraulic excavator Poc 14/G 10243.
Custom Bid for Services - Tree Cutting, cleaning, repairing and maintenance of vertical Garden Similar Category Facility Management Services - LumpSum Based Operation And Maintenance Of Other Machines And Plants
Repairing of Front Body, Hood, Canopy, driveline and Leaning Cylinder of BG 825 Motor Grader Sl no. 25097.
Maintaining AC system in 60Tand 100T (out of warranty) Dumpers , Water Sprinklers, Motor Graders and Cranes.
Repairing and reconditioning of both sides(LHS and RHS) lift cylinders and tilt Cylinder of BD 355 Dozer sl no. P12105.
Comprehensive annual maintenance contract (AMC) for maintenance of D and B-Type single storey quarters including upkeeping for a period of 2 (Two) years under Rajmahal Area.
Cleaning and maintenance of 11 nos. drilling machines deployed at Sonepur Bazari Project for period of 365 days.
Dismantling and lifting of damage of hanging 6 inch dia. MS pipe from shaft range to surface and stacking at No.- 2 Pit site, VK Unit of Khandra Colliery
Handling, Transport and Other Mining Services - Percentage quote based - Handling & Transport Service
Cutting of Roof Bolts and fabrication of bearing plates in Khas Kajora Colliery
NAIL, 3 IN, 3/8 IN, MS DOG
Antiwear Hydraulic Oil, Extra Heavy Duty Type (V3) Conforming to IS 11656 (Q2), Internal Combustion Engine Crankcase Oils for Automotive Application (V2) Conforming to IS 13656 (Q3)
Re plastering of 20Nos old isolation stopping at 5 and 6 pit of Madhaipur Colliery (Panel no-5pit SLW 6 Nos, 19-20 in between/ 28L-38L 8 Nos and 22-23 in between 48L-53L 6 Nos Total 20 Nos stopping), Pandaveswar Area
Procurement of spares for Flowmore Limited make M590 L
Repairing and construction of isolation stopping for Panel-C-5 ib R-IV seam of No. 5 pit at Manderboni Colliery unit of Manderboni South Samla Amalgamated Colliery under Pandabeswar Area
Construction of 06 (SIX) no. of Ventilation Stoppings at 5 no. pit (Laskarbandh unit) Madhaipur Colliery, Pandaveswar Area
New Insulating Oils (V2) Conforming to IS 335 (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
9.00 x 20 (16PR) LUG Type Tyre with Tube & Flap for use with LHD
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Coal Mines; Maintenance daily checking repairing replacement of bearing block conveyor pulley gear box motor roller bracket deck plate stringer leg supporting stringer w..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Coal Mines; AMC for running maintenance panel maintenance minor repair overhead line maintenance cable and other materials handling motor greasing of Electrical section ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Coal Mines; Operation running maintenance minor repair of reclaim water pump drinking water pump of Rajmahal CHP in all three shifts; Service Provider
Repairing of hoist chain assembly (01 set) and repairing of cracked house wall and roof of 7820 dragline.
Repairing of LHS Swing Mechanism Drive (35551101000) SMD42L Applicable for EKG10 cum Rope Shovel.
1.Repairing of levelling jack pads, stem wrench and dust collector of Torsa drill sl no.6011304. 2.Repairing of base tower raising cylinder,upper TR cylinder mounting, eyes and bush fitting of Barakar Drill sl no. 201310196.
Repairing of Boundary wall at Agent office under Bankola Colliery.
Overhauling, Repairing, Servicing of steam winding Engine with providing all types of materials fitting for safe operation (Man winding) at NKJ Unit, Pit no 01 of Khandra Colliery under Bankola Area
Repairing of Outer and inner Bush Seat of RHS final drive, RHS crawler frame and fitment of fabricated bush in EKG10 cum Rope shovel Sl No. 535.
Repairing and reconditioning of complete AC system in BD 355 Dozer P12028.
Housekeeping of 9 nos. Road weigh bridges and 2 no. Rail weighbridge at Sonepur Bazari Project for a period of one year (365 days)
Grading roof for water proofing treatment of incline 1 of Shyamsundarpur colliery.
Repairing and reconditioning of All Blade lifting cylinders, Tilt cylinder and Cylinder Stay in BD355 Dozer.
Deployment of JCB for segregation of stone at Chinakuri Central Siding.
Antiwear Hydraulic Oil, Extra Heavy Duty Type (V3) Conforming to IS 11656 (Q2), Internal Combustion Engine Crankcase Oils for Automotive Application (V2) Conforming to IS 13656 (Q3), Gear Lubricants, Multipurpose (?Extreme? Pressure?Gear?Oil?) (V3) Conforming to IS 1118 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Cleaning and removing of boiler ash at Mithani Colliery under BMP Group Sodepur Area.
Pump Spares
1.Repairing of 16 numbers of rollers assy. and 06 numbers of carrier rollers of BE 1000-1 Hydraulic Excavator. 2.Repairing of three numbers of H links for BE1000-1 Hydraulic Excavators.
Shifting of Load Centre with all SHCM package machineries in 41EL development district of RIV seam at Khottadih Colliery
Construction OF 1 no Isolation Stopping at 5L 4WD to 5WD against old damaged isolation stopping no 124 to avoid spontaneous heating inside stowed Panel D2 sealed on October 2022 in Chora R VI seam of Chora 7 and 9 Pits Colliery under Kenda Area ECL
Hiring of JCB for creating layer-wise coal stock at Patmohona Colliery for the year 2026-2027
Renovation of Project office under Sonepur Bazari Project
Hiring of JCB for 45 weeks for segregation of stone band from coal stock and to make the coal readily dispatchable at Methani depot
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - coal mines; Repairing and maintenance work of all 04 four Nos Hydraulic Shovels on regular basis at Rajmahal Project for the period of 180 one hundred eighty working day..
Repairing/ strengthening of structures of Spreader belt conveyor belt holding gallery and their support and repairing of walkway platform of spreader belt conveyor near dispatch siding at MIC unit of Jhanjra Project Colliery.
Replacement of 250KW, 6.6kV, HT motor of 20 no pump at RVI seam and replacement of damaged pipeline in main pump of R3/2 seam and shifting of 5 no pump at RV seam for monsoon purpose at Khottadih Colliery