Loading…
Loading…
3,423 results • Latest
Construction of 03 Nos Sectionalisation Stopping between sector A and Sector F of R VII seam at 3 and 4 unit under JPC
A) Repairing of Hydraulic Traction Motor (LH) 01 No, Gearbox-02 Nos and Drill Extension Cylinder1 No. of (B) Repairing of Hyd traction motor , Pump and Gear box of UDM 206 EE make at Bankola Colliery
Complete repairing and rewinding of 75KW 100HP Marathon Electric make 1480RPM 550Volt motor (B) Complete rewinding of ABC make 2.5 KV 110Volt Drill panel and (C) complete repairing and overhauling of ABC make 400Amps ACB switch and (A) Complete rep
Repairing of Hydraulic Traction Motor (LH)01 No. and Lift Cylinder - 01 No. of Eimco Elecon make SDL Mc. No. 1815,Hyd. Pump-01 No. and Hyd Fan Motor -01 No. of UDM Mc. No.209 at Bankola Colliery
Dismantling, Overhauling, Repairing, Fitting, and Commissioning of Cage Catcher Assembly of Head Gear Structure at Pit No 04 and 05 Chapui Khas Colliery under Satgram Sripur Area
Construction of 01 nos retaining wall at 10L in between 0D and minus 1D in R VI seam of MIC under JPC
Repairing of Hyd. Traction motor (LH)-01 NO.Service Control valve -01 no, hyd fan cooler motor -01 no. Drill Extension Cylinder -01 no, drill drive unit -01 no and drill feed motor -01 no of EIMCO ELECON make UDM mc no. 611-207 of millennium
Lowering and transportation of complete pump set along with lowering, laying and fitting of 6inch MS Pipe line from 24L/21D to 22L/1D of no. 7 Pit. Of Amkola unit under Nimcha (R) Colliery under Satgram-Sripur Area
Construction of Church along with development of campus at Dumaria rehab site under Rajmahal Area.
Repairing of 02 nos hoist cylinder assy and Rear Axle Mounting and Lateral Control Rod of CAT 773E Dumper 647.
Installation, commissioning of 5 nos Gang operating switch out of which 2 nos for 11KV Overhead line and 3 nos for 3.3KV Overhead line at different location of Bankola Colliery under Bankola Area
Repairing of Outer and inner Bush Seat of LHS final drive, LHS crawler frame and fitment of fabricated bush in EKG10 cum Rope shovel Sl No. 539.
Installation and commissioning of 3.3KV Overhead line Line s Gang operating switch and 3KV lighting arrestor at Sarpi sub-station and Majhi Para bore hole of Shyamsundarpur Colliery under Bankola Area
Extension of 3.3KV Overhead line 3 phase with continues running earthing feeding Power to Sarpi new Sub-station near new borehole of Shyamsundarpur Colliery under Bankola Area
Installation and Commissioning of Earthing Shielding system at ESP and CHP substation of Shyamsundarpur Colliery under Bankola Area
Installation and commissioning of High bay light for illumination of departmental workshop of Shyamsundarpur colliery under Bankola area.
Construction of 550Volt overhead line from existing 550Volt overhead line to the Swamp at Sarpi Unit near CM water reservoir under SSPur Colliery
Lowering, transporting and fitting of MS pipe 140mtr and 260 m HDPE pipe from -9L/19D to -3L/19D to -3L/15D to -5L/3D to 3D/-5L to -5L/9D to -7L/9D and -4L/9D as stowing pipeline at Satgram Incline colliery
Extension of 0L belt from 0L/1D to 0L/0R (200 mtr) in Dishergarh seam at Satgram Project under Satgram-Sripur Area
4inch MS Pipe line 240 meters from Ratibati pump station to Ratibati Bye Pass road under Satgram-Sripur Area
Laying and fitting of 6inch M.S pipe line for installing of pump Motor with foundation at 17-18L/1D of Rana Seam(R-V) at Bhanora West Block Colliery under Satgram-Sripur Area
Anti-corrosive Painting of Head Gear Structures of four Pits (Pit No. 3, 4, 7 and 8) of Nimcha (R) Colliery under Satgram-Sripur Area
Scrapping priming painting of head gear of pit no.03 at J.K.Nagar Colliery under Satgram-Sripur Area
Fitment of two nos. Driving Wheels (part no-3536.05.02.061) to Driving Shaft (part No- 3519.05.02.089) applicable for EKG 10 rope shovel.
Repairing of walkways and platform of Mast of 7820 Dragline
Erection of 11KV overhead line for power supply in Highwall project Trench C under Nimcha (R) Colliery under Satgram-Sripur Area
Repairing of Electric Winder Engine Gear Pinion of Pit No.4 of Chapui Khas Colliery under SSA
Supply and installation of ultimate Overwind protection for 04 and 05 No. Winder at Ningah Colliery under Satgram Sripur Area
Hiring of Consultants - Milestone/Deliverable Based - Auditor; Mines, Minerals and Metals; No; Onsite
Roof bolting and rope-stitching in R-VII seam for support of disturbed roof/side encountered during development of Porascole West Colliery
Repairing of both side front wheel hub, spindle and front suspension of CAT773E Dumper sl. no. PRB00928.
One-time track laying for development of new panels in R-VII seam of Porascole West Colliery
Supply, Installation, and Commissioning of 01 No. 60MT capacity pit-less type Electronic Road Weighbridge including Civil and Electrical work with 4 years CAMC after completion of one-year guarantee/warranty period at Sankalp Khani under Bankola Coll
Cleaning of spillage coal, slush and slurry in different conveyor area, control room and Silo at new CHP under S B Area
Miscellaneous repair and minor development works at V N Colony under S B Area
Maintenance and upkeeping work for Project office, Dispensary, Base workshop, Glass House Area, Andrewyul Sub Station, Dragline Section, Magzine House, Coal Testing Lab and DG Shed for a period of 6 months
Fixing of fencing around subsidence zone near 2 no colony at Porascole West Colliery under Kajora Area
Repairing and overhauling of (A) 550v, 30kw start delta starter and (B) 550V 65 KW DOL starter of Kumardihi A Colliery under Bankola Area
Re-organization of power set up, light fitting and wiring of Shankarpur Agent office at Shankarpur Colliery under Bankola Area.
SUPPLY. FITTING AND CONNECTION OF INVERTER AND BATTERY IN ALL FOUR UNITS AND COLLIERY WORKSHOP OF BANKOLA COLLIERY
Handling, Transport and Other Mining Services - Percentage quote based - Handling & Transport Service
Roof bolting complete (carrying, drilling and fixing) along 40-56L/4D and 40-56L/5D in RIX seam at Kalidaspur Project
Construction of 14 no of Sectionalisation Stoppings in narainkuri(RVII) Seam at Pure Searsole Colliery
Full plastering and hollering of 8 No. of water Dams and cleaning of fallen coal mixed with debris near Dams at 8 No. pit, Nega Seam under Nimcha(R) Colliery
Filling of illegal Mine Pits within mine leasehold of Mithapur (R) Colliery
Construction of 22 nos. of Sectionalisation Stoppings to Sectionalise the old developed BSP-13 Panel of Bogra (R-VI) Seam of J. K. Nagar Colliery
Construction of Ventilation stoppings for establishing Ventilation towards 0 dip-1ED, 1WD for smooth pumping operation and for upcoming West side development District in Satgram (R-V) seam at Chapui Khas Colliery
Drilling of Two (02) nos. of 250mm non-coring vertical Bore Hole near Pit No. 2 for water discharge of R-V (Satgram) Seam at J. K. Nagar (R) Colliery
Renovation and repairing work of 7 no Qtrs of Sri Krishna Mohan Jha (B/05/016), Suraj Kumar Sarkar(B/016/052), Raju Panak (NHS/07/032), Umesh Yadav(NHS/05/013), Anawar Sahazada (LCH/00/004), Sanjay Soren (NHS/18/115), Anjan Bouri (NHS/15/099) of SCW.
Construction of 24 nos. of 0.25m thick Ventilation Stoppings for the proposed panel BSP-13 at Bogra (R-VI) Seam of Pit No. 3, J. K. Nagar Colliery