Loading…
Loading…
3,423 results • Latest
Complete repairing/ rewinding of 290KW, 6.6KV Induction Motor SL No. 3F661042/2, Make Marathon of Sonepur Bazari Project under Sonepur Bazari Area.
Complete repairing/rewinding of 410KW, 6.6KV Induction Motor Sl. No. 3F660320/1 Make Marathon of Sonepur Bazari Project under Sonepur Bazari Area
Shifting of pipeline at Nirsa OCP under Lakhimata Group of mines.
Repairing of 03 unit NHS Qtr. No. 50/418, 09/049 and 11/065 under Hariajam Colliery, Mugma Area.
Topographical Survey and Map Preparation by Drone and DGPS at Jhanjra Project Colliery
PROPOSAL FOR 02 NOS HORIZONTAL BORE HOLE FROM 20L 23FX DIP IN RVI SEAM TO RIV SEAM AND 01 NO DOWN WARD VERTICAL BORE HOLE FROM RVI SEAM TO RV SEAM UNDER JPC
Construction of 440V overhead line from the existing source near colony to the pump house near sand bunker of Sarpi unit under Shyamsudarpur Colliery.
Construction of Hume Pipe culvert at Kataban under Chapapur Colliery.
Repairing of 02-unit NHS qtr. (14/85 and 21/137) and 01-unit B Eq. (008/008) including 01 nos. septic tank under Kumardhubi Colliery under Mugma Area. (2nd Retender).
Civil work for 04 nos first aid stations at 22D near pit bottom and 23B4EL and 46R minus 1L and plus 1L 2R at underground of MIC under JPC
Repairing of main drain at Kapasara OCP.
Construction of 02 nos. transformer shed at 10 no quarry under Chapapur Colliery.
Construction of 04 nos Retaining wall at different places shown in enclosed mine plan in R VI seam of MIC under JPC
(1) Installation commissioning and dismantling of 1000mm Conveyor belt setup for Panel No.B1 and B3 in RVIIA seam for SHCM package and Installation and Commissioning of 1200mm wide X 420M long and 1200mm wide x 385m long conveyor belt for Panel C
Construction of 15(fifteen) nos. Sectionalisation Isolation stoppings around the proposed stowing panel RVII S 10 in RVII seam of Sankalpa Khani Incline of Bankola Colliery.
Installation and commissioning of 3x2MVA 11kV/3.3kV Substation with Earthing and cable connections at Shyamsundarpur colliery under Bankola area
Installation and commissioning of 3.3kV substation at sarpi bore hole no.2 for operation of submersible pump at Shyamsundarpur colliery under Bankola area
complete replacement of wooden drum lagging in Pit no.3 winder at Shyamsundarpur colliery under Bankola area
Roof support by roof bolting along travelling roadway in RVII and RVIIA seam for working panel RVII 1A of RVII Seam at No. 8 Pit of Bankola Colliery.
Installation of 4 dia M.S Spray pipe range at proposed C.M Development panel 4 sub panel C2 and C3 for water spraying in RVII A Seam at S.S.Pur Colliery.
(A) Repairing of Hyd. Traction Motors (RH)01 No. of Eimco Elecon make SDL 1136, Gearbox Assy - 01 No. and Hyd. Pump-01 No. of EIMCO ELECON Make Low Hight UDM Mc. No. 48 of (B) Repairing of Hyd Traction Motors (LH)-01 No
Drivage of galleries through mixed strata (Dyke) for establishment of Haulage and Ventilation system for Panel 14 at RVII seam of No.2 incline of Bankola Colliery.
Repairing of Old Isolation Specialization stopping of RVIIIB1 Seam at Shyamsundarpur Colliery
Changing of Angle and Base plate (20 mm) with CPEM 021 welding at base location of column 1,2,3,4 of Pit no.1 and 1,2,3,4 of Pit no.2 at VK Unit, Khandra Colliery.
Installation, of 4 inch dia. M.S. Spray pipe range at proposed C.M Development Panel 2 sub panel T1, T2, B6 and B5, for water spraying, in RVIIA seam at SS Pur Colliery.
Repairing of 4th motion and 3rd motion pinion of 150kW font mounted gear box of 1200mm conveyor belt of Nakrakonda Kumardihi-B colliery under Bankola area.
Installation of 4 inch dia meter spray pipe range at proposed cm development panel 4 sub panel c1 for water spraying in RVIIA seam at Shaymsundarpur Colliery.
Repairing and line boring of CKC-150kW gear box with repairing of 3rd and 4th motion pinion of Shyamsundarpur Colliery under Bankola Area.
Installation of MBBR along with other units at Shyamsundarpur UG (Cluster 12 ) under Bankola Area.
one time endless and tugger haulage track line for stowing panel S8 Bottom (Sub Panel A and B) in RVIIIB seam of No.1 incline of Bankola Colliery.
Drilling of 02 nos incline upward boreholes at 2 no pit of Bankola Colliery.
Drilling holes in stone at floor of RVIIIT2 seam and lying of pipes for water circuit at S.S. Pur Colliery.
Erection of 04 Four nos. of Fly Ash Brick Ventilation Stopping in RVII Seam of Shyamsundarpur colliery.
Drain cutting and debris cleaning at no. 3 pt bottom along travelling roadway upto RVIIA seam drift mouth and in PL working district of RVIIB seam of no 3 and 4 pit unit of Kumardihi A Colliery
TRANSPORTATION OF NEW SIMPLEX ENGG and FOUNDARY WORKS PVT LTD MAKE UDM MACHINE BEARING NO- D138/5M Sr.NO-191 FROM SURFACE TO DISHERGARH SEAM 0Rise/6L VIA..., DISMANTLING, LOADING, LOWERING, TRANSPORTATION, REFITTING AND MARCHING AT SATGRAM PROJECT
Installation of Vishwa make Drive head of 800mm via dismantling, Loading, Transportation from 3L/1ED of koithee seam and different location along with its complete electrical accessories and reinstalling the same at 9L of 0R dist. of Disergarh Seam
Dismantling and uplifting of SDL M/C make BEML M/C no. BL-10C-10049 from underground at 7D/44L Bogra (R-VI) seam to surface at P S Colliery under Satgram-Sripur Area.
Transportation of A/Y make TSU 315 kVA 3.3 kV/550 V from Koithee 4D/1L to 0 rise along with all accessories at Satgram Project at Satgram Sripur Area
Dismantling, Arrangement, loading, unloading and transportation of brake post(with brake shoe)- 1 set, Motor-1 Nos, Spring Brake -06 and Gear Box -1 set from Bhalgora Colliery, AEBSC , Bastacola Area, BCCL to JK Nagar Project Colliery under SSA
Installation/replacement of two length guide rope- north east corner and south west corner (32mm x 185m ) of north and south side respectively at no 03 pit up to Satgram seam of Jemehari colliery under Satgram-Sripur Area.
Lowering, shifting and fitting of one HT pump (1000 GPM, 300 mtr head) of Ningah Colliery under SSA
Installation of fully Automatic fixed sprinkling Dust suppression with 70 KL water Reservoir and pump room at Naba-Kajora Railway Siding under Kajora Area
Installation and erection of 100W x 240 V outdoor LED luminaries at Bankola Colliery
Repairing jobs for vehicle number WMH 8066 (Tripping Truck).
Debris cleaning and drain cutting from 3 no pit bottom to 0D 5L Along 5L 0D to 1ND and Along 1ND 5Lto 9L in RVIIA searn of no 3 and 4 pit unit of Kumardihi A Colliery.
Supply sand cartridge at Mill. Incline for the financial year 2024 2025 in RVII A seam at Mill. Incline unit under Shankarpur Colliery.
Renovation of one no. existing 250mm dia 50mt depth vertical borehole with lifting of 150mm dia damage pipe and lowering new 150mm dia pipe at Sankalpa Khani Incline bunker no 6 of Bankola Colliery
Repairing, maintenance and overhauling of different make (Voltas, Logicool, Hitachi and Carrier) Air conditioners running at the Guest house Transit hostel Gulmohar club and different office rooms and Weigh Bridge under Bankola Area
Commissioning of LED boards at three different location of Nakrakonda Kumardihi B Colliery (retender).
Drilling of 3 nos. of NX Size Incline Upward Borehole from RVIIA to R VIl Seam for proving upper seam free from water at Shyamsundarpur Colliery.