Loading…
Loading…
3,424 results • Latest
Construction of 02 nos Retaining wall at 13X CUT in between 5D and 6D in RVI seam at MIC Unit under JPC
repairing of 400 amp 3.3 kv switch A/Y make of Kumardihi A Colliery under Bankola Area
Replacement of Track Switch Frame and Two Numbers of Track Switch along with Necessary Fittings at Sonachara Rail WB under KNT. Area.
Construction of 02 nos of 01m thick Bricks Stopping at LWP 13 of R VI seam at MIC Unit under JPC
Repairing of Boundary wall under Neamatpur Central Excavation Store.
Reorganization/diversion of HT lines with shifting of poles near porascole substation, Jambad more and near Padmavati mandir of Jambad OCP
Complete repairing and overhauling of (A) ABC make ACB of rating 400Amps. 550V and (B) Andrewyule make 550Volt of Rating 200Amps ACB switch of Kumardihi A Colliery under Bankola Area
Repairing and maintenance of a community centre near VT centre at Sheetalpur 4 no colliery under Sodepur group of sodepur Area.
Repairing and rewinding of 2 nos. of motor a) 93 kw 125 hp M and P make 1475 rpm,550v pump motor and B) 150 hp Kirloskar make 1470 rpm 550v pump motor of Kumardihi A Colliery under Bankola Area.
Annual Rep.,Maintenance of Railway Track at Bansra Railway Private siding for one year under Bansra Group of Mines, Kunstoria Area
Fitting of 04 nos submersible pump motor pipe complete set and shifting of Jambad OCP
Repairing of 2 unit B type quarter having no B/02/006 and B/02/004 near 7 no pit at Poidih under CKI-SDPR R group under Sodepur Area
Trimming of people trees, Repairing of Chairs, tables, rolling shutter gates and other miscellaneous work under Sodepur Central Store.
1. Construction of Lightning Shield for Protection of 09 Nos of Road Weighbridges and 01 Nos. Rail Weighbridge Under Knt. Area.
Complete repairing of Company Dumper no-WMH-3980 of Bankola Colliery
(A)Repairing of Dumper with number WB39-1625 under Kumardihi A Colliery under Bankola Area (B) repairing of Vehicle No WMH-8043 of Nakrakonda - Kumardihi B Colliery under Bankola Area.
Repairing of crane No.WB 38AH 5495 running at Bankola Area.
Complete repairing and overhauling of 400 Amps kilburn make 550V ACB switch gear and Repairing and overhauling of 200Amps, 550Volt Andrewyul make ACB Switch (SI.No. SNK P and M 16) at 3 and 4 pits of Shankarpur Colliery under Bankola Area.
Installation and commissioning of LED landscape lighting for Agent Office premises, Flag hoisting and employee memorial and tribute site of Shyamsundarpur colliery under Bankola area
Fitting of lighting arrestor in 11KV OH line at 6 pit and 9 pit, 3.3KV OH line at PD unit, Anjirbagan of Khas Kajora Colliery
Complete repairing/ rewinding of 3.3KV, 370KW 1485RPM sq cage motor of Jambad OCP
Miscellaneous pipeline repair, maintenance, submersible pump repair and maintenance and main pump installation and maintenance at Jambad OCP
Temporary arrangement for water supply from borehole near burning ghat to kora para, bathan para, school para and colony para of kantagoria gram ward no 08 located in the premises of NSOCP under KNT Area.
Repairing and fencing of guide rope plate form of head gear at pit no. 5,6,10 and 11 of Khas Kajora Colliery
Non destructive test of all vital components of winding engine (all components), brake assy and cage suspension gear at 14 nos UG pits under Kajora Area (02 times).
Strengthening of existing main garland drain flooring (Bed) in to RCC flooring to avoid seepage and protection of haul road a DMZ under ROCP.
Repairing of coal transporting road from Kanta More to Khatal More Bansra siding link road under Kunustoria Area
Fabrication of 4th delivery range for pump installation at coal face sump of Jambad OCP
Repairing of steam winder of no. 1 pit of Porascole West Colliery
Construction of 07 Nos. of Sectionalisation Stopping in R-IV Seam of No.6 Pit at Manderboni Colliery unit of MSSA Colliery under Pandaveswar Area
Replacement of keps assy at no. 6 pit of Porascole West Colliery
Repairing maintenance dismantling of OH line at submersible pump house of Porascole West Colliery
Miscellaneous jobs to be carried out in Central Kajora Colliery
Construction of 05 nos Sectionalisation stoppings at CM panel 11 of RV seam at MIC Unit under JPC
Painting of CHP at Narsamunda Colliery under DMC group, SDPA.
Supply and installation of 150watt flood light set at different location of Jambad OCP
Repairing of Main and other Pipe lines at various places near Pump house ,Bunglow para and 5 no colony, 4 no colony, etc. under Neamatpur Central Workshop.
Supply and fitting of bearing, bearing block, pulleys etc of Jambad Colliery
Construction of 06 Nos ventilation Stoppings of R VI seam at MIC Unit under JPC
Diversion of Pipe line for water supply from VT pump to Kalimati Reservoir of Chapapur-II Colliery under Mugma Area.
Multipurpose Industrial Grease (V2) Conforming to IS 7623 (Q3), Cardium Compound (Q3), Oil, Cylinder as per IS: 1589 (Q3), Gear Lubricants, Multipurpose (?Extreme? Pressure?Gear?Oil?) (V3) Conforming to IS 1118 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7074554 Dated : 08-01-2026 Bid Document 1/12, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Primary product category Gear Lubricants, Multipurpose (?Extreme?Pressure?Gear? Oil?) (V3) Conforming to IS 1118 Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 3487938.96 Payment Timelines Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank ICICI Schedule 1 EMD Amount (In INR) 28000 Schedule 2 EMD Amount (In INR) 3000 Schedule 3 EMD Amount (In INR) 8000 Schedule 4 EMD Amount (In INR) 31000 ePBG Detail Advisory Bank ICICI 2/12 (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 3 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Area Materials Manager, Kenda Area Office of the General Manager, Kenda Area, ECL (Sudipta Maity)
Life Jacket as per IS 6685 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7129968 Dated : 22-01-2026 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 222869.43 Payment Timelines Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Construction of Burning Ghat Shed at Hatinal Burning Ghat under Sodepur Area.
Developmental and Refurbishing works at Area Store Office under Kajora Area
Lifting and lowering of submersible pump, lowering and providing submersible pump, Starter, cable, pipe at different places of Chhota Bhorai (Five tola) and Bara Simra under Rajmahal Area.
Renovation and repairing work of 10 no Qtrs of Jayanta Mukherjee, Ramkumar Paswan, Community hall, Alapati Mukherjee, Surajkumar Nunia, Md Hadis Mia, Tarun Sharma, Dilip Sharma, Dipak Hari, Chandi Bouri of Neamatpur Central Workshop.
Combined comprehensive estimate for 11 major developmental activities at the Taljhari Rehabilitation Site (Dumaria) under Rajmahal Area, ECL.
Construction of entry gate along with store room at new Kali Mandir near Lohat under Dabor Colliery
Construction of 14 (fourteen) nos. Sectionalisation Isolation stoppings around the proposed stowing panel RVII S9 in RVII seam of Sankalpa Khani Incline of Bankola Colliery
(A) Different types of underground belt conveyor job(1000mm size wide belt) at 30L 1st belt (B) replacement of damaged 1000mm. Wide belt 200 mtr. Length at TB-1 and 182 mtr. Length at 32L b(C) (l)Replacement of 1000nm.Wide x 200 mtr, Long damaged P