Loading…
Loading…
15 results • Latest
One-time repairing/Overhauling and one year warranty of JOST make Jumbo Electric Truck, Qty: 02 Nos.
Overhauling work of 02 nos. VTA1710L Engine of Two (02) nos. 8-wheeler DETC type Tower Wagon for FY 2025-26 on Open Tender Basis for a duration of 01 Year at C&W, Kanchrapara Workshop, Eastern Railway under Shop-15of DY.CEE/W/KPA Organization
Rehabilitation of BT make tap changer of electric locomotives, Qty-30 nos.
Outcome and activity based outsourcing for day-to-day operation, maintenance and breakdown rectification of electrical power supply and various electrical assets / systems under Foreman Colony sub-station of Shop-35/KPA under the jurisdiction of Dy.CEE(G)/KPA.
Stripping of all cables of different sizes from incoming WAG7 & WAP4 conventional Locos for (POH+RC) at KPA Workshop and disposal of all stripped out cables from shop No- 11/KPA to Dy.CMM/HLR, Qty-38 Nos Loco for a period of three (03) years.
Outsourcing of work for Shot Blasting of 1422 nos. of Bogies for a total quantity of 711 nos. of Conv./3-Ph EMU, Conv./3-Ph MEMU, DEMU & Tower Car Motor Coaches to be undertaken on Turn-key basis by suitable outside agency through Open Tender for a period of 02 (Two) years
Work of Stripping and equipping of Main Transformer unit in total 231 nos. Conventional and 3 Phase EMU/MEMU Motor Coaches for FY. 2025-26 & 2026-27 under Dy.CEE (W)/KPA Organization, Kanchrapara Workshop, E. Rly. On Open Tender Basis for duration of 02 Years.
Outcome and activity based outsourcing for operation, maintenance & breakdown rectification of electrical and mechanical systems / assets at old filter house, new filter house and colony submersible pumps" of shop No.35/KPA under the jurisdiction of Dy.CEE(G)/KPA.
Certification of 5S Workplace Management System at Shop No- 9 9A, 10, 11, 11A & 14 in Kanchrapara Workshop/Eastern Railway over a period of three (03) years.
Work of Complete Overhauling, repair, painting and numbering of Transformer Oil Cooler Radiator in total 316 nos. Conventional EMU/MEMU Motor Coaches for FY. 2025-26 under Dy.CEE(W)/KPA Organization, Kanchrapara Workshop, E. Rly. on Open Tender Basis for duration of 01 Year
Rehabilitation of defective 1000 KVA and 1050 KVA capacity traction transformers, Qty-26 nos
Periodic Overhauling work of 16 nos. underslung mounted Traction Alternator of Eight (08) nos. 8-wheeler DETC type underslung twin drive Tower Wagon for FY 2025-26 On Open Tender Basis for a duration of 01 year at C&W complex, Kanchrapara Workshop, Eastern Railway under Shop-15 of DY.CEE/W/KPA Organization
Development of retro-fitment of FRP made crew friendly Driver's cabin for MEMU motor coaches, Qty-50 nos
Rehabilitation of 5400 KVA transformer (Cu coil) for WAP-4/WAG-7 locomotives, Quantity-13 nos
Development of retro-fitment of FRP made crew friendly Driver's cabin for EMU motor coaches, Qty-100 nos