Loading…
Loading…
2,198 results • Latest
Construction of Fencing (2100 rft) with Sq. PCC Fence Posts with every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at VWL PANJAH, Under CAPEX of Social Forestry Division, Rajouri 2026-27 of SF Range Lamberi
Construction of Fencing (3600 rft) with Sq. PCC Fence Posts with every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at VWL RAJPUR BHATTA, Under CAPEX of Social Forestry Division, Rajouri 2026-27 of SF Range Lamberi
Cost of procuring Walkie Talkie to various Section of Azhhutha Range during 2025-26
As per Nit BoQ
As per Nit BoQ
ESTIMATE FOR THE COST OF VISTA CLEARANCE FROM VAZHACHAL DORMITORY TO ORUKOMBAN IN CHARPA RANGE DURING 2026-27
ESTIMATE FOR THE COST OF VISTA CLEARANCE FROM ANAKUTHI TO CHENNAIPARA IN CHARPA RANGE DURING 2026-27
Planting of tall basketted and small basketted seedlings at Mentor Engg college in Eathappally Manathoor Pernumabur Range during 2026-27
Installation of Boundary Pillar (39 nos) that is Sangan (4 nos), Bohran (4 nos), Karroh (4 nos), Pragbar (5 nos), Bohra (9 nos), Bardui (11 nos) and Seri Kotla (2 nos) of Kathua Forest Range of Forest Division Kathua for the year 2026-27
Construction of Elephant Calf Cage attached to Veterinary Hospital at Abhayaranyam under NSC Kalady during 2026-27
As per Nit and Boq
As per Nit and Boq
As per Nit and Boq
As per Nit and Boq
As per Nit BoQ
As per Nit BoQ
As per Nit BoQ
As per Nit and Boq
As per Nit and Boq
As per Nit BoQ
As per Nit BoQ
Installation and commissioning of solar power fencing line (seven line) 1250m around Omba to Kattipallam at Karadukka section under Kasaragod Range during 2026-27
Installation and commissioning of solar power fencing line (seven line) 1600 m around Kunduchi to Beembumkal (Erinjipuzha) at Karadukka section under Kasaragod Range during 2026-27
Estimate for the cost of First Silviculture Thinning in 2014 TP Vattappara (10.72Ha) South Kumeramperoor Forest Station of Konni Range during 2026-2027
Construction of 06 boundary pillars at Burj Pathri Forest, Mahore Forest Division under UT Capex 2026 27 as per the approved design to be executed at different identified locations in accordance with the Tashree Burjiat.
Construction of 09 boundary pillars at Nil Lohar Si Dati Forest, Mahore Forest Division under UT Capex 2026 27 as per the approved design to be executed at different identified locations in accordance with the Tashree Burjiat.
Construction of 04 boundary pillars at Kalaban Forest, Mahore Forest Division under UT Capex 2026 27 as per the approved design to be executed at different identified locations in accordance with the Tashree Burjiat.
UPGRADATION OF VAN BHAVAN FOREST COMPLEX INCLUDING NEW APPROCH ROAD FROM FRONT SIDE TO VAN BHAVAN COMPLEX , DFO UFD JAMMU UNDER CAPEX FOR THE YEAR 2026-27
Establishment and maintenance of plantation including BUC, protection and all operations necessary in Co. 27/N simbal to achieve and maintain the prescribed survival standards up to 30th August of the Fourth Year under CAMPA in Nowshera Division
Maintenance and Painting of Postmortem room at Abhayaranyam in Research Range under NSC Kalady during 2026-27
Collection of seed of different and conifer spps. in Jammu from the Seed Production Areas (SPA) established by Seed Division Jammu
Maintenance work of Edappalayam IB in Thekkady Range during 2026-27
Desilting Kumarikulam waterhole of Thannikkudy section in Periyar Range During 2026-27
Desilting Mavady waterhole of Mavady section in Periyar Range During 2026-27
Desilting paliyanpara waterhole of Eravingalar section in Periyar Range During 2026-27
Desilting Pulikkayam waterholes of Mlappara section in Periyar Range During 2026-27
Desilting various waterholes of Manalar section in Periyar Range During 2026-27
Cost of improvement of road and retaining wall in Bachelors quarters sevenmala in Munnar range during the year 2016-17
Renovation of Mahout Quarters at Abhayaranyam in Research Range, Kodanad under NSC Kalady durin 2026-27
EXTENSION AND RENOVATION OF OTTIPARA APC UNDER OTTIPPARA SECTION IN SULTHAN BATHERY RANGE
IMPROVEMENT OF RANGE OFFICER QUARTERS BUILDING AT MUTHANGA RANGE
IMPROVEMENT OF HANGING FENCE CONSTRUCTED UNDER RKVY SCHEME FROM NAIKETTY- KAPPISTORE- 7ACREKUNNU PUTHUVEEDU UNDER NAIKETTY FOREST STATION IN SULTHAN BATHERY RANGE
RENOVATION OF QUARTERS IX-101 AT MUTHANGA IN MUTHANGA RANGE
Up gradation of Forest Rest House at Teetwal Karnah
Up gradation of BO hut at Laqut Bangus Ramhal Range
boq
Up gradation of Chokidar Hut at Dedikoot Naihari Range
boq
bo