Loading…
Loading…
2,198 results • Latest
Clearing and maintanance of Central Nursery, Kulathupuzha compound during 2026-27
Cost of vista clearing works from Vattavila to 10th block around the Pankave settlement in ABP Range Kottoor
Cost of vista clearing works from 10th block to mancode Podiyanimoodu to kanjimooduthara in ABP Range Kottoor
Cost of vista clearing works from Peppara to podiyam Podiyam to pothode in Peppara
Cost of vista clearing works from Nellikkapara to podiyakkala Chathancode to vayuvanthole in Peppara
Construction of 123 no. Chak Line of demarcation boundary pillars,in Co. No. 29/K, 37/K, 40/K, 39/K Agar Forest, Kalidhar Forest Range, Jammu Forest Division under CAPEX- 2026-27.
Working down of Trees posing threats to the life and properties to the inmates of Thamaravellachal Tribal Unnathi under Pattikkad Range in Thrissur Division during 2026-27
Cost of vista clearing works from Valavetty to Amala Plath in Neyyar
Construction of culvert at Thadippalam in Vallakkadavu Range during 2026-27
Maintenance of Plants in Division HQR Nursery of Special Forest Division Tangmarg under Scheme CAMPA (NPV) for the year 2026-27.
Maintenance of Plants in Ziren Nursery of Special Forest Division Tangmarg under Scheme CAMPA (NPV) for the year 2026-27.
Reconstruction of Wooden Foot Bridge across Changda Nallah near Ghar Katyas at Ward No. 6, Panchayat Dudu, Block Latti Marothi under District CAPEX 2026-27
Re Tender for the cost of creation of fire breaks in Pachakkanam FS of Pampa range during 2024-25
Cost of control burning works at Mukkuzhy FS in Pampa Range during 2024-25
Cost of maintenance of Trek Path in Sannidhanam Station of Pampa Range during 2024-25
Repair and renovation of changing rooms (two nos. male and female) under head Up-gradation and maintenance of Sulla Park in Reasi Forest Division of UT CAPEX FY 2026-27
Repair, Maintenance and up-gradation of Forest Complex Doda including staff quarter, inspection hut, provision for water Bore in Forest Complex etc. Under UT-CAPEX
Re Tender for the cost of maintenance of trek path under Mukkuzhy APC area in Mukkzuhy FS under Pampa range during 2024-25
Cost of control burning works at Pachakkanam FS in Pampa Range during 2024-25
Cost of vista clearing works from Kaviyar to attayar Karamanyar to Nadukani in Peppara
Estimate for the cost of planting 410 seedlings as compensatory afforestation (Vazhakkode-Plazhyi road development, Rebuild Kerala Initiative) in Karimbanakkadu area in Kathikudam, Kadukutty Village under Chalakkudy Range during 2026-27
Estimate for the cost of establishing institutional planting at Sri Siva Durga Devi Temple compound Edakalathur under Thrissur Range during 2026-27
Planting of Polybag saplings (BUC) of Jasrota and Kathua Forest Range of Kathua Forest Division under CAMPA Addl.CA in various compartments
Cost of vista clearing works from Thumbitheri to Mukkothivayal to Pattampara Alikave to erumbiyadu in Peppara
2nd Standard Nursery Maintenance operations viz Hoeing weeding watering application of fertilizers manures pestcides etc including recouping of mortalities failures at CHOWGAMNURSERY 1ST YEAR PLANTS
2nd Standard Nursery Maintenance operations viz Hoeing weeding watering application of fertilizers manures pestcides etc including recouping of mortalities failures at CHOWGAM NURSERY 2ND YEAR PLANTS
Providing and Fixing of 06 Strands of Black Annealed Barbed Wire with Angle Iron Fence Posts AND PLANTATION WORKS AT VWL PADGAMPORA
Construction and Installation of in-situ Boundary Pillars at Dodiniyal Forest keran Range Kehmil Forest Division
Cost of vista clearing works from Utharamkayam to Ayiramrkal in Neyyar
Eco-Restoration work -Planting and Ist year maintenance at 2000 TP Koyikkkavu
Cost of vista clearing works from Bonaccord picket station to chemmankala Lathimotta to bonafalls Podiyakkala to Mandapam in Peppara
Second Year Mtce of 2025 Eco-restoration Plantation Poovalikkuzhy (2015 Acaic auriculiformis Plantation), Punnala Forest Station, Pathanapuram Range
As per Nit and Boq
As per Nit BoQ
Second Year Mtce of 2025 Ecorestoration Plantation, Chellamkode (2012 Acacia mangium Plantation) Ambanar Forest Station of Pathanapuram Range
Cost of vista clearing works from Dheivamukku to anakayathumoola 10th block to kallottupara in ABP Range Kottoor
Construction of Fencing (2300 rft) with Sq. PCC Fence Posts with every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at VWL Dodasan Lower, Under CAPEX of Social Forestry Division, Rajouri 2026-27 of SF Range Rajouri
Construction of Fencing (4000 rft) with Sq. PCC Fence Posts with every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at VWL KHANKARI TUNDITRAR, Under CAPEX of Social Forestry Division, Rajouri 2026-27 of SF Range Rajouri
Construction of Fencing (2000 rft) with Sq. PCC Fence Posts with every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at VWL DARHAL MADHOON, Under CAPEX of Social Forestry Division, Rajouri 2026-27 of SF Range Rajouri
Construction of Fencing (2300 rft) with Sq. PCC Fence Posts with every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at VWL DODASAN UPPER, Under CAPEX of Social Forestry Division, Rajouri 2026-27 of SF Range Rajouri
Construction of Fencing (2600 rft) with Sq. PCC Fence Posts with every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at VWL BINDI, Under CAPEX of Social Forestry Division, Rajouri 2026-27 of SF Range Rajouri
Construction of Fencing (3500 rft) with Sq. PCC Fence Posts with every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at VWL TARALA BUDHAL, Under CAPEX of Social Forestry Division, Rajouri 2026-27 of SF Range Rajouri
Construction of Fencing (1100 rft) with Sq. PCC Fence Posts with every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at STRIP BREVI KURAL Under CAPEX of Social Forestry Division, Rajouri 2026-27 of SF Range Lamberi
Construction of Fencing (1550 rft) with Sq. PCC Fence Posts with every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at STRIP RAJPUR BHATTA Under CAPEX of Social Forestry Division, Rajouri 2026-27 of SF Range Lamberi
Construction of Fencing (2000 rft) with Sq. PCC Fence Posts with every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at STRIP KALSIAN Under CAPEX of Social Forestry Division, Rajouri 2026-27 of SF Range Lamberi
Construction of Fencing (2000 rft) with Sq. PCC Fence Posts with every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at STRIP JABA ON MAIN ROAD ), Under CAPEX of Social Forestry Division, Rajouri 2026-27 of SF Range Lamberi
Construction of Fencing (2000 rft) with Sq. PCC Fence Posts with every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at VWL KURLIAN (KURAL), Under CAPEX of Social Forestry Division, Rajouri 2026-27 of SF Range Lamberi
Construction of Fencing (1600 rft) with Sq. PCC Fence Posts with every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at STRIP SAROOLA, Under CAPEX of Social Forestry Division, Rajouri 2026-27 of SF Range Rajouri
Construction of Fencing (1600 rft) with Sq. PCC Fence Posts with every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at STRIP NAILI NAYIKA PANJGRIAN, Under CAPEX of Social Forestry Division, Rajouri 2026-27 of SF Range Rajouri
Construction of Fencing (2200 rft) with Sq. PCC Fence Posts with every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at VWL KHARAK / PANJAH, Under CAPEX of Social Forestry Division, Rajouri 2026-27 of SF Range Lamberi