Loading…
Loading…
2,210 results • Latest
Estimate for the cost of Renovation of Section Office Building Kalamkunnu in Anchal Range during 2026-27- General Civil Work
The proposed project involves Roofing maintenance, Painting, Flooring, False ceiling, Electrification and Plumbing works and other repairing works etc of Maniyarankudy campshed
Cost of 2nd year maintenance of 2025 Teak Plantation Chokkana (Effective area-9.5 Ha) under Mupliyam Forest Station in Vellikulangara Range during 2026-27
Cost of Ecorestoration and 1st year maintenance of 2026 Bit I Eucalyptus plantation Piravanthoor in Amabanr Forest Station of Pathanapuram Range during 2026-27
Manpower Outsourcing Services - Fixed Remuneration - Others; Mazdoor/Labour; Not Required
Installation of Boundary Pillar at Bani Changi of Jasrota Forest Range of Forest Division Kathua for the year 2026-27 STATE CAPEX.
Stage Contract for Works of Emergent nature by way of Plugging of breaches, Dyke management, clearance of feeding channels etc.
Stage Contract for De-weeding and clearance of unwanted vegetation inside Wular Lake
Upgradation of Inspection Hut at Forest Complex Kathua Forest Division under Capex for the Year 2026-27
Repair and Renovation of APCP at Lakhanpur Forest Range Kathua Forest Division under Capex for the Year 2026-27.
Procuring Petrol operated water Pump and accessories for the use of Ummikkuppan section in Periyar range during 2026-27
Procuring Petrol operated water Pump and accessories for the use of Randattinkara section in Periyar range during 2026-27
Procuring Petrol operated water Pump and accessories for the use of Eravingalar section in Periyar range during 2026-27
Up gradation of DF Office and DFO Residence Kathua Forest Division under Capex for the Year 2026-27.
Special Maintenance of 2022 Vadamuri TP at Athirappilly Forest station in Athirappilly Range during 2026-27
shifting and improvement works of extisting ecoshop in CNC range during 2025-26-General Civil Work
Cost of Eco restoration Planting of 2026 Kannattupadam Eco Restoration Plantation Effective Area 14.80 Ha under Mupliyam Forest Station in Vellikulangara Range of Chalakudy Division during 2026-27
Improvement work of Roof Truss work at Kulappully section under Ottapalam Range during 2026-27
Procurement of Point To Point Devices for use at various Locations, Integrated with the RTM Networking Facility under Research Range during 2026-27(Including GST)
Interactive Panels with CPU (Q2) ( PAC Only ) (3 (3 ))
Establishment and maintenance of plantation through planting 12000 Nos of departmental saplings, including casualty replacement (beating-up) in 49b/Th Pagore CAMPA NPV FY 2026-27 in Thakrakote Reasi Forest Division
Establishment and maintenance of plantation through planting 10000 Nos protection and all operations necessary to achieve and maintain the prescribedin 28/R Salal under CAMPA NPV 2026-27 in Reasi Range of Reasi Forest Division
Establishment and maintenance of plantation through planting 12000 Nos of departmental saplings, including casualty replacement 09/Th 10/Th Panssa under CAMPA NPV 2026-27 in Thakrakote Range of Reasi Forest Division
Establishment and maintenance of plantation through planting 11000 Nos of departmental saplings, including casualty replacement (beating-up), in 33u/K under CAMPA NPV 2026-27 in Katra Range of Reasi Forest Division
Establishment and maintenance of plantation through planting 13000 Nos of departmental saplings, including casualty replacement (beating-up), in 38/R Paryse CAMPA NPV 2026-27 in Reasi Range of Reasi Forest Division
Planting (BUC) of 7575 Nos. saplings (polybags), in pits of size 45cmx45cmx45cm within the available blanks of identified sites at 07 Nos. of different locations already established during 2023-24, 2024-25 and 2025-26 of Reasi Range Under CAMPA
Planting (BUC) of 2870 Nos. saplings (polybags), in pits of size 45cmx45cmx45cm within the available blanks of identified sites at 04 Nos. of different locations/closures already established during 2023-24, 2024-25 of Soil Range Reasi Under CAMPA
Planting (BUC) of 3115 Nos. saplings (polybags), in pits of size 45cmx45cmx45cm within the available blanks of identified sites at 06 Nos. of different locations already established during 2023-24 and 2024-25 of Katra Range Under CAMPA NPV 2026-27
Maintenance work at Methakanam Campshedin Thekkady Range during 2026-27
Planting (BUC) of 7975 Nos. saplings (polybags), in pits of size 45cmx45cmx45cm within the available blanks of identified sites at 18 Nos. of different locations already established during 2023-24 and 2024-25 of Thakrakote Range Under CAMPA
Second Year mtce of 2025 Ecorestoration Plantation Maravanchira, (2014 Acacia mangium) Ezhamkulam Forest Station, Anchal Range
Estimate for the cost of eco-restoration (Planting) of the land resumed from HL at Kottappara Reserve Kodanad Range Bit 1
Estimate for the cost of eco-restoration (Planting) of the land resumed from HNL at Kottappara Reserve Kodanad Range Bit 2
Estimate for the cost of eco-restoration (Planting) of the land resumed from HNL at Kottappara Reserve Kodanad Range Bit 3
Second Year mtce of 2025 Ecorestoration Plantation Kampakapana, (2014 Acacia mangium) Ezhamkulam Forest Station, Anchal Range
Maintenance Operations of Conifer Polypots in Chittarnar Nursery in Khuihama Range
Construction of 04 Nos. of BPs in Nari Forest under UT CAPEX for the year 2026-27
Facility Management Services - LumpSum Based - Bor Tiger Reserve Wardha; Design installation fabrication of Gate and beautification of Adegaon Campus at Bor of Adegaon Gate Nagpur Part II; Consumables to be provided by service provider (inclusive in..
Facility Management Services - LumpSum Based - Bor Tiger Reserve Wardha; Design installation fabrication of Gate and beautification of Adegaon Campus at Bor of Adegaon Gate Nagpur; Consumables to be provided by service provider (inclusive in contract..
Maintenance of Trek path from mannenna to Devarmala (Reach-2)(5 Km x1.50m Width) in Mangala Section of Kanayar Range during 2026-27
Maintenance of Trek path from mannenna to Devermala (Reach-1) (5.00 KM x 1.50 m Width) in Mangala Section of Kanayar Range during 2026-27
Vistaline Clearance on either side of the Trekpath from Thannikkudy SHQ to Mlappara at Thannikudy section in Periyar Range During 2026-27
Estimate for the cost of providing cement concrete Road at Kannimara teak Surroundings under Sungam Range During 2025-26
ESTIMATE FOR THE COS TOF MAINTENANCE OF DRIVERS QUARTERS AT ANAPPADY UNDER SUNGAM RANGE DURING 2026-27
Vista clearance undergrowth in jungle in various highly sensitive Elephant prone areas of Thiruvizhamkunnu FS under Mannarkkad Range
As per Pdf
As per BOQ
Construction of Forest Rest House at Gandhtop under CAPEX 2026-27
Const. of Pre fabricated Insulated Str. for winter near FRH Basantgarh under District CAPEX 2026-27
Maintenance of Plants in Division HQR Nursery of Special Forest Division Tangmarg under Scheme CAMPA (NPV) for the year 2026-27.