Loading…
Loading…
2,221 results • Latest
KIIFB Projects - Construction of Satellite Rehabilitation Centre at Kaprikkad, Nature Study Centre, Kalady Division, Social Forestry, Central Region, Ernakulam - General Civil Works
KIIFB PROJECTS - CONSTRUCTION OF SATELLITE REHABILITATION CENTRE AT DHONI, PALAKKAD FOREST DIVISION, EASTERN CIRCLE, PALAKKAD - GENERAL CIVIL WORKS
For Collection, Removal and Industrial Utilization of Chir Pine (Pinus roxburghii) Needles from Designated Forest Areas of Jammu Province
2nd Year maitanance of 2025TP Mayiladumparatha in Thiruvazhiyadu section of Nelliyampathy Range During 2026 27
Cost of Construction of retaining wall at Ezhukumon Kulangarapdy road in Pampa Range during 2025-26.
Providing portable toilet for various APCs in Pampa Range during 2025-26.
Providing uniform for protection watchers in Azhutha and Pampa Range under Periyar West Division during 2025-26.
Marking 1962 TP Elival for final felling in Elival forest section under Olavakkod range during 2026-27
As per the specifications of NIT and BoQ.
Scanned legible copies of documents as per NIT conditions
As per the specifications of NIT and BoQ
BOQ
Repair and Renovation of Office and Residence of Range Officer Reasi Reasi range in Reasi Forest Division under UT Capex FY 2026-27
Up-gradation of Range Office and residence of Thakrakote Range and Repair and Renovation Of Boundary Walls of Range Office Thakrakote HQ Pouni in Reasi Forest Division under UT Capex FY 2026-27
Construction of 145 Boundary Pillars at Julla forest in Katra Range of demarcation as per approved design at different locations as per tashree burjiat (description of boundary pillar) of Reasi Forest Division under UT Capex 2026-27
Installation of 44 Nos of BPs in Sangna Forest of Thakrai Range under UT Capex for the year 2026-27
As per the specifications of NIT and BoQ
Cost of Creation of Fire Breaks in Pachakkanam FS in Pampa Range during 2025-26.
Cost of Control burning works in Mukkuzhy FS in Pampa Range during 2025-26.
Cost of creation of Fire Breaks in Mukkuzhy FS in Pampa Range during 2025-26.
Creation of Fire Breaks in Sannidhanam FS in Pampa Range during 2025-26.
Creation of Fire Breaks at 4th Mile area of Sannidhanam FS in Pampa Range 2025-26.
Procuring portable generator for Puthussery APC and Ponnamabalamedu watch tower in Pampa Range during 2025-26
Construction 295 no. of demarcation boundary pillars in Co. No. 3/T,4/T,5/T Tarah Forest, Jindrah Forest Range, Jammu Forest Division under CAPEX- 2026-27.
As per the specifications of NIT and BoQ
As per the specifications of NIT and BoQ
As per the specifications of NIT and BoQ
As per the specifications of NIT and BoQ.
As per BOQ
As per BOQ
As per BOQ
Survey Demarcation and Marking to facilitate final felling in 1966 Teak- Plantation Chaliyakkara (Effective area 10 HA) in Edamon Section of Thenmala Range during 2026-27
Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Admin
Supply of refreshment items as and when required for organization of Survey, MAC Camps, Trainings, Awareness programmes, Debates, Symposiums, Shri Amaranth Ji Yatra 2026 and all other official functions in the division including its Ranges and Blocks
As per the specifications of NIT and BoQ.
As per the specifications of NIT and BoQ.
As per Pdf
As per Pdf
As per BOQ
As per BOQ
cost of Eco Restoration zone(Planting Mtce) of 2014 Acacia Auriculiformis clear felled Plantation, Punnamanvayal (11.92 Ha) at Chittar North Section in Kulathupuzha Range during 2026-27.
Second year Ecorestoration of 2011 Acacia Auriculiformis plantation, Pethala bit 2 (16.88Ha) in Peringamala section of Palode range 2026-27
Cost of Second Year Maintenance for the Eco-Restoration of 2012 Acacia auriculiformis Plantation, Kochalummoodu, Bit-2 (17.00 Ha) in Bharathannoor Section of Palode Range During 2026-27
As per BOQ
Cost of Second Year Maintenance for the Eco-Restoration of 2012 Acacia auriculiformis Plantation, Chempancode, Bit-2 (25.5 Ha) in Bharathannoor Section of Palode Range During 2026-27
Creation of Ecorestoration Zone in 2014 Acacia Auriculiformis Plantation,Elavupalam(10.82Ha)at Chittar South section of Kulathupuzha range 2026 27
Creation of Ecorestoration Zone in 2010 Medicinal Species Plantation,Thoongampara (11Ha)at Chooliyamala section of Paruthippally range 2026-27
Second year Ecorestoration of 2012 Acacia Auriculiformis plantation Peringamala (16Ha) in Peringamala section of Palode range 2026-27