Loading…
Loading…
2,225 results • Latest
Renovation and Improvement of Van Sadan Forest Complex Talab Tillo, Urban Forestry Division.
Construction of Trek Route from Surjandhar to Pangan Devta Length 3.50 KM 12a/R of Reasi Range in Reasi Forest Division under UT Capex FY 2026-27
Construction of trek Route from Ration Depot Surjandhar Bus Stand to Kali mata Length 2.00 KM Reasi range in Reasi Forest Division under UT Capex FY 2026-27
Repair and Renovation of Tote Rest House at Tote Reasi range in Reasi Forest Division under UT Capex FY 2026-27
Improvement work of open well circular concrete ring work in front of new CCF office building compound under Olavakkode Range during 2026-27
Up gradation of Crocodile and Gharial enclosure at Jambu Zoo
Outsourcing of Kiosks (02 Nos.) at Jambu Zoo.
Stage Contract-Temporary restoration at Jambu Zoo by way of slip clearance and other allied works
Estimate for the construction of a retaining wall and allied works at Kadakkamon Nagar Vatika under Punnala Station Pathanapuram Range for the financial year 2025 26 General Civil Work
Installation of 907 Nos. BPs of Treru Forest under UT CAPEX 2026-27 Lamberi Forest Range of Nowshera Forest Division
Construction of 239 Nos. of BPs in Lal Draman Forest under UT CAPEX for the year 2026-27
BOQ
Construction of Eco Tourism Infrastructure at Hirpora WLS
Installation of 54 No. BPs of Nali Forest under UT CAPEX 2026-27 Lamberi Forest Range of Nowshera Forest Division
Installation of 71 No. BPs of Theru Forest under UT CAPEX 2026-27 Lamberi Forest Range of Nowshera Forest Division
Installation of 57 No. BPs of Methyani Forest under UT CAPEX 2026-27 Lamberi Forest Range of Nowshera Forest Division
Installation of 45 No. BPs of Changerigala Forest under UT CAPEX 2026-27 Lamberi Forest Range of Nowshera Forest Division
Standard Nursery Maintenance Operations for Saplings in Polybags and Naked Root Saplings in Nurseries of Lidder Forest Division Bijbehara Viz Central Nursery Bijbehara Seer Nursery BataKote Nursery Yanner Nursery and Katriteng Nursery
Construction of 191 boundary pillars at Bharnelli Forest, Mahore Forest Division under UT Capex 2026 27 as per the approved design to be executed at different identified locations in accordance with the Tashree Burjiat.
Construction of 17 boundary pillars at Sakrala Forest, Mahore Forest Division under UT Capex 2026 27 as per the approved design to be executed at different identified locations in accordance with the Tashree Burjiat.
Construction of 189 boundary pillars at Chiebella Forest, Mahore Forest Division under UT Capex 2026 27 as per the approved design to be executed at different identified locations in accordance with the Tashree Burjiat.
Standard nursery maintenance operations and Raising of Naked root Plants at Central Nursery Nagbal Shopian, Forest Division Shopian under the Scheme CAMPA for the year 2026-27
Construction of 533 boundary pillars at Dugga Dhansal Forest, Mahore Forest Division under UT Capex 2026 27 as per the approved design to be executed at different identified locations in accordance with the Tashree Burjiat.
Construction of 181 boundary pillars at Angralla Tuksan Forest, Mahore Forest Division under UT Capex 2026 27 as per the approved design to be executed at different identified locations in accordance with the Tashree Burjiat.
Cost of Raising and 1st year maintananceof 2026TP Mayiladaumparatha of Thiruvazhiyadu section Nelliyampathy Range during 2026-27
The proposed project involves Plastering, Painting, Flooring, False ceiling, Electrification and Plumbing works and other finishing works etc of Pampanthotty Campshed under Thodupuzha Range
The proposed project involves Replacement of Damaged Roofing and Setting Up of Tool Room at Thattekkad Section Office Building
The proposed project involves construction of handrail at Divisional Forest Office Compound in Kothamangalam Division
As per the specifications of NIT and BoQ.
As per the specifications of NIT and BoQ.
GENERAL-Quarters No XII/605 roofing work-Estimate for the cost of roofing work for preventing leakage from roof at quarters no XII/605 in Devikulam Range during 2025-26
GENERAL-Quarters No XII/602 roofing work- Estimate for the cost of roofing work for preventing leakage from roof and construction of car porch at quarters no XII/602 in Devikulam Range during 2025-26
Formation of Vidyavanam at Vivekananda HS, Changankulangara under Social Forestry Range, Kollam in SF Division, Kollam
Formation of Vidyavanam at Govt. Boys HS, Thevally under Social Forestry Range, Kollam in SF Division, Kollam
Construction of 44 boundary pillars at Kundi Dhar Forest, Mahore Forest Division under UT Capex 2026 27 as per the approved design to be executed at different identified locations in accordance with the Tashree Burjiat.
Second year maintenance of 2025 Eco restoration Zone, Neduvannoorkadavu ( Effective area -20 Ha) ( 2014 Eucalyptus clear felled area - 20.60 Ha) at Kalluvarambu Section of Thenmala Range during 2026-27
Construction of 166 boundary pillars at Bagan Sarssote Forest, Mahore Forest Division under UT Capex 2026 27 as per the approved design to be executed at different identified locations in accordance with the Tashree Burjiat.
Second year maintenance of 2025 Ecorestoration Zone Kattilappara (Effective area-42 Ha) ( 2013 Acacia auriculiformis clear felled area -44 Ha) at Kalluvarambu Section of Thenmala Range during 2026-27
Raising 50,000 nos basketed seedlings nursery at Oachira block for public distribution in Kollam Social Forestry Range under Social Forestry Division, Kollam during 2024-25
Second year maintenance of 2025 Eco restoration Zone, Eettakkanam (Effective area-17 Ha) ( 2013 Acacia auriculiformis clear felled area- 17.6 Ha) at Kalluvarambu Section of Thenmala Range during 2026-27
Raising 15,000 nos Coir Root Trainer seedlings for public distribution DFEIC, Kottarakkara of Punalur Social Forestry Range under Social Forestry Division, Kollam during 2023-24 and 2024-25
Raising 10,000 nos basketed seedlings for public distribution DFEIC, Kottarakkara of Punalur Social Forestry Range under Social Forestry Division, Kollam during 2023-24 and 2024-25
Raising 10,000 nos Coir Root Trainer seedlings for public distribution in Anchalummoodu block of Kollam Social Forestry Range under Social Forestry Division, Kollam during 2023-24 and 2024-25
Cost of Vista clearance works under various places of Tholpetty Range in Wayanad Wildlife Division during 2024-25
Raising 15,000 nos basketed seedlings for public distribution in Anchalummoodu block of Kollam Social Forestry Range under Social Forestry Division, Kollam during 2023-24 and 2024-25
Fire Protection works at Elleckal- Chirananada (both side of the Road Interstate Boundary) Valluvady - Kallumukku (20 km) under Naiketty Forest Station under Sulthan Bathery Range in Wayanad Wildlife Division during 2024-25
Laying Of Crate Near Jalal Din House
Installation of BPS in Barmeen and Chillar Block of North Range
please refer BOQ
please BOQ