Loading…
Loading…
8,170 results • Latest
Annual maintenance of sewerage scheme in Sector- 110A, Gurugram. Repairing of manhole with brick work, plaster slab etc. and all other works contingent thereto
Felling of Trees from Forest and Non-Forest areas District Sonipat
Felling of Trees from Forest and Non-Forest areas District Rohtak
Felling of Trees from Forest and Non-Forest areas with extraction of Stumps, Conversion, Measurement, Recording, Loading, Carriage, Unloading Stacking (Making Lots) In Sale Depots and all related works as mentioned in S.O.R. with additional require
Felling of Trees from Forest and Non-Forest areas District Rohtak
Felling of Trees from Forest and Non-Forest areas District Rohtak
Construction of Anti-flood wall and water collection tanks to tackle water logging at 33 kv s/stn. Bupania(Bahadurgarh)
Extension of Switch House Building at 33 kv s/stn Sector 13-17part -1 Panipat (size-23x30 ft)
Felling of Trees from Forest and Non-Forest areas District Rohtak
Old fallen boundary wall and other civil work at Sdo Office building Bhallout Rohtak
Construction of brick wall and installation of MS angles on compound boundary wall in the Officer Residences at UHBVN Jhajjar.
Annual maintenance estimate of master road in urban estate Dharuhera for the year 2025 to 2026
Short Term e-tender is invited for appointment of contractors for purchase of 28 Nos. Cattle Crushes under two cover
Annual Maintenance of Road, Water Supply, Sewerage and SWD Scheme in Sector 18 Rewari 2026-27
Supplying and Spreading Of Gravel In One Nos. Yard and In C.Bank and Brick Wall Edging At 33 Kv S/Stn. Naraina Samalkha Panipat
Annual Maintenance of Water supply and Sewerage Scheme in Sector-4 Rewari 2026-27
Annual Maintenance Estimate of Hort. works in sector-7, Jind for the year 2025-2026.
Annual maintenance estimate of Water Supply Sewerage and SWD Scheme in Sector -8 Rewari for the year 2025 2026
ANNUAL MAINTENANCE ESTIMATE OF HORTICUTLURE WORKS IN SECTOR-9 AT JIND FOR THE YEAR 2026-2027.
ANNUAL MAINTENANCE ESTIMATE OF HORTICULTURE WORKS IN SECTOR-8 AT JIND FOR THE YEAR 2026-2027.
DETAILED ESTIMATE FOR ROUGH COST ESTIMATE FOR FURTHER DEVELOPMENT OF LS WORKS IN PHASE II IN SECTOR 33 P I, HISAR Work Code HSV 2023 24 88829
Annual maintenance estimate of Roads, Water Supply, Seweraage and Storm water drainage Scheme in Sector-19, Rewari for the year 2026-2027
CONSTRUCTION OF STAFF ROOM ACTIVITY ,VERANDAH and BWALL AT GSSS GHARROT
Annual maintenance estimate of Roads, Water Supply, Seweraage and Storm water drainage Scheme in Sector-19, Rewari for the year 2026-2027
Construction of New Road in Sector-7, Phase-II at Industrial Growth Centre, Saha in Distt. Ambala
Annual Maintenance Estimate of Horticulture works in sector-4P-II, Hisar for the year 2025-2026.
Construction of Boundary wall, 03 Nos ACR and Major repair of 05 rooms at GMS Raidaska District Palwal (Under DEE)
Annual Maintanence Shopping Centre Sector 5 Rewari
Providing Electrification ,Street Light and illumination in Shopping Center in Sector 7 at Jind.
Special repair of link roads (Road ID 8207, 8804, 9328 and 2676) In Kharkhoda (SC) Constituency Group No 1. (Work plan 2025-26)
Annual maintenance estimate of Roads, Water Supply, Seweraage and Storm water drainage Scheme in Sector-19, Rewari for the year 2026-2027
Annual maintenance estimate for Public Health services in Sector - 23, Urban Estate, Sonipat.
Annual maintenance estimate of Water supply and Sewerage Scheme in Sector-3, Rewari for the year 2026-27
Repair of HSVP Staff Qtr. No.2885 GF and other various Staff Qtrs. in HSVP Colony in Sector 15 Panchkula
Kit Kat Sector-12 Panipat.
CONSTRUCTION OF SULABH SHOCHALYA, CONSTRUCTION OF I.P BLOCKS IN FRONT OF BOOTHS AND SPECIAL REPAIR OF COVERED SHED IN NGM/NVM AT FEROJPUR JHIRKA, DISTT. NUH
Providing and fixing of 50HP non-clog pump for disposal plant at IDC and IE Rohtak
Chang Bhiwani
Mandhana Bhiwani
Flood mitigation civil works at 33 kv s/stn RD-O
Providing Electrification, Street Light and Illumination in Shopping Centre Sector 8, Jind
Providing Electrification, Street Lights and Illumination in Shopping Centre Sector 9 at Jind
This estimate covers the cost of Civil works to prevent the 33 kV S/Stn. Jandli Khurad (Fatehabad) from flood water due to it is located in low lying and flood prone area. It also includes the cost of Earth filling with brick bats and other allied ci
3 phase, 50 Hz, 12.5 MVA, 33/11 KV Step down, outdoor ONAN Power Transformers complete with all accessories
Providing and Laying of RCC Storm Water Line and Repair of Brick Drain
Supply, Erection and Commissioning of Pumps, Diffused Aeration System, Air Blowers, All Aerations Sub-merge Pipelines, Fitting and Other Allied Works at 0.5 MLD CETP in, Industrial Estate, Phase-I, Barwala, Distt. Panchkula
Cleanliness work of Anaj Mandi Subji Mandi Jagadhri with toilets NTM Manakpur with toilets for the period 20.04.2026 to 31.03.2027 Area 124167 Sqm
Door to door collection of domestic waste from the industries of Phase-I, II and III EPIP at IE Kundli
AMtc of EPHS in Sector 4 UE Kurukshetra Construction of manhole repair and rising of manhole brick work plaster RCC slab manhole cover cleaning of 200mmm sewer line Sector 4 Kurukshetra complete in all respect and all other work conting
Door to door collection of domestic waste from the industries of Phase-V sector-53 at IE Kundli