Loading…
Loading…
9 results • Latest
Construction of retaining wall in approaching road at Hotel Kashmir House Dharamshala Distt. Kangra (H.P).
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m Ordinary rock as per the diretion of Engineer in Charge at site.
Construction of retaining wall and repair of boundary wall at Lawn of the Neugal Cafe Distt. Kangra (H.P).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights.
Construction of damaged retaining wall at HPTDC Tourist Inn Rajgarh Distt. Sirmour (H.P).
Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping site for lead upto 10 km periphery area for all lifts, complete as per directions of Engineer-in-charge. Lime, Moorun, Building eubish upto 25Km.
Construction of damaged retaining wall at HPTDC Hotel Shivalik Parwanoo Distt. Solan (H.P).
Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping site for lead upto 10 km periphery area for all lifts, complete as per directions of Engineer-in-charge. Lime, Moorun, Building eubish upto 25Km.
Restoration of damage due to heavy rain during July 2023 at Transport Office HPTDC Shimla Distt. Shimla (H.P).
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level Cement mortar 1:4 (1 cement :4 coarse sand) as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights.
Restoration of damage due to heavy rain during July 2023 at HPTDC BNT Aloo Ground Manali Distt. Kullu (H.P).
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m Hard rock as per the diretion of Engineer in Charge at site.