Loading…
Loading…
282 live135 closing this weekmost from I and FC
282 results • Latest
Ardwani Nallah-Construction of Flood Protection Work at Poshkreeri by way of crates km 9 , km 10 500 at spots
Vethvethroo Nallah- Anti erosion cum flood protection works on the R/S at Qazi Mohallah Qazigund (from D/S Wanpora bridge to U/S steel bridge at spots) RD 10500-11000 m
Brengi NallahConstruction of flood protection work on various tributaries of Gawran Daksum GadoleMagam koilKhalshiDanglHakura Nallah branch of Brengi Gawran Nallah at RDs4550 m 8800 m and Minor at Guridraman Gadool and Etc As perenit
Vethvethroo Nallah-Const of flood protection Work at Hanjipora on R/S of RD 28200 m
Hakhran Nallah-Const. Of FP Work on R/S at village Ard poolia U/S Foot Bridge RD 5520 m
Bringi Nallah-Anti Erosion work on at Village Chicherpora RD 26500 mtrs
FP Bund at left side of Sandran River from Yarbal to foot bridge at Herpora Muniwar Anantnag RD km 43 300 mtrs
Veshow Nallah-Const. of F.P work U/S of Nihama Bridge left side of at RD 10400 Mtrs
Construction of Flood Protection work on Chaka nadi by way Const of Cement Concrete wall at Masjid Sharief
Ardwani Nallah-Construcion of Flood Protecion Work at Chandipora and anti erosion, flood protection work on Right and left side at kanelwan D S bridge by way of laying ofcratesRDKM11,km 12 300
Lidder Nallah Anti Erosion and Flood Protection work U/S and D/S Aung Bridge at KM 40 300 mtrs
Flood protection and river training works from Krad to Tailwani on Aripath RD 4500 Mtrs
Imoh Sundoo Nallah-Flood Protection Works on Critical Spots KM 2 100m to KM 4 600
Sandran Nallah Construction of Flood Protection work by way of Crate Bund with stone pitching on the left side of at village Bonagund RD 18490M
Veshow Nallah Construction of F.P.work on left side at Panipoora at RD.21300 Mtrs
Aripath Nallah-River Training / F.P work on at Chaklipora RD 0 300 mtrs
Hakura NallahConstruction of flood protection work from 0 m to 12000 m from Syphon khartar to Palpora Bridge at RD780 mRD1500 m and RD3590 m
Vethvethroo Nallah- Flood Protection work on Left side of by way of Raising Existing crates Bund at village Bemdal changoo RD 4180m
Brengi NallahConstruction of FP work from RD 800 mtrs to RD 8000 Mtrs from Kralwani vailoo to Soaf Bridge at RD 3600 Mtrs RD4800 Mtrs,RD5500 Mtrs and RD7500 Mtrs
Restoration of Channel Section of Saharan Khul between RD 2500 to 3050 M.
Restoration of Channel Section of Ganjsoo Khul between RD 900 to 3500 M
Dhara Khul- Improvement to critical damaged spots from RD 0-700, to 1600 mts
LIS Barsoo- Modernization from RD 0 to 500 mts and RD 500 to 1500 mts
LIS Samboora- Improvement of canal network from RD 0 to 4300 mts
LIS Pattal- Improvement of canal network from 0 to RD 700 at RD 700 to 2500mts
Stage Contract for annual repairs and maintenance and day to day work of various assets viz Khuls, Office, Buildings, Quarters etc. of Pumphouse Sub-Division Nowshera of Irrigation and F.C. Division Nowshera under MH-2701 for the FY 2026-27
Hiring of Consultancy Firm for Prep. of Detailed Project Report , Designs, Drawings, Estimates and Bid Documents for Const. of Pick-Up Weir Across Pohru Nallah at Buhamma Including Canal Section up to RD 2500 and Outlet Systems of Lal Khul Canal.
Strengthening by way of Construction of Toe wall Parapet wall from RD 0 to RD 3.6 Km for Doodganga Diversion Channel.
Replacement by way of providing/fitting/installation/testing and commissioning of 10 cusec discharge 36 mtr head HC pump coupled with existing suitable rating 3 phase induction motor with all other allied works at LIS Gurha - 1.