Loading…
Loading…
1,391 results • Latest
Construction of FPW at confluence point Hari Budha Surankote
Construction of FPW at Hari Budha Surankote
Restoration of Water Supply Scheme Khour and WSS Gulabgarh of Block Gulabgarh under SASCI
Restoration of Water Supply Scheme Lar and WSS Sheadole of Block Gulabgarh under SASCI
Restoration of Water Supply Scheme Sarh Bagga Angralla and WSS Tukson of Block Mahore under SASCI
Restoration of breached spot of Wujbal Khul branch of Gamma Ladi near the land of Muzaffar Ahmad Kullay by way of construction of retaining wall and cement concrete channel.
Construction of lining wall on right side of minor branch of Gamma ladi near the orchard of Mushtaq Ahmad at New Colony Largam Shopian
Providing/fitting of MS pipes and others Mechanical works to be carried out at LIS Gonipora Handwara.
Construction of Pre Fabricated Structure for Control Room at Gauge Site on left bank of Tawi at Bikram Chowk upstream of Bikram Chowk Bridge
Reconditioning /Repair and strengthening of vacuum circuit Breaker (V.C.B) of H.T control Panel of 800 Amps at L.I.S Rajal.
Construction of crate revetment/ earthen embankment for protection of army defence posts/ structure from manawar Tawi near manjeet post 1 (Crate revetment with earthen bund on tipping section) and Construction of crate revetment/ earthen embankment
Construction of flood protection work in Mathwar Nallah and its tributaries at spots / Mathwar Temple
Execution of various Mechanical Works and Periodic maintenance of Departmental Bolero Camper reg. no. JK05L2389.
Restoration/Re-construction of flood protection work by way of revetment crates and embankment near B.O.P. Tanvar and U/S and D/S of B.O.P. Maluchak on right bank of River Basantar at village Kamour and Rangoor near International Border (At spots.)
Restoration/Re-construction of flood protection work at vulnerable spots to safegaurd the agriculture land of inhabitants on the left and right side of local nallahs in Block Bari Brahmana, Rajpura and Ghagwal (At spots)
Restoration/Re-construction of flood protection work by way of revetment crates upstream of BOP Nursery on Right bank BOP Bund Tip on Left Bank of River Basantar near International Border and revetment crates near RTO Office and downstream NH-44 oppo
Restoration/Re-construction of flood protection work by way of revetment crates and embankment near Tower and downstream of B.O.P. Tanvar on right bank of River Basantar near International Border (Breached portion) At spots
Providing of men, Machinary, materials for execution of emergent works at site as per requirement due to breachesfloodscalamities encroachment removal etc of Martand canal of Irrigation ISD Bawan (Major Irrigation ) MandR 2701 for the F.Y 2026-27P2nd
Providing of men, Machinary, materials for execution of emergent works at site as per requirement due to breaches floods calamities encroachment removal etc of Dadi canal (Major/ Medium Irrigation ) MandR 2701 for the F.Y 2026-27 Phase 2nd.
Restoration of Water Supply Scheme Maslote including Providing and laying of G.I Pipe and Crate Work in Block Thuroo under SASCI
Permanent restoration and improvement of Sarh Khul at Spots between RD 0 to 400 mtrs, RD 500 to 1400 mtrs, RD 1500 to to 2300 mtrs, RD 2700 to 2850 mtrs under SASCI.
Stage Contract for Annual Repairs and maintenance of various Irrigation scheme of Kalakote section under Irrigation Sub-Division, Siot
Stage Contract for Annual Repairs and maintenance of various Irrigation scheme of Nowshera section under Irrigation Sub-Division, Siot
Stage Contract for Annual Repair and maintenance of Lift Irrigation scheme Langer/Kalsian and its distribution network including sump clearance.
Stage Contract for Annual Repair and maintenance of Dabber Potha Lift Irrigation scheme and its distribution network including sump clearance
Stage Contract for Annual Repair and maintenance of Rajal Lift Irrigation scheme from RD 0 to 3600, its distribution network including sump clearance, repair/renovation of Divisional office complex and Sub Divisional office building
Construction of Crated Revetment along with earthen embankment and studs on left bank of Nikki Tawi from Ring Road Bridge to Indo-Pak Border (at Spots).
Construction of Damaged Flood Protection Work by way of 18m long Stud 5 Nos. with 6 M Apron on Right Bank of River Waddi Tawi from Bikram Chowk Bridge to Ring Road Bridge (At Places).
Restoration of Water Supply Scheme Thuroo including Providing and Laying of G.I Pipes and Protection Work in Block Thuroo under SASCI.
Replacement of damaged and worn-out machinery equipments at LIS Jaggerpora.
Complete Overhauling of 20 cusec VT Pump for Unit 2nd at LIS Goripora.
Permanent Restoration of Barmandal, Deri Khetar to panoti, Jatta mallian, Durga Khetar and Sangeri Khul at spots
Permanent Restoration of Thumba Nehoti and Thandapani Khuls at spots.
Permanent Restoration of Khabber,Sialtha, Uttra Khetar, Deri Khetar, Chhitri and Bansi Khetar Khuls at spots.
Permanent Restoration of Panjnara, Broh-I, Broh-II, Dhanwan and Dalyote Khuls at spots.
Restoration by way of Design, fabrication, providing and fixing of copper HV/LV Coils for 2.5 MVA capacity Power transformer 33 kV/6.6 kV with, mounting and accessories (Unit- I) for smooth running of LIS Ranjan.
Restoration of WSS Hunder Challad, WSS Kanthan Darmatha and WSS Arnas under SASCI
Operation watch and ward of departmental electro-mechanical equipment installed at LIS Kandyar in district Reasi.
Restoration of electro-mechanical components along with other allied works at Lift Irrigation Schemes Zinda Peer and Bindala Mang at district Rajouri
Restoration of WSS Judda and WSS Sawlakote under SASCI.
Restoration of WSS Dhanour Dansal and WSS Dugga Dharote under SASCI
Restoration of WSS Nomal Chountra, WSS Batora, WSS Gurha Chandi, WSS Beyota, WSS Thub Panassa, WSS Kesari Bagli, WSS Sai Lanjan and WSS Mata Namal under SASCI
Restoration Improvement of Damaged spots of Hillan khul
Restoration Improvement of Damaged spots of Jhullas khul
Restoration Improvement of Damaged spots of Khanetar khul
Restoration Improvement of Damaged Spots on Dingla D1 Khul Dingla D4 Khul and Dingla Main Khul
Restoration Improvement of Damaged spots of saikloo khul at places
Restoration Improvement of Damaged spots of Chaktroo khul at places
Restoration Improvement of Damaged spots of Sarar main khul
Restoration Improvement of Damaged spots of Chandak khul at places