Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
18,675 live8,458 closing this weekmost from Central Railway and Western Railway
18,675 results • Latest
Extension of Track Machine siding to 750 mts with OHE in Koraput station under the jurisdiction of ADEN/KRPU in KK line of Rayagada division.
Surat - Design, Development, Supply, Installation, Testing and Commissioning of System Includes Modification, Augmentation and Extension of Quick Watering System.
Comprehensive Annual Maintenance Contract for M/s BEMCO HRE Set including hydraulic testing of Hose pipe and Load testing of wire rope at BA, BL,UDN and NDB for a period of 3 Years.
Engineering procurement and Construction (EPC) of Construction of Construction of Viaducts, ROR/RFO, Major Bridges, Minor Bridges, Animal Underpass, Animal Overpass, RUB/LHS, ROB, Earthwork, Blanketing, trolley refuge, turfing, Buildings, retaining wall, toe wall etc. and other associated works for construction of new Double Line track for DFCC loading from Ch. 123.600 to 135.650 in Koderma Detour section in Sonnagar-Andal 3rd and 4th line project on EPC Mode in Dhanbad Division of East Central Railway' .
Comprehensive Annual maintenance contract for Hitachi make Electronic Interlocking at 16 stations over Bengaluru Division for 2 years
SWR-SBC Division- 1)SWR-SBC Division-Modernization & Improvement of S&T assets by Provision of Fencing and Strengthening Location boxes/Signals Foundations in SBC Division.2)SWR-SBC Division- Correction of aspect control chart for combination of distant signal with stop signal at 8 LC gates.
Execution of TRR (P) for 20.377 Tr. KM and TFR FOR 24.129 Tr. KM in patches between GPJ - MVG under the jurisdiction of ADEN/KRPU in KK line of Rayagada Division.
Outsourcing of Operation and Maintenance Blood Centre at Divisional Railway Hospital, South Eastern Railway, Chakradharpur.
Design, Supply, Erection, Testing & commissioning of (i) 25KV, 50 Hz AC, Single Phase OHE electrification works at Deokali & Jharekhapur Railway Station in connection with conversion of Deokali and Jharekhapur Railway Station in to Three Line Crossing Station with Goods Platform in Sitapur-Mailani Section of Lucknow Division (ii) Construction of ROB Viaduct, LHS, approaches in lieu of level crossing no- 182 between KMJ-RDN station in CPA and Kasganj section in Izzatnagar Division (iii) Construction of 02 Lane ROB in lieu of LC No 245/B1, at KM: 630/9631/0 between Mankapur- Jhilahi Railway stations of Lucknow Division.
Provision of MEA & divyangjan facilities at stations like tactile path, parking area, divyangjan toilet, COP, etc. on JUC-FZR section under DEN-HQ/FZR in C/with Provision of MEA & divyangjan facilities at stations like tactile path, parking area, divyangjan toilet, COP, etc. at 55 nos. stations under DEN-HQ/FZR.
Electrical work in c/w provision of minimum essential amenities at various stations of BKN div to recoup shortfall in the jurisdiction of DEN/East/BKN, provision of high level island passenger platform & other passenger amenities between line no. 9 & 10 & extension of platform no.6 at Hisar station, raising of PF no. 1 at Lahli & Bamla station to high level & extension to accommodate full length trains & raising of PF no. 1 at Dhana Ladanpur halt station & extension to 480 m, raising of rail level PF no. 1 at Jodhkan halt, Kharak halt & Bhojawas Halt station over BKN division along with extension to 480 m, raising of rail level PF no. 1 at Khabra Kalan halt, Nangal degrota halt, Nyoli kalan halt & Bajekan halt station along with extension to 480 m, provision of 6 m wide FOB at Jharli & 3 m wide FOB at Nangal Pathani halt station (double line section), provision of 3 m wide FOB at Manheru, Sudhrana, Kishangarh Balawas, Patuwas Mehrana halt station (double line section) & provision of 6m wide FOB at Jatusana & 3m wide FOB at Fatehgarh Haryana halt station, provision of additional HL full length passenger platform and FOB at Mandi Adampur station over Bikaner division.
Electrical work in c/w provision of tool room cum rest room 36 nos. in jurisdiction of ADEN/RTGH & 94 nos. in the jurisdiction of ADEN/Line/BKN, SDLP & SOG over BKN division.
Electrical work in c/w provision of Distributed Electronics Interlocking at Hisar & Sri Ganganagar station over Bikaner Division.
Electrical work in c/w provision of new Hot standby EI architecture at 09 stations of SOG-HMH-SGNR section, construction of OFC room with toilet facility at Tibi & Jaitsar station, Provision of RO plant with 225 KL RCC OH Tank & 40kL cap UG tank at SGNR and replacement of old corroded pipe line for drinking water supply at Khinania & Nohar railway colony and Conversion of non-running line no. 4 into running line at Mandi dabwali, provision of new booking office, waiting hall, waiting room, circulating area with separate gate and extn of PF shelter by 6 bays at Pilibanga and Allied Infrastructure Development for the CNC Tandem Under floor Wheel Lathe provision at SGNR Depot over Bikaner Division.
Gapless lighting arrestor for 25 KV, 50 HTZ AC electric locomotive Spec. No. ELRS/SPEC/LA/ 0005, July-1999 & CLW Spec. No. CLW/ES/ SK-1/A-12 Alt. D as above.
Outsourcing for USFD Rail & Weld testing as per Indian Standard Specification for Ultrasonic Testing of Rails and Welds (Provisional) Revised 2020 (with latest amendment) and manual for Ultrasonic testing of rails and welds revised 2022 (with latest correction slip ) issued by RDSO with contractor's own operators in Kota Division for 3 years.
Provision of MEA & divyangjan facilities at stations like tactile path, parking area, divyangjan toilet, COP, etc. on FZR-FKA section under DEN-HQ/FZR in C/with Provision of MEA & divyangjan facilities at stations like tactile path, parking area, divyangjan toilet, COP, etc. at 55 nos. stations under DEN-HQ/FZR.
Provision of MEA & divyangjan facilities at stations like tactile path, parking area, divyangjan toilet, COP, etc. on LDH-FZR section under DEN-HQ/FZR in C/with Provision of MEA & divyangjan facilities at stations like tactile path, parking area, divyangjan toilet, COP, etc. at 55 nos. stations under DEN-HQ/FZR.
Provision of MEA & divyangjan facilities at stations like tactile path, parking area, divyangjan toilet, COP, etc. on BTI-FZR & KKP-FKA sections under DEN-HQ/FZR in C/with Provision of MEA & divyangjan facilities at stations like tactile path, parking area, divyangjan toilet, COP, etc. at 55 nos. stations under DEN-HQ/FZR.
Clariant make coolant (type anti frogen-N water mixture 30%)
4-yearly schedule of Transmission system, Axle Drive, Overhauling of Transmission Oil Cooler and & Replacement of Transmission System hoses of SPART / HS SPART Coaches.
Annual Repairing Maintenance contract of Deltron Make Universal Fail-Safe Block Interface (UFSBI) at 09 Nos. Block sections (17 Nos. Stations)u nder Malda Division for the period of two years .
Execution of works for Repairs to Major and minor bridges like jungle cleaning, desilting, epoxy grouting, weepholes, head walls, retaining wall, side drains, guide wall, ballast support wall, inspection steps, bridge tablet, drop wall etc. under the jurisdiction of ADEN/KRPU on KK Line of Rayagada Division.
Supply and fitment of brake piping arrangement for LHB bogie as per drawing LW36004.
Shifting of S&T assets in connection with construction of community Hall by RLDA at GHY station area.
Satna - Provision of Ballastless Track (BLT-IFS system) for station development at Satna Station on Platform no. 1 & 3.
Design, Drawing, Supply, Erection, Testing and Commissioning of 25 KV OHE and allied work in connection with "Provision of Over Run Line (120 mtr.) & extension of existing Loop Line at Nischindapur
Execution of S&T work in connection with 'Provision of Closed Circuit Television System at 11 nos LC gates (Non-interlocked) over Ranchi division.'
Provision of Chlorination system in Metro Stations of Blue Line (25 Nos. Metro Stations) from KDSW to KKVS except KKHG of Metro Railway, Kolkata.
Secunderabad Division Electrical Maintenance Department - (i) MABD- Development of Parcel office at Mahbubabad (ii) WL-Development of Parcel office at Warangal (iii) KMT-Development of Parcel office at Khammam (iv) MCI- Development of Parcel office at Manchiryal - Electrical arrangements.
Supply, installation, testing and commissioning of standard signages Board at 04 Railway stations i.e HDB-AUB-KDPR-BLGT over KIR Division and maintenance of the same for 2 years
Enhanced/Improved Onboard services (OBHS+OBLD) in nominated trains for 02 years in DNR Division
Comprehensive Annual Maintenance contract for maintenance of electrical controls, Transmission, Axle drive & Cardan shaft etc. fitted with HS-SPART at DHN in East Central Railway for 03 years on single tender basis.