Loading…
Loading…
14,616 results • Latest
STUD SLIP RING 3/8-16X5-5/8" as per Drg.No. 8345700 ALT Ab
HYDRAULIC HOSE
Diversion & modification of HT (33KV & 11KV) and LT line across and along the railway track at different locations between Aluabari Road Junction & Thakurganj railway station, Thakurganj & Siliguri Junction railway station & Siliguri Junction & New Jalpaiguri railway station for clearing electrical infringement with proposed double line.
Bhavnagar Division: Rebuilding of arch bridges (8Nos) by providing RCC Box under DEN (West) Jurisdiction. (With maintenance period up to 4 years as per latest guideline)
Group work :- 1. Kanalus-Porbandar Section- Construction of RUB in lieu of LC No. 45 C class non Interlocked at KM 912/9-913/0. 2. Kanalus - Porbandar Section- Construction of RUB in lieu of LC No. 26 C class non Interlocked at KM 882/10- 883/0. 3.Kanalus-Porbandar Section- Construction of RUB in lieu of LC No. 70 C class non Interlocked at KM 947/5-6. 4. Jetalsar- Wansjaliya section- Construction of RUB in lieu of LC No. 79 C class Traffic Interlocked at KM 167/4-5. 5.Jetalsar- Wansjaliya Section - Construction of RUB in lieu of LC No. 70 C class non- Interlocked at KM 150/1-2. 6.Jetalsar- Wansjaliya section- Construction of RUB in lieu of LC No. 96 C class Engg. Interlocked at KM 189/6-7. 7.Rajkot-Somnath section: Construction of RUB in lieu of Manned LC No. 64 C Engg. Non-Interlocked at Km 79/2-3. 8.Jetalsar- Wansjaliya section - Construction of RUB in lieu of LC No. 84 C class non-Interlocked at KM 171/4-5. 9.Rajkot-Somnath section: Construction of RUB in lieu of Manned LC No. 74 C Traffic at Km 93/3-4. 10.Kanalus - Porbandar Section: - Elimination of 2 Nos. of Level Crossings by Provision of Road Under Bridges (Twin Box) at LC Nos. 6 and 30. 11. Kanalus - Porbandar Section: - Elimination of 5 Nos. of Level Crossings by Provision of Road Under Bridges (RUBs) at LC Nos. 3, 10, 13, 15, and 29. (With maintenance period up to 4 years as per latest guideline)
FILTER ELEMENT