Loading…
Loading…
14,960 results • Latest
(A) Signalling work for Construction of ROB in lieu of LC-415-A at Km 1313/0-1 and (B) Construction of Grade separator with stair (FOB) at LC no. 34L at KM 1348/31-33 in NYN-MKP section of Prayagraj Division.
TAB BETHANECHOL 25MG/TAB/CAP IN STRIPS
Raising of platform at BRPK, BHKA, BGRD, BSLA, MTAP, URP, NCPM, NCP, GOF, HB, BMG, MATL (Total=16 Nos) with cement concreting with all ancillary works under the jurisdiction of Sr. DEN/II/SDAH.
Extension of Existing Pit No. 04 with associated infrastructural facilities for maintenance of 24 LHB coaches in rake at Chitpur.
Rajkot Division :- Replacement of old and dilapidated Type-II Qtrs. at MODPUR (04Nos.), GORINJA (10 Nos) and MITHAPUR (26 Nos) under Sr.DEN-West jurisdictions.
Part-C: Replacement of Rusty Cantilever in DUK section inconnection with Augmentation of TRD assets by replacing overaged section insulators, low-rating isolators, and rusty cantilevers, alongwith upgradation jumper.