Loading…
Loading…
245 live89 closing this weekmost from Integral Coach Factory and Indian Railways
245 results • Latest
C/S of Side wall Frame Work, Welding Parts and Carline (LWACCN PP)
BODY BOLSTER ASSEMBLY (VB SLEEPER MC, NDTC, TC & DTC)
C/S of Bio-Tank Mounting Arrangement (VB Sleeper DTC)
SS MIG WIRE E309L SIZE 0.8 MM, FEEDER ROLLER SUITABLE FOR SIZE 0.8 , CONTACT TIP SUITABLE FOR 0.8 mm, TIP HOLDER SUITABLE for 0.8mm
SUPPLY AND INSTALLATION OF STAINLESS STEEL PANELS AND MOULDINGS FOR SIDE WALL, END WALL, PARTITION AND SHUNTING CAB ROOF WITH CAT WALK ARRANGEMENT.
BOLTED ARRANGEMENT OF CHANNELS FOR PARTITION FRAME FIXING
KIT ITEMS FOR UNDER FRAME WELDING PARTS (VB SLEEPER TC)
Additional Stainless steel double ferrule fittings,clamps and tubes
C/S of Frame work, Welding parts and Carline (VB Sleeper NDTC)
Single Row Deep Groove Ball Bearings (V2) conformingto IS6455 (Q3)
Weightand High Cranking Performance (V2) Conformingto IS14257 (Q3)
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS15549 (Q3)
Hand-Operated Chain Pulley Block (V2) asper IS3832 (Q3)
Custom Bid for Services - Unskilled assistance for testing and related activities at CMT laboratories in Shell and Furnishing division Similar Category Facility Management Service - Outcome Based