Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
179 live101 closing this weekmost from Integral Coach Factory and Indian Railways
179 results • Latest
Modular Piano Type Domestic Electrical Switches ISIMarked To IS3854 (Q2)
(A) Proposed covering of Open Gantry area between G-Shed and H-Shed (2500Sqm Shed) with crane and Construction of Lean to Roof in Western side of G shed and Eastern side of H Shed in Shell Factory (B) Construction of 1125 sq.m stores shed inside shell factory (C) Provision of lift facility at AWTI (Civil works)
Housekeeping and hospitality services for ICF officers Holiday home and ICF Subordinate holiday home at Kanyakumari - for 2 years.
Operation and maintenance of facial and biometric access control system in ICF.
Porcelain 9 tonne insulator (RI 6020-1) (1050 mm CD)
Repositioning (rotating 180 degrees) of the Traverser,Inv.No.TR 11F in the Furnishing division of ICF
[110V Electrically operated double insulated rotary drill with 15 sqmmx2 core flexible multi strand copper cable with 16A 3 pin safety plug . Power input -600W. No- load speed 0-2600 RPM .Chuck capacity 1.0 to 13 mm .Drill spindle connecting thread 20 UNF .Drilling diameter for steel & Aluminium 13 mm and for wood -30mm .Forward and reverse speed rotation .weight -1.7 Kg . MAKE : BOSCH , HLITI, SKILL or MAKITA .Model GBM 13 RE . ]
Comprehensive Annual Maintenance Contract (CAMC) of CNC Cylindrical Axle Grinding Machine (Inv No.2224), Automatic Dimension Measurement & Display system (Inv No.2224/1) & its Electrical Hoist (EL-185) available in Shop 12 of Shell Division, ICF for a period of three years.
C/S OF BODY SHELL ITEMS AND WELDING PARTS ON TROUGH FLOOR (LWSCN)
Electrical Design Automation for ICF D&D Centre for one year
(A) New Raw & Metro Water Pipelines: East Colony to Furnishing Factory & Main Pump House to Block 165(B) Repairs to leakages in GLR & OHT and Interconnection of pump houses in South colony.(C) New GLR & OHT in South colony(D) 3.00 Lakh GLR in East colony- 2Nos(E) OHT & GLR in Shell Factory(F) Reconstruction of 3 Lakh litres capacity at GLR in East Colony - 2 Nos
Generalpurpose Machineryand Spindle Oils (V2) Conformingto IS493 (Q3)