Loading…
Loading…
4,364 results • Latest
Clearing drainage congestion under the bridge of Kalyani Expressway in Ichapur Khal for a length 45 metre inMohanpur GPBarrackporeII Block PSBasudebpur DistNorth 24 Parganas Under Urban Drainage SubDivision NoI of Urban Drainage Division during the
Repair to the damaged left bank of sultanpur khal from 400 m to 450 m for a length of 50 mtrs in Dumdum Municipality PS Dumdum Dist North 24 Praganas under Urban Drainage Division during the year 2026_2027
Maintenance and Repair work of Surjosen Bridge at ch1000 m of Ichapur Khal near BabanpurLockgateBazarMohonpur GP BarrackporeII Block PS MohonpurDistNorth 24 pgs Under Urban Drainage SubDivisionI of Urban Drainage Division during the year 2026_27
M_R to 2Two Nos partly damaged wooden bridge near Barishal Para at Ch48 over FBRuia Khal under Sheuli GP BlockBarrackporeII and PSTitagarh and near Ramkrishna Sangha at Ch 15 over CC1 Khal under Madhyamgram Municipality in PSMadhyamgram under Urba
Maintenance and Repairing Right Bank of Bager Khal from ch 1.2 KM to ch 1.240 KM for a total length 40 mtr near Murgipara Bridge I under Kanchrapara Municipality Dist 24 Parganas during the year 2026_27
M_R to 3 nos RCC bridge at Sree Bhawan over LLL2K Khal at Ch75 under North Dumdum Municipality in PSNimta and Airport at Sukantanagar Bazar over KCA Khal at Ch21 under New Barrackpore and Madhyamgram Municipality in PSAirport and New Barrackpore at D
Repair and Maintenance of sump well of heavy duty pump near Ch93 at BT Road crossing and Ch136 at outfall pumping station along with temporary pump shed near outfall pumping station Khardah Municipality PS Khardah Dist North 24 Parganas during the ye
Maintanance and Repair work from chainage 2000 to chainage 2040 Metre of Left Bank of Babanpurkhal in North Barrackpore Municipality BarrackporeII Block PSMohonpur DistNorth 24 Parganas Under Urban Drainage Sub-Division NoI of Urban Drainage Division
Maintenance and Repair of Partly damaged Wooden Bridge near Kalyan Gram at ch1200 m over Babanpur Khal under North Barrackpore Municipality BarrackporeII PSMohonpur in the dist of North 24 pgs Under Urban Drainage Sub-Division-I of Urban Drainage Div
Clearing drainage congestion in Babanpur Khal From chainage 1700 to chainage 1850 Metre for a length of 150 M in North Barrackpore Municipality BarrackporeII Block PSMohonpur Dist North 24 Parganas Under Urban Drainage Sub-Division NoI of Urban Drain
Erection of Height Bar over both side of dilapidated Motir Pole RCC Bridge over Nowi Khal at Ch630 in Rohanda Chandigarh Gram Panchayet under Block BarasatII Bidhan Nagar Municipal Corporation within PSMadhyamgram and Narayanpur District North24Parga
Clearing of congession from Udaipur branch khal for a length 338 metre by removing accumulated silt within Kamarhati municipality Dist North 24 Parganas under Urban Drainage Division during the year 2026_27.
Emergent restoration on right bank of river Mahananda at village- Rangamatia of GP- Maharajpur in Block- Ratua-II, PS-Pukhuria, Dist-Malda
Emergent restoration on right bank of river Mahananda at village Uttar Maharajpur of GP Maharajpur in Block Ratua-II, PS Pukhuria, Dist Malda
Emergent Restoration of bank on right bank of river Mahananda at village Elahabad, Mouza Elahabad of GP Maharajpur in Block Ratua-II, PS Pukhuria, Dist-Malda
Renovation of Bhaluka Bungalow and Office compound boundary wall and approach road under Mahananda Embankment Division in Block-Ratua-I, PS-Ratua, District-Malda 3rd Call
Restoration of wooden bridge over maja Damodar at Hariharpur for a length of 22.30 m in G.P.-Kurchi Shibpur, Block-Udaynarayanpur, Howrah
Restoration of Baichi Jalapara Wooden Bridge over Patkelghata khal for a length of 16.5 M in G.P.-Kharuberia, Block-Shyampur-II, P.S.-Shyampur, District-Howrah
Emergent Repair and Restoration damaged Protection work on Right Bank of Mahisdhara Khal near the outfall into River Hooghly, adjacent to Radha Krishna Mandir, G.P. Jorhat, Block and P.S. Sankrail, Howrah
Emergent Repair to the bank protection work on the right bank of river Hooghly adjacent to Shree Bauria Gaudiya Ashram within ward no 10 of Uluberia Municipality PS Bauria Dist-Howrah
Clearing and removing of water hyacinth of Rajapur Branch Khal - I and II for a total length of 7.0 km for the period of 365 days during the year 2026 - 2027 in Block and P.S. - Jagatballavpur and Domjur, Dist- Howrah
Maintenance of Ichapur Khal from Ch 0.00 m _Koirapur Sluice to Ch 4350.00 m _10 vented outfall Sluice by clearing and removing weeds water hyacinth solid_ semi solid compact mass jungles etc for a period of 365 days within North Barrackpore Municip
Maintenance of Udaypur KLMNE Khal from 2700M to 6170M and Udaypur branch Khal from 0 M to 338 M by clearing and removing water hyacinth cutting and clearing jungles etc within Kamarhati Baranagar South Dum Dum Municipalities PS Belghoria Dum Dum
Clearing and removing of water hyacinth of Saraswati River from Jelepara to Khutir Pole for a length of 6.50 km for the period of 365 days during the year 2026 - 2027 in Block and P.S. - Domjur, Dist-Howrah
Clearing and removing of water hyacinth from Gurer Khal of length 4.50 Km and Sutir Khal -I of length 1.00 Km for the period of 365 Days, during the year 2026-27 in Block- Panchla, Dist. - Howrah
Maintenance of Koirapur Khal from Ch. 0.00 m (Noai Offtake) to Ch. 3850.00 m.(Koirapur Sluice) by clearing and removing weeds , water hyacinth, solid / semisolid compact mass, jungles etc. for a period of 365 days. within Barrackpore- I , II Block
Maintenance of Babanpur Khal from Ch. 0.00 m. to Ch. 2100.00 m , Palta Khal from Ch. 0.00 m to Ch. 540.00 m by clearing and removing weeds, water hyacinth, solid / semisolid compact mass , jungles etc. for a period of 365 days within Barrackpore
Clearing and removing of Water hyacinth of Rajapur Main Khal from 10.00 km to 28.00 km and Kamarnala Khal for a length of 2.8 km for the period 365 days during the year 2026-27 in Block and P.S.-Panchla and Jagatballavpur ,District-Howrah
Maintenance of Shyamnagar Khal from Ch. 0.00 m. to Ch. 2100.00 m. , Branch channel of Shyamnagar Khal from Ch. 0.00 m to Ch. 900.00 m by clearing and removing weeds, water hyacinth, solid / semisolid compact mass , jungles etc.
Maintenance of FB (Ruia) Khal from 0.00 K.M to 3.81 K.M. by clearing and removing weeds, water hyacinth, solid/ semisolid compact mass , jungles etc. within Barasat- I Block and Barrackpore- II Block in P.S Titagarh, Rahra and Mohanpur,
Clearing and removing of water hyacinth in between Telihati R.C.C. Bridge to Budul RCC bridge of Kana Damodar River for a length of 27.50 km for the period of 365 days during the year 2026-27 in Block and P.S. - Jagatballavpur and Panchla
Maintenance of IK , H1I Khal in between 0.00 K.M and 2.377 K.M. by clearing and removing weeds water hyacinth, solid/ semi solid compact mass, jungles etc.under Block Barrackpore II ,within North Dum Dum and New Barrackpore Municipality
Clearing and removing of water hyacinth including clearing of Jungles along the slope of bank for the period of 365 days from out fall point of Sluice (0.00 m) to 800.00 m of Sarnamoyee Khal under Howrah Drainage Sub-Division
Maintenance of KCA Khal in between 0.00 K.M and Ch 1.768 K.M. by clearing and removing weeds water hyacinth, solid/ semisolid compact mass and jungles etc. within New Barrackpore ,Madhyamgram Municipality, in P.s New Barrackpore ,Madhyamgram,
Maintenance of LLL2K Khal in between 0.00 K.M and 3.474K.M. by clearing and removing weeds water hyacinth, solid / semisolid compact mass and jungles etc. within North Dum Dum , Madhyamgram Municipality in P.S- Nimta and Airport
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank for the period of 365 days from Satyen Bose Road bridge(Ch-0.00 Km) to Khatir Pole(Ch-6.00 Km) of River South Saraswati
Maintenance of Drains along Belgharia Ex-pressway connector Khal in between 0.00 K.M and 3.18 K.M. by clearing and removing weeds water hyacinth solid/ semisolid compact mass and jungles etc. within North Dum Dum Municipality in P.S Airport
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank for the period of 365 days from Ch. 0.00 m to 5130.00 m of Mahishdhara Khal under Howrah Drainage Sub-Division
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank for the period of 365 days from 0.00 Km to 2.20 Km of Branch -VI of Howrah Drainage Channel
Clearing and removing of water hyacinth for the period 365 Days for the length 10.350 Km of Borjola Khal under Howrah Drainage Sub-Division of Lower Damodar construction Division during the year 2026-27
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch.0.00 m to 1885 m of Nayabaz R.C.C. U trough Drain for the period of 365 days under Bankra II and III G.P
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch.0.00 m to 2390.0 m of Branch Channel III for the period of 365 days under Chawakpara-Anandanagar G.P.
Desiltation of Howrah Drainage Channel from 4.0Km to 12.5 KM within Bally Jagacha and Domjur Block, P.S. Nischinda, Domjur and Jagacha , District Howrah.
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch.0.00 m to 1600.0 m of Branch channel -I for the period of 365 days under Jagadishpur G.P , Block - Bally-Jagach
M/R to protection work at left bank of Chetua Chandanapara Khal for a length of 75.00 Metre near Potaldanga R.C.C Bridge in G.P-Mugkalyan, Block-Bagnan-II, P.S-Bagnan, District-Howrah.
Clearing and removing of water hyacinth and solid / semi solid compact mass ,plastic , thermocol , garbage etc. from ch.0.00 m to 890 m of Bultigri Khal-II and ch.0.00 m to 1454 m of Bultigri Khal-I for the period of 365 days , Bankra -II G.P
M/R to Wooden Bridge (Length-24.00 Metre) over Banaspati Khal near Moner Mandir in G.P-Baniban, P.S-Rajapur, Block-Uluberia-II, Dist-Howrah.
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch.0.00 m to 1600.0 m of Branch Channel-II for the period of 365 days ,under Chawakpara-Anandanagar G.P
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch.7200.0 m to 12500.0 m of Howrah Drainage Channel for the period of 365 days , Bankra-II G.P , Chamrail
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch.3000.0 m to 7200.0 m of Howrah Drainage Channel for the period of 365 days, Bankra -II G.P