Loading…
Loading…
4,367 results • Latest
Maintenance and repairing along the right bank of Sealdagong Main Channel in between Ch 15.200 Km and Ch 15.600 Km For alength 200.00 m at Mouza Jampur, G.P.GopalpurII BlockHaroa in the District North 24parganas.
Restoration of embankment inbetween 2.50 km and 3.00 km along Right bank of river Nonagong at Mouza Kalikapur Block Barasat II in the District of North 24 Parganas.
M/R. to approach road of a wooded bridge over river Sunti at 18.240 Km.of Mouza Joypur, Block - Barasat I in P.S. Barasat, Dist. North 24 Parganas.
Protection work by bullah piling from 3.510 Km. to 3.600 Km. for a length of 90.00 mtr. on right bank of the Banikantha Khal under Block Barasat II in P.S. Madhyamgram, Dist. North 24 Parganas .
Raising and strengthening right bank of river Padma in between Ch 1.50 km. and 2.70 km. near Patua Bridge in Block and P.S. Swarupnagar Dist. North 24 Parganas
Raising and strengthening left bank of River Jamuna in between ch. 4.50 km and 5.50 km within Block and P.S. Swarupnagar Dist North 24 Pgs.
Protection work to the left bank of river Kalindri for a length of 500 M at Vill. Simla in Block- Ratua -II, P.S. Pukhuria, District- Malda.
Strengthening and improvement of Tikiapara Kadobari Embankment along the right bank of the river Karala for a length of 1230 m at Subhas Unnayan Pally within Ward No 09 under Jalpaiguri Municipality PS Kotwali Dist Jalpaiguri
Annual Maintenance and repair to West Block of Jalasampad Bhawan, Sector I, Block DF Salt Lake for the year 2026 27
PROTECTION WORK ALONG THE LEFT BANK OF RIVER NEORA FOR A LENGTH OF 300 M AT SALBARI AREA NEAR GOSHALA WITHIN GP BIDHANNAGAR, BLOCK and PS MATIALI, DIST. JALPAIGURI
Annual Maintenance and repair to South Block of Jalasampad Bhawan, Sector I, Block DF. Salt Lake for the year 2026 27
Sub-Soil Investigation for Proposed Safety measures of Bathing Ghats at right bank of River Bhagirathi under Katwa Municipality P.S - Katwa, District - Purba Bardhaman under Katwa Irrigation Sub - Division of Damodar Canal Division.
Short term measure through Placement of Sand Filled NonWoven Mega Geo Bags to Fill the Ditch at the Downstream River Bed of Tilpara Mihirlal Barrage under Block Suri-I, P.S.-Suri, District- Birbhum
Name of work Annual Maintenance Contract in connection with engagement of Watch and Ward Staff Without Arms for guarding of Bagjola Pumping Station at Kultigong Block PS Haroa Dist North 24 PGS
Compound Sanitary and Plumbing works of Chandannagar Irrigation Sub Division office an Lichutala Irrigation colony for 210 days at Lichutala, Chandannagar within Chandannagar Municipality Corporation, Dist-Hooghly under LDID
Providing Electrical wiring alongwith electrical accessories at conference room of Chief Engineer SW and office of Junior Engineer Mechanical and Electrical Division Midnapore.
Riverside Railing work to the R/Bank of river Hooghly at back side of Bidhan Collage for a length of 74 meter under Rishra Municipality, Dt Hooghly.
Urgent protection work of right bank of Old Arapanch Branch Channel adjacent to Arogya Sadhan Charitable Trust near Arapanch Misson ,Block-Sonarpur ,Dist- 24 Pgs (S) under MDD-II during the year 2026-27
Making temporary barrier and repairing across at SAMD (P-1) Old Arapanch, New Arapanch, Uttarbhag Khorigoda, Makrampur Khorigoda, Metiary Khorigoda from 1st June of 2026 to 31st May 2027 under MDD-II (3rd Call)
Annual Maintenance of Chinsurah Irrigation Compound during 2026-27 under Lower Damodar irrigation Division.
Toe protection of Rup Right Schedule D embankment length 3100 m from house of Arjun Singh at Baramritberia to Kichukkhan Resturant at Ichhapur within Blocks and PSs Mahishadal , Nandakumar, Dist Purba Medinipur.
Emergent restoration of Kultola Wooden Bridge over Moja Damodar Link Channel in GP-Palaspai - I, Block - Khanakul - II, Hooghly and Shibgachia Wooden Bridge over Moja Damodar in GP- Jhikira, Block- Amta-II, Howrah.
Replacement of control cables from 33 KV Sub-station to pump house and improvement of 33KV sub - station of Bagjola Pumping Station at Bagjola in P.S. Haroa, Mouja Kamargati, G.P Kulti, Block Haroa,Dist North 24 parganas.
Renovation of Illumination system including modification of electrical wiring system at bunglow, offices and quarters for ensuing GangaSagar Mela 2026 at Kakdwip Irrigation Colony, P.S- Kakdwip, Dist South 24 parganas
Maintenance and repair of canal bank in between ch 0 to ch 75 of SBC within Block and Ps Indpur,Dist Bankura under Bankura Irrigation Division during 2026 27
MR to canal in between Ch1295 and Ch 1470 of BBC under Vishnupur Irrigation Sub Division of Bankura Irrigation Division during the year 2026 27
Maintenance and repair work of boundary wall of Kangsabati C type colony towards Taragati Samanta Road at Kenduadihi Bankura under Bankura Irrigation Division Bankura during the year 2025 26
MR to BBC of Cross Drainage structures at ch 36, ch117, ch157 ch 260, ch 311 and ch 403 and inlet structure at ch 252 LS before monsoon of BISD under BI Division, Bankura during the year 2026 27
Protection work by using HDPE bags for length of 200 Meter to the right bank of river Silaboti, at village Bhelaidiha, under Laxmisagar GP within Block and PS Simlapal, Dist Bankura
Protection work by using HDPE bags for length of 50 Meter to the right bank of river Dwarakeswar, at village Muktapur, under Nikunjipur GP within Block and PS Onda, Dist Bankura
Emergent slope pitching on left bank of river Dwarakeswar using stone boulder for length of 106 metre at Khiraiboni under Shyamnagar GP within Block and PS Joypur, Dist Bankura
Bank Protection Work along left Bank of river Dwarakeswar for a length of 180m at Bhatigora, Patpur, Bankura under Ward no 18 Bankura Municipality
Urgent Cleaning of Dhardhara River from Hakimpara bridge to Confluence of Dhardhara and Karala river for a length of 600.00 m within Jalpaiguri Municipality under Sadar Block PS-kotawali ,Dist- Jalpaiguri
Urgent Cleaning of Gadadhar Drainager Channel from Ch 0.00km to Ch 1.50 km within Jalpaiguri Municipality and Kharia GP under Sadar Block PS kotawali Dist- Jalpaiguri
One Time Clearance of Dokhali Khal in between Ch-0.00 Km and 2.10Km for a total length of 1.80Km in Mouza-Bishnupur, G.P-13No Bishnupur Block-Sabang, District-Paschim Medinipur during the year 2026-27, under K.K.B Project Division.
One Time Clearance of Debi Khal in between Ch-0.00 Km and 3.50Km for a total length of 3.00Km in Mouza-Dubrajpur, G.P-10No Mohar Block-Sabang, District-Paschim Medinipur during the year 2026-27, under K.K.B Project Division.
Emergent Palliative Protection Work on the Left Bank of River Ganga for a Length of 67 m at Upstream of Jitutola Primary, Village Muliramtola, G.P. Mahanandatola, Block Ratua-I, District Malda
Emergent Palliative Protection Work on the Left Bank of River Ganga for a Length of 100 m in front of Muliramtola Primary, Village Muliramtola, G.P. Mahanandatola, Block Ratua-I, District Malda
Anti erosion work to the Right Embankment of Haldi River for a length of 1.050 Km at Dinobandhupur, G.P Vekutiya, Block Nandigram I, P.S Nandigram, Dist Purba Medinipur
MAINTENANCE OF G-G1 KHAL FROM 0.00 M TO 6760.00 M BY CLEARING , REMOVING HYACINTH WEEDS,JUNGLES AND SOLID/SEMI SOLID COMPACT MASS/GARBAGE WITHIN BUDGE BUDGE-I , II BLOCK, P.S- BUDGE BUDGE, DIST. SOUTH 24 PARGANA
Clearing , removing weeds and water hyacinth and solid/semi-solid compact mass ,maintenance period from 1st June 2026 to 31st May 2027 in between 0.00 Km. to 7.01 Km. of Alampur Main Khal under Block Budge-Budge II,P.S.- Nodakhali
MAINTENANCE OF MANAGEMENT KHAL FROM CH 0.00 M (OUT-FALL POINT AT CHURIAL MAIN KHAL) TO CH 5000.0 M BY CLEARING, REMOVING OF WATER HYACINTH, SEMI SOLID MATERIALS WITHIN BISHNUPUR-I, BLOCK, P.S- BISHNUPUR, DIST SOUTH 24 PARGANA UNDER SUBURBAN DRAINAG
MAINTENANCE OF SUTI KHAL-1 FROM 0.00M TO 1000.00M(OUT FALLING AT CHARIAL MAIN KHAL AT 5950.0M) SUTI KHAL-2 FROM 0.00M TO 1000.00M(OUT FALLING AT C.M KHAL AT 6130.00M) AND SUTI KHAL-3 FROM 0.00M TO 3000.00M(OUT FALLING AT C.M KHAL AT 6350.00M)
Clearing, Removing weeds and water hyacinth and solid /semisolid compact mass,maintenance from 1st July 2026 to 30th November 2026 in between Ch 0.00 and Ch 60.00 of Berapara Branch Khal within G.P.- Kashipur Alampur, Block Budge-Budge II
One time clearing , removing of water hyacinth and jungle cutting from ch. 0.00 m to ch. 2200.00 m of Chandipur khal and maintenance from june 2026,up to 31st october 2026 within block budge budge i, in p.s.- budge budge, dist south 24 parganas
Clearing , removing weeds and water hyacinth , Jungle and debris (including floating debris) /Garbage, maintenance in between Ch 0.00 , Ch 66.00 of Bahranpur Branch Khal from June 2026 to November 2026 within Block- Bishnupur II, P.S -Bishnupur
Soil Investigation work for proposed Single Lane RCC Bridge over Mandirbazar Khal within Mouza Dhanpota Ch.80 Block Mograhat I PS Mograhat Dist South 24 Parganas.
Clearing and removing solid semisolid compact mass from the bank and slope of Adiganga Channel near Moilapota woode bridge from 1st May 2025 to 31st May 2026 13 months in dist. South 24 Pargans.
Clearing and removing solid semisolid compact mass from the bank and slope of Adiganga Channel near Chowhati RCC Bridge from 1st May 2025 to 31st May 2026 13 Months in Dist South 24 Parganas.
Clearing and removing solid semisolid compact mass from the bank and slope of Adiganga Channel near Kamalgazi Box culvert from 1st May 2025 to 31st May 2026 13 months in Dist South 24 Parganas.