Loading…
Loading…
4,365 results • Latest
Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles along with clearing of jungle from the bank and slope of Adiganga Channel in between Bhadurighat downstream Ch 17265 and Suryapur upstream Ch 21300 for a length
Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles along with clearing of jungles from the bank and slope of Adiganga Channel in between Shasan Railway Culvert downstream Ch 13200 and Bhadurighat upstream Ch. 17
Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles along with clearing of jungle from the bank and slope of Adiganga Channel in between Jagaddal downstream Ch 3330 and Benerchadi upstream Ch 6900 for a length o
Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles along with clearing of jungle from the bank and slope of Adiganga channe in between Kamalgazi downstream Ch 0 and Jagaddal upstream Ch 3280 for a length of 3280
Clearing and removing water hyacinth and vegetative growth including floating debris of Suryapur Inner Channel from 0 to 16 Km. for a length of 16 K. from 1st May 2025 to 31st May 2026 for13 Months in Block Mograhat II and Baruipur PS Mograhat
Clearing and removing water hyacinth and vegetative growth including floating debris of Suryapur Link Channel from 0 to 6 point 20 Km. for a length of 6 point 20Km from 1st May 2025 to 31st May 2026 for 13 Months in Block Baruipur PS Baruipur
Clearing and removing water hyacinth and vegetative growth including floating debris of Suryapur Outer Channel from 0 to 7 point 20 Km for a length of 7 point 20Km from 1st May 2025 to 31st May 2026 for 13 Months in Block Baruipur PS Baruipur
Maintenance and Repair of Dakshin Angadberia Wooden Bridge over SAMD Part II Channel in GP Nikarighata within Block Canning I PS Canning Dist South 24 Parganas under Mograhat Drainage Division.
Maintenance and Repair of Gourdaha Wooden Bridge over B Series of SAMD Part II Channel in GP Basra within Block Baruipur PS Baruipur Dist South 24 Parganas under Mograhat Drainage Division.
Maintenance and Repair of Tanrakhali Wooden Bridge over Branch Channel H Series of SAMD Part II Channel at Mouza Uttar Angadberia in GP Dighirpar in Block Canning I PS Canning Dist South 24 Parganas under Mograhat Drainage Division
MR to Wooden Bridge over Kumrokhali Khal near Uttar Arun Nagar Abaitanik Prathamik Vidyalay Boral at Village Uttar Arun Nagar of GP Chaltaberia in PS Joynagar Dist South 24 Paraganas under Mograhat Drainage Division.
Extreme emergent repair of Wooden Bridge over Mandirbazar Khal at Ch 80 at Mouza Dhonpota in Block Mograhat I PS Mograhat Dist South 24 Parganas under Mograhat Drainage Division.
Repairing of Wooden Bridge over Suryapur Inner Channel at Ch 169 near Hangshaberia Primary School of Mograhat Irrigation Sub Division under Mograhat Drainage Division within Block Mograhat II PS Mograhat Dist. South 24 Parganas.
Construction of cement concrete road for a length of 375 M from closure dyke to end of Sundarban market within Block and P.S.- Kultali, Dist.- South 24 Pgs.
Renovation of 1 no. Sluice ( Single Vent ) at Right Embankment of River Lower Horinakhali in Mouza - Jugikundu and repairing of gate another sluice at Dosuti in G.P.- Arunda, Block - Khanakul - I and P.S.- Khanakul, District - Hooghly LDID
Emergent work for Temporary arrangement for restoration making leak proof sealing of different location under South Dinajpur Irrigation Division nonfunctioning under sluice gate above 5cumsec damaged during flood session
Emergent work for Temporary arrangement for restoration making leak proof sealing of different location under Malda Irrigation Division nonfunctioning under sluice gate above 5cumsec damaged during flood session
Emergent work for Temporary arrangement for restoration making leak proof sealing of different location under Mahananda Embankment Division nonfunctioning under sluice gate above 5cumsec damaged during flood session
Repairing from bottom of Gate Shutter of Draw Flap Shutters 02 nos Draw Shutter 02 nos Flap Shutter including bottom portion of Guide Channel at Bokadanra Block Ratua II Malda under Mahananda Embankment Division
Maintenance and repair to cut points and ghohes at different chainage of Ajoy Ex-zamindary left Embankment for monsoon 2026 in Block- Ketugram - I and II Salar (I) Sub-Division of Mayurakshi South Canals Division.
Clearing and removing of water hyacinth under AMC for the period of 12 month for a length of 3.0km from BSF Camp (Ch137.9 km) to BerigopalpurTaranipur Bridge (Ch. 141.8 km)and five nos Ghat for a lenght of 1.25km of Ichamati River in G.P Gobindapur
Clearing, Removing Weeds And Water Hyacinth, Jungle, In-Between Ch. 0.00 M To Ch.3600.00 M Of Bangla Branch Khal Of Balarampur Main Khal From June 2026 To November 2026 Within Block - Diamond Harbour Ii, Dist South 24 Pargana Under SDD
Clearing , Removing weeds and water hyacinth and solid /semisolid compact mass,maintenance from 1st July 2026 to 30th November 2026 in between Ch 0.00 and Ch 90.00 of Mayapur Khal within G.P.- Mayapur, Block Budge-Budge I, P.S.- Nodakhali
Geotechnical investigation in connection with Construction of New Office Building adjacent to Canal Villa within Ward No. 7 of KMC, District- Kolkata.
Supply of 1(One) no. Diesel Maxi Cab (Non Air Conditioned) for official use of the office of the Sub-Divisional Officer, Krishnagar Irrigation Sub-Division, Krishnagar, Nadia.
Re-Construction of Manikpur Wooden Bridge at Kulgachia over MMC(Reach-VIII) for a length of 18.00 m in Block-Uluberia-I, G.P-Chandipur, P.S-Uluberia, Distrcit-Howrah under Seijeria(I) Sub-Division of LDC Division.
Formation of temporary shed for pumping operation at BB1 khal and repair maintenance of Sulanguri police camp and high school shed during monsoon under Bidhannagar Municipal Corporation, District- North 24 PGS.
Protection work along left bank of river Hooghly adjacent to different ghats (Jora Mandir ghat, Badartala Palpara ghat, Adi Sashan ghat, 1 no. Basti ghat, Ramjanoki Ghat) for a total length of 1263 M within Ward no. 141 of KMC and Ward no. 7 of Mah
Supplying of sand bags to prevent over topping of BB1 and Sulanguri Khal during monsoon under Bidhannagar municipal Corporation, Dist North 24 Parganas.
Construction of Dwarf Embankment along Ghatal Circuit (GC) Embankment of River Shilabati an Narayani Khal from Ch. 0.00 km to ch. 2.000 km,Ch. 3.300 km to 5.240 km, Ch. 6.873 km to 7.700 km anD Ch. 8.780 km to 9.780 km for a length of 5.767 KM at
Restoration of damaged right bank of Lower Bagjola Khal in between 25.50 km to 26.50 km at Block and PS Haroa and Dist. North 24 paraganas
Resuscitation of Nandarampur-Santoshpur Suti Khal for a length of 4440 M including necessary protection work within Chingripota Gram Panchayet and Uttar Raypur Gram panchayat of Block Budge Budge- I, P.S.-Budge Budge, Dist. South 24 Parganas.
Annual maintenance by clearing and removing of water hyacinth, semi solid compact mass and jungle cutting from EE-2 Khal for a length of 341 M for 1 One year within Bhangar II Block, Dist. South 24 Parganas
Annual maintenance by Clearing and removing water hyacinth, semi solid compact mass and jungle cutting from XX 1 Khal from Ch. 0.00 km to Ch. 2.50 km for a length of 2500 M for a period of One year within Rajarhat Block, Dist. North 24 Parganas
Annual maintenance by Clearing and removing of water hyacinth, semi solid compact mass and jungle cutting from EE 1 Khal for a length of 4522 M for One year within Rajarhat Block, Dist North 24 Parganas
Annual maintenance by Clearing and removing water hyacinth, semi solid mass and jungle cutting from Ch. 0.00 Km. to Ch. 2.00 Km. of BB1 Khal for one year in PS Baguihati, Newtown, Technocity, Dist. North 24 Parganas
Oiling Greasing of 14 Nos Sluice gates at Sutunga Mansai river embankment at Mathabhanga municipality Dist Coochbehar under the jurisdiction of Teesta Barrage Electrical Division for FY 2026 27
Annual maintenance by Clearing and removing water hyacinth, semi solid mass and jungle cutting from Ch. 0.00 Km. VIP Road to Ch. 10.677 Km. Army Baily Bridge of Lower Bagjola Khal for One year, PS Baguihati, Newtown, Technocity, Dist. N24 PGS
Repair maintenace of load roller assembly of 2 Nos Silt Excluder Gates Gate No 44 45 at Teesta Barrage Gajoldoba Dist Jalpaiguri under the jurisdiction of Teesta Barrage Electrical Division for FY 2026 27
Repair maintenance painting including oiling greasing of 36 Nos Sluice gates and 27 Nos Flap Shutters at Town protection Takagach Rajarhat Ghughumari Embankment of river Torsha Dist Coochbehar under the jurisdiction of Teesta Barrage
Repair maintenance painting of 2 Nos Sluice gates at Salbagan Dist Coochbehar under the jurisdiction of Teesta Barrage Electrical Division for FY 2026 27
Maintenance of EE1 Khal from Ch. 0.00M to Ch.3300.00M by Clearing , removing of water hyacinth,weeds solid/semi solid compact mass/garbage within Block-Bishnupur-II,P.S. Mahestala, Dist.-South 24 Parganas under Suburban Drainage Sub-Division No.-II
MAINTENAN OF FF1 KHAL FROM CH 0.00 M TO 3000.0 M BY CLEARING , REMOVING OF WATER HYACINTH,WEEDS, JUNGLES AND SOLID/SEMI SOLID COMPACT MASS/GERBAGE WITHIN MAHESTALA MUNICIPALITY P.S- MAHESTALA, DIST SOUTH 24 PARGANA
MAINTENANCE OF CHURIAL DIVERSION CANAL IN-BETWEEN CH. 0.00 M TO CH.6750.00 M BY CLEARING ,REMOVING ,WATER HYACINTH, WEEDS,JUNGLES, SOLID/SEMISOLID COMPACT MASS/ GARBAGE AND FLOATING DEBRIS WITHIN BUDGE BUDGE I BLOCK, PUJALI MUNICIPALITY
Clearing , removing weeds and water hyacinth, Jungle and solid/semi-solid compact mass/Garbage , maintenance period from 1st June 2026 to 31st May 2027 in between 0.00 Km. to 3.66 Km. of Bahirchara Branch Khal of Alampur Main Khal
Clearing , removing weeds and water hyacinth , Jungle and debris (including floating debris)/ Garbage and maintenance in between 0.00 Km., 6.09 Km. of Rania Branch Khal of Kanta Khali Main Khal within Block ,P.S -Falta , Bishnupur -II, P.S.- Falta
Repair maintenance painting of Sluice gates at Raidak I Gadadhar river embankment at Tufanganj Dist Coochbehar under the jurisdiction of Teesta Barrage Electrical Division for FY 2026 27
Annual maintenance by Clearing and removing water hyacinth including thorny jungles, semisolid mass along with jungle cutting of the bank from 24.005 Km. Radhanagar-I Composite Bridge to 28.800 Km. Kulti of Lower Bagjola Khal for 1 year, N24PGS
MAINTANANCE OF CHAKRAJMOLLAH KHAL FROM 0.00M TO 7500.00M BY CLEARING , REMOVING OF WATER HYACINTH,WEEDS, SOLID/SEMI SOLID COMPACT MASS/GARBAGE WITHIN BLOCK- BISHNUPUR - I, P.S- BISHNUPUR , DIST SOUTH 24 PARGANA UNDER SUBURBAN DRAINAGE SDSD-II
Repair maintenance painting of Sluice gates Draw shutter flap shutter on the bank of River Dima and Kaljani at Alipurduar Town Protection emabankment Dist Alipurduar under the jurisdiction of Teesta Barrage Electrical Division for FY 2026 27