Loading…
Loading…
6 results • Latest
Construction of Mega Skill Development Centre at Belgaria, Dhanbad (3rd Call)
Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item - A0 and disposal of excavated earth as obtained to a distance upto 50M including all lifts levelling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design, building specification and direction of E/I.
Strengthening of road and laying Paver Blocks at Phase-I at Belgaria, Dhanbad (3rd call).
Filling Pot- holes and Patch Repairs with - Bituminous concrete, 40mm. (Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2) i.) for grading I Material
Construction of Model Primary Health Center PHC in Belgaria Township at Dhanbad (2nd Call).
Earth Work in excavation in Foundation Trenches in Ordinary soil (vide classification of soil item -B) and disposal of excavated earth as obtained to a distance upto 50 M including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of E/I
Upgradation of Phase-I of Visthapit Awas at Belgaria, Dhanbad. (3rd Call)
Dismantling old plaster and pointing in cement or lime and raking out joints to 15 mm. depth, watering and disposal of unserviceable materials with all leads all complete as per direction of E/l. G/F Ceilling
Upgradation of 9 Blocks for Hostel of proposed Mega Skill Center Trainee
Providing 12mm cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I.
Providing and Laying PCC in back and middle side of blocks at phase 1, Belgaria, T/s Dhanbad
Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I.