Loading…
Loading…
39 results • Latest
Providing Electrification to the first floor of the Guest House at ARS Anakkayam -General Electrical Work
CoA,Vellayani-Electrical Rewiring of Siren at Instructional farm-Power supply from IF Pump house -General Electrical Work
Pilot Water spray retort for food processing
Thermo Scientific Laboratory Deep freezer (upto -20°C Degree), with a capacity of 301 L to 350 L having Single Door, Thermo Scientific Laboratory Deep freezer (upto -20°C Degree), with a capacity of 301 L to 350 L having Single Door
GENERAL-Construction of Academic Block at RARS Kumarakom-Construction of Academic Block at RARS Kumarakom-General Civil Work
Thermo Scientific Refrigerated Centrifuge with LCD display
Bio-Rad Gel Documentation System with CMOS Camera
PRS, Panniyur-Electrical Maintenance and Repair of Type IV quarters - General Electrical Work
ARS Anakkayam-Providing electrification to 3HP pump set -General Electrical Work
GENERAL-2025-26-Providing crop wild relatives cafeteria at ICAR-National bureau of plant genetic resources regional station,KAU,Vellanikkara
Extension of Desi cattle shed unit Input preparation Yard Chain Link fencing
Renovation works to Seminar Hall in PRS Panniyur
Supply, fabrication, installation, testing and commissioning of one (1) 20 HP Stainless Steel (SS 304) Petti and Para Dewatering System, including necessary RCC and minor civil works and buy-back of one existing wooden Petti and Para
Supply of security guards to COA Padannakkad for a period on one year
Unbranded Automatic Plant growth chamber
Unbranded Automatic Plant growth chamber
KCAEFT Tavanur- Electrical Maintenance and Repair of Ladies Hostel (Retender)
Construction of a new room next to bio control lab
Repair and maintenance of various polyhouses
Construction of Concrete Road infront of DSW Office at KAU, M.C, Vellanikkara.
Construction of Concrete road connecting Achuthamenon Building to KAU Canteen, KAU, MC, Vellanikkara.
Paving interlock for Pepper/Areca nut drying yard
Repair and maintenance of work to Staff Quarters
Kasargod Development Package-RARS Pilicode-Construction Of Laboratory Building In Rars Pilicode
RKVY-Strengthening of KAU Agri-business Incubator Main campus, Vellanikkara
Providing chainlink fencing at CDB farm, KAU, Vellanikkara.
Providing Rest Room at ARS Water Management Unit at M.C. Vellanikkara
Renovation works of the Mass Production unit at AICRP on BCCP, CoA, Vellanikkara
KAU, Mannuthy-Rewiring of Refurbishing area of Press Building-General Electrical Work.
State plan 2024-2025-Construction of new irrigation pump house at east side pond near KAU, Main gate, MC, Vellanikkara.
DEVELOPMENT OF AN AI-BASED DIGITAL PLATFORM FOR KAU-FPO LINKAGE PROGRAMME
Supply and installation of Scientific laboratory Equipments/Instruments
supply, installation, commissioning, demonstration and training of DOUBLE WALLED GRAIN STORAGE UNIT at ABI Vellanikkara
Supply and installation of DOUBLE WALLED GRAIN STORAGE UNITS at ABI, Vellanikkara
Supply, installation, commissioning, demonstration and training of WINERY PROCESSING LINE at Agri Business Incubator Vellanikkara
Supply, installation, commissioning, demonstration and training of Stereo microscope with integrated camera at BCCP, College of Agriculture, Vellanikkara
DEPOSIT-Instructional Farm Vellayani,-Electrification of farm workers resting rooms in A and D Blocks.
Supply, installation and training of integrated cocoa processing equipment at Cocoa Research Centre, Vellanikkara
SEED PROCESSING MACHINERY LINE at Dept of Seed Science and Technology