Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC | ₹6.0 L | L1 | Accepted-AOC l1 |
| 2 | L2₹6.0 L+₹1,602.84 (0.27%)Rejected-AOC | ₹6.0 L+₹1,602.84 (0.27%) | L2 | Rejected-AOC l2 |
| 3 | L3₹6.4 L+₹36,440.81 (6.08%)Rejected-AOC | ₹6.4 L+₹36,440.81 (6.08%) | L3 | Rejected-AOC l3 |
| Sl No | Description | Qty | Unit | National Biotech L2 | P RASHEED L1 | SEAVART BUILDERS AND DEVELOPERS PVT LTD L3 |
|---|---|---|---|---|---|---|
| 1.00Polyhouse Sl No 1 | ||||||
| 1.00 | 15.18:Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 139.2 | kg | 15 ₹2,088 | 5.04 ₹701.57 Lowest | 10 ₹1,392 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.65 | cum | 300 ₹194.4 | 222.43 ₹144.13 Lowest | 500 ₹324 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.65 | cum | 9,700 ₹6,285.6 | 7,974.4 ₹5,167.41 Lowest | 10,000 ₹6,480 |
| 1.00 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 168 | kg | 217 ₹36,456 | 199.39 ₹33,497.52 Lowest | 230 ₹38,640 |
| 1.00 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 7.68 | sqm | 125 ₹960 Lowest | 142.34 ₹1,093.17 | 160 ₹1,228.8 |
| 1.01 | OD344/2025-2026:supplying aluminum channel with triple spring locking of 0.90 mm thick with smooth edges, 190 gm/ m and fixing to the frame with 20 mm long self drilling screws@30cm c/c,including all cost of labour and materialas etc. complete. | 258.7 | metre | 130 ₹33,631 | 87.02 ₹22,512.07 Lowest | 125 ₹32,337.5 |
| 1.01 | OD346/2025-2026:supplying and fixing UV film of 200 micron of best quality and fixing to the frame already fixed using aluminium extruded channels (which are paid separately)as per the direction of departmental officers | 1,035.6 | sqm | 173 ₹1,79,158.8 Lowest | 192.91 ₹1,99,777.6 | 180 ₹1,86,408 |
| 1.01 | OD347/2025-2026:supplying and fixing GI Zig zag spring for fixing UV film/ shade net using aluminum profile which is already fixed and paid separately | 258.7 | metre | 25 ₹6,467.5 | 16.61 ₹4,297.01 Lowest | 30 ₹7,761 |
| 1.01 | OD532/2025-2026:Providing and fixing PVC rain water gutter (200mm or nearest available size) best quality and specials such as end drop, centre drop, clamps etc including all cost of materials and labour charges etc complete. | 33 | metre | 620 ₹20,460 | 613.99 ₹20,261.67 Lowest | 700 ₹23,100 |
Tender Value
₹6.4 L
EMD Value
₹15,953
Closing Date
17 Jun 2026, 5:00 pmClosed
Executive Engineer
Executive Engineer, KAU -Engineering Division, KCAET, Tavanur-679573
Repair and maintenance of various polyhouses
2026_KAU_854851_1
EE/159/2026
Open Tender
Civil Works - Buildings
Item Rate
180 days
ARS ANAKKAYAM
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,664
Yes
₹15,953
Yes
4 Jul 2026
9 Jun 2026
19 Jun 2026
9 Jun 2026
17 Jun 2026
9 Jun 2026
9 Jun 2026 - 17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Polyhouse Sl No 1 | |||||
| 1.001 | 15.18:Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 1 | kg | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.003 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.004 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | - | kg | - | - |
| 1.005 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 1 | sqm | - | - |
| 1.006 | OD344/2025-2026:supplying aluminum channel with triple spring locking of 0.90 mm thick with smooth edges, 190 gm/ m and fixing to the frame with 20 mm long self drilling screws@30cm c/c,including all cost of labour and materialas etc. complete. | 1 | metre | - | - |
| 1.007 | OD346/2025-2026:supplying and fixing UV film of 200 micron of best quality and fixing to the frame already fixed using aluminium extruded channels (which are paid separately)as per the direction of departmental officers | 1 | sqm | - | - |
| 1.008 | OD347/2025-2026:supplying and fixing GI Zig zag spring for fixing UV film/ shade net using aluminum profile which is already fixed and paid separately | 1 | metre | - | - |
| 1.009 | OD532/2025-2026:Providing and fixing PVC rain water gutter (200mm or nearest available size) best quality and specials such as end drop, centre drop, clamps etc including all cost of materials and labour charges etc complete. | - | metre | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
TenderDocument3.pdf
Tender Documents • 0.08 MB
PreliminaryAgreement.pdf
Additional Documents • 0.01 MB
EPayment.pdf
Additional Documents • 0.01 MB
BOQ_1444744.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .