Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹70.3 LAccepted-AOC KANNAMPURACKAL HOUSE PUNNATHURA WEST P O ETTUMANOOR KOTTAYAM | ETTUMANOOR | KOTTAYAM | KERALA | 686631 | L1 | Accepted-AOC L1 | |
| 2 | L2₹72.9 L+₹2.6 L (3.75%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹74.2 L+₹3.9 L (5.55%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹78.2 L+₹7.9 L (11.2%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹79.8 L+₹9.5 L (13.5%)Rejected-AOC | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | Anish Thomas L1 | Sivarajan.B L4 | RAJAN N (MAHALEKSHMI CONSTRUCTIONS) L6 | Jomon joseph L2 | BHARATH INFRASTRUCTURE DEVELOPERS L3 | RAGHUNATHAN NAIR L7 | AJIN R L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Academic Block | ||||||||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 450 | sqm | 7.86 ₹3,537 Lowest | 12 ₹5,400 | 9 ₹4,050 | 9 ₹4,050 | 8.31 ₹3,739.5 | 9.27 ₹4,171.5 | 9 ₹4,050 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 117 | cum | 218.7 ₹25,587.9 Lowest | 340 ₹39,780 | 248 ₹29,016 | 250 ₹29,250 | 230.84 ₹27,008.28 | 257 ₹30,069 | 248 ₹29,016 |
| 1.00 | OD166/2026-2027:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. | 828 | metre | 121.54 ₹1,00,635.12 Lowest | 350 ₹2,89,800 | 138 ₹1,14,264 | 180 ₹1,49,040 | 128.29 ₹1,06,224.12 | 143.18 ₹1,18,553.04 | 138 ₹1,14,264 |
| 1.00 | OD161/2026-2027:Coconut Pile - Driving down coconut pile to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end | 828 | metre | 1,338.4 ₹11,08,195.2 | 350 ₹2,89,800 Lowest | 1,519 ₹12,57,732 | 600 ₹4,96,800 | 1,412.66 ₹11,69,682.48 | 1,576 ₹13,04,928 | 1,519 ₹12,57,732 |
| 1.00 | OD162/2026-2027:Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150m | 276 | each | 193.55 ₹53,419.8 Lowest | 200 ₹55,200 | 220 ₹60,720 | 250 ₹69,000 | 204.3 ₹56,386.8 | 228 ₹62,928 | 220 ₹60,720 |
| 1.01 | OD163/2026-2027:
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 23.4 | cum | 3,390.04 ₹79,326.94 Lowest | 3,900 ₹91,260 | 3,849 ₹90,066.6 | 4,000 ₹93,600 | 3,578.14 ₹83,728.48 | 3,993 ₹93,436.2 | 3,849 ₹90,066.6 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 84.58 | sqm | 327.81 ₹27,726.17 Lowest | 700 ₹59,206 | 372 ₹31,463.76 | 360 ₹30,448.8 | 346 ₹29,264.68 | 386 ₹32,647.88 | 372 ₹31,463.76 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 8.82 | cum | 6,734.23 ₹59,395.91 Lowest | 7,900 ₹69,678 | 7,646 ₹67,437.72 | 7,500 ₹66,150 | 7,107.87 ₹62,691.41 | 7,932 ₹69,960.24 | 7,646 ₹67,437.72 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 5,992.64 | kilogram | 95.44 ₹5,71,937.37 Lowest | 109 ₹6,53,197.54 | 112.3 ₹6,72,973.25 | 112 ₹6,71,175.46 | 100.74 ₹6,03,698.35 | 112.43 ₹6,73,752.29 | 109 ₹6,53,197.54 |
Tender Value
₹82.8 L
EMD Value
₹50,000
Closing Date
1 Sept 2026, 11:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Director of Physical Plant
Director of Physical Plant Directorate of Physical Plant Kerala Agriculture University Vellanikkara , Thrissur 680656
GENERAL-Construction of Academic Block at RARS Kumarakom-Construction of Academic Block at RARS Kumarakom-General Civil Work
2026_KAU_864686_1
KAU/KAU/TR/129/2026_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
360 days
RARS Kumarakom
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
₹50,000
15 Oct 2026
18 Aug 2026
5 Sept 2026
18 Aug 2026
1 Sept 2026
18 Aug 2026
60 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Academic Block | |||||
| 1.001 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.003 | OD166/2026-2027:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. | - | metre | - | - |
| 1.004 | OD161/2026-2027:Coconut Pile - Driving down coconut pile to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end | - | metre | - | - |
| 1.005 | OD162/2026-2027:Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150m | - | each | - | - |
| 1.006 | OD163/2026-2027:
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 1 | cum | - | - |
| 1.007 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 1 | sqm | - | - |
| 1.008 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.009 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.2 | kilogram | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1463079.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_1463079.xls
BOQ • 0.35 MB
Prelimininary_ageement.pdf
Other Document • 0.25 MB
Requisitione-Payment.pdf
Other Document • 0.01 MB
kumarokombiddoc.pdf
Tender Documents • 4.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .