Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
8,301 results • Latest
IMPROVEMENT OF PARK LIGHTING SYSTEM AT SOUTH SEALDAH PARK IN WARD NO. - 57, UNDER BR. - VII
REPAIRING AND REPLACEMENT WORK OF STREET LIGHTING SYSTEM AT P.N.C LANE, RATAN BABU ROAD AND DIFFERENT OTHER PLACES IN WARD NO-01
SAFETY PRECAUTION BY INSTALLATION OF INSULATING MATERIALS ON THE EXISTING STREET LIGHT POLES AT TARAMONI GHAT RD,NASKAR PARA RD,BANERJEE PARA RD AND OTHER WATER LOGGING AREAS IN WARD NO-115 UNDER BR-XIII.
REPAIRING OF PAVERBLOCK FOOTPATH AT 2/A ,22 BIDHAN SARANI AND OTHERS AREA IN WARD NO - 038 UNDER BR-IV
REPAIRING AND RENOVATION OF EXISTING STREET LIGHTING SYSTEM AT TARAMONI GHAT RD,CHADER VILLAGE RD AND OTHER DIFFERENT AREAS IN WARD NO-115,KMC.
IMPROVEMENT OF ILLUMINATION BY INSTALLING LED LIGHT FITTINGS AND ALLIED ELECTRICAL WORKS AT TARAMONI GHAT RD,JUDGE BAGAN AND OTHER AREAS IN WARD NO 115 UNDER BR-XIII.
INSTALLATION OF TWO NOS OF LED ACRYLIC GLOW SIGN BOARD AT KHELA HOBE POURO UDDAN AND PRAKRITY DEBI POURO UDDAN IN WARD NO 115,BR-XIII,KMC.
REPAIRING AND RENOVATION OF EXISTING STREET LIGHTING SYSTEM AT UTTARAN AREAS OF SILVERTON,KARUNAMOYEE,TARA MONI GHAT ROAD AND OTHER UTTARAN AREAS IN WARD NO- 115,KMC.
THOROUGH IMPROVEMENT OF FOOTPATH DISTURBED BY DRAINAGE DEPTT. AT THE SOUTHERN FLANK OF HARINATH DE ROAD FROM JUNCTION OF C.W. ROAD TO R.D. STREET IN WARD NO 28.
SAFETY PRECAUTION BY INSTALLATION OF INSULATING MATERIALS ON THE EXISTING STREET LIGHT POLES AT AROBINDA PALLY,KK ROAD AND SURROUNDING WATER LOGGING AREAS IN WARD NO-122 UNDER BR-XIII.
RESTORATION OF ROAD TO BE DISTURBED DUE TO W/S DEPTT. AT NAFAR KOLEY ROAD FROM KOLEY BARI TO SRI DURGA CLUB, IN WARD NO-36
IMPROVEMENT OF UTTARAN SEWER LINE WITH ANCILLARY CIVIL WORK AT 21/1, EKBALPORE LANE, 5, NAWAB ALI LANE, 21/3B, MOMINPORE ROAD ANDETC. IN WARD NO.-078
Repairing of collapsed pit, catch pit, S.W pipe at different places in Uttaran(Bustee) area in Ward No-25 under BR-IV
RESTORATION OF BITUMENOUS ROAD SURFACE AT 70,D.H.ROAD, 38/2, EKBALPORE ROAD, 10,11,50, DENT MISSION ROAD AND ITS SURROUNDING AREA IN WARD NO -77
RENOVATION OF LIGHTING SYSTEM WITH OTHER ELECTRICAL WORKS AT TELEPHONE ROOM, ROOM NO 206 AND LAW DEPARTMENT OF CMO BUILDING UNDER KMC.
THROUGH REPAIRING OF CONCRETE PASSAGE AT 2, MITRA LANE TO 84, MUKTARAM BABU ST. DUE TO LAYING OF S.W PIPE IN WD NO-039
RENOVATION OF GIRLS TOILET OF KMCP SCHOOL AT 7, NAFAR KOLEY ROAD IN WARD NO-36
RESTORATION OF I.P.S FOOTPATH AT GANGADHAR BANERJEE LANE,MONILAL BANERJEE LANE, HARI SAVA STREET AND ITS SURROUNDING AREA IN WARD NO-77
REPAIRIING OF DRAINAGE AT DIFFERENT LOCATION OF 2 NO. LAKE CAMP AND OTHER UTTARAN AREAS IN WARD NO 90
REPAIRS TO I.P.S, CONCRETE FOOTPATH AND PASSAGES AT 9, NANDA KR CHOWDHURY LANE, 6/B, 32, MADAN MITRA LANE, 1/1/B, BARIK LN, 9/A, DINABANDHU LANE AND OTHER PLACES IN WARD NO-27 UNDER BR-IV
URGENT RESTORATION OF ASPHULTUM PAVEMENT AT 59/A,P.M.ROY ROAD,7/U, M.D.LANE, 2/B, CHETLA HUT ROAD AND ADJACENT AREA WARD NO-82
Thorough overhauling, necessary repairing including replacement of damaged spares and testing of 10 ton capacity overhead crane at KMPS
RAISING OF L.H/M.H/G.P COVERS AND FRAMES AT ALIPORE ROAD(LOW LEVEL), PEARY MOHAN ROY ROAD, P.G.LANE, PARAMHANGSHA DEV ROAD,MOHESH CH. DUTTA LANE ETC IN WARD-82
REPAIRING OF STEEL STRUCTURES ALONG WITH CIVIL WORKS OF DRUM MIX PLANT UNDER ROADS (M) DEPT.
REPAIRING OF SEWER LINE AND ANCILLARY WORK AT 302, APC ROAD IN WARD -37, BOROUGH V
REPAIRING OF SECURITY ROOM NEAR GATE NO 2 WITH OTHER ALLIED CIVIL WORKS INSIDE GORAGACHA PLANT.
ENGAGEMENT OF LABOURS FOR CLEANING THE WEIGH BRIDGES AND GATE AREAS THROUGHOUT THE YEAR UNDER ASPHALTUM DEPT GORAGACHA.
REPAIRING OF UTTARAN PASSAGES AT 11/2 HARSHI STREET, 7/2 DR. M.N. CHATTERJEE SARANI AND DIFFERENT PLACES IN WARD NO-36
REPAIRING OF PASSAGES AND FOOTPATH AT K.C SEN ST, BANKIM CHATTERJEE ST AND OTHER DIFFERENT AREAS IN WARD NO - 040, UNDER BOROUGH V
RESTORATION OF ROAD TO BE DISTURBED DUE TO WATER SUPPLY DEPTT. FROM 18 SHIBTALA LANE TO 138 BELIAGHATA ROAD (VIA PETROL PUMP), IN WARD NO-36.
SUPPLY AND DELIVERY OF LED FITTINGS TO REPLACE OLD/DAMAGED HPSV/MH/LED FITTINGS AT LOCK GATE ROAD, K.L DAS ROAD, KPS ROAD, AND OTHER DIFFERENT PLACES IN WARD NO-06 UNDER BR-I
IMPROVEMENT OF SEWER AND ALLIED WORKS AT SATIN SEN SARANI AND ITS SURROUNDING AREAS IN WARD NO-14
REPAIR OF PASSAGE AT 218/17, 126/3/C N.M ROAD, 61/29 M.B LANE, 224/10, 223/1/6 M.M ROAD AND DIFFERENT PLACES IN WARD NO-30. DISTURBED BY W/S DEPTT
CLEANING AND WASHING OF PAY AND USE TOILETS AT DIFFERENT PLACES IN BOROUGH IX UNDER KMC
REPAIRING AND ARRANGEMENT OF WATER FACILITIES TO COMMUNITY TOILET AT 3B PITAMBAR GHATAK LANE UTTARAN AREA IN WARD 82, BOROUGH IX
REPAIRING OF PAY AND USE TOILET WITH OTHER ANCILLARY WORK AT DIFFERENT PLACES IN BOROUGH IX UNDER KMC
CLEANING OF ROAD SIDE URINAL AT DIFF. WARD UNDER BR.-IX
REPAIRING OF TOILET BLOCK INSIDE OF HARISH PARK IN WD NO. 73, BR. IX.
REPAIRING OF TOILET BLOCK INSIDE OF HARISH PARK NEAR BOOSTER PUMPING STATION IN WARD-73, BOROUGH-IX
Fabrication and erection of M.S. structural shed over two nos. oil type transformers beside 10MG SUGR at GRWW.
SUPPLY AND DELIVERY OF LED FITTINGS AT NORTH LAKE ROAD, B. K. SAHA ROAD AND ITS SURROUNDING .AREAS IN WARD NO-104, BR-XI.
IMPROVEMENT OF LIGHTING ARRANGEMENT AT ATABAGAN A BLOCK, USHA PALLY, SUBASH PALLY, ETC AREAS IN WARD NO 111, BR- XI.
Supply, fitting-fixing of SS sleeve and bearing housing cover (NDE side) for Recirculation pumps along with overhauling of one no. 600 mm and 750 mm dia. BFV gearbox with ancillary work of WTP-IV, GRWW.
SUPPLY AND DELIVERY OF LED FITTINGS AT BORAL MAIN ROAD, KAMDAHARI PURBA PARA, NARKEL BAGAN (KHALPAR SIDE) ETC. AREA IN WARD NO 111, BR-XI.
RESTORATION OF FOOTPATH/ PASSAGES(P.B. AND I.P). AT 35/6,16/C,PANDITIYA RD, 54/A,157/A,M.L.N RD,36A LANSDOWNE TERRACE ETC DISTURBED BY VARIOUS PU AGENCIES AND NATURAL WEAR AND TEAR IN WD -85.
Development of surface area adjacent to toilets blocks of chemical house, WTP-IV by necessary civil works along with renovation of existing surface drain inside clear water campus GRWW.
DEVELOPMENT OF WATER SUPPLY NETWORKS 150 MM AND 100 MM DIA C.I. SERVICE MAIN BY NEW 150 MM AND 100 MM DIA D.I. PIPE AT KUMAR PARA LANE AND KALUPARA LANE NEAR PREMISES NO. 65A, 68 AND 49A/1, 10/3 ETC, IN WARD NO. 91, BOROUGH-X.
RESTORATION OF PAVER.BLOCK AND IPS FOOTPATH DISTURBED BY DIIFFERENT PU AGENCIES ANDNATURAL WEAR AND TEAR AT 24/2A, S.N RD, 7, P.RD, 1, S.T.C RD, 5/B, C.M LN, 6A, G.B LN, 54,T.G RD, 3/C, K.B LN ETC IN WD-088
Fitting ,fixing of 12 mm dia M. S. wire rope with proper clamping for 5 set power bucket machine under sewer cleansing central
RESTORATION OF FOOTPATH/ PASSAGES (P.B. AND I.P) AT 14 GURUSADAY RD,7/1,15/3 DEODAR ST,27 PALIT ST ETC DISTURBED BY VARIOUS PU AGENCIES AND NATURAL WEAR AND TEAR IN WD -69