Loading…
Loading…
1,348 results • Latest
Provide assistance for various day to day office work in office of S.E.(ET and I)-2,3 and S.E.(MM)-2,3 STPS Sarni.
Dismantling of Existing Shade and fabrication and Erection of fully covered shed for Electrical Site Store of CHP 4 STPS Sarni.
Online testing of 400KV and 220 KV equipment of PH-2,3,4 STPS MPPGCL Sarni.
Procurement of supply of Spares and servicing for MELLCON make blower heat reactivated air dryer installed at ASH handling plant of unit No. 5, 500MW at SGTPS, MPPGCL, Birsinghpur.
Procurement of CGL Make 245KV,800AMP Condenser Bushing for 40MVA, 220/ 6.9/ 11Kv station transformer at , SGTPS, Birsinghpur.
Supply, Installation and Commissioning of latest Opacity Dust analyser for measurement of dust concentration (MgNm3) in flue gases at ESP Outlets and STACK for unit no.5,500MWat SGTPS MPPGCL Birsinghpur.
Procurement of Spare of Mechanical Seal of Make FLOWSERVE for BFP Model No. FK6D30 and Booster Pump Model No. FA1B56 for AOH of Unit No. 10 and breakdown maintenance of Unit No 10 and 11 of PH-IV, STPS, Sarni.
Procurement of Various Size Thermocouple, Thermowell and RTD for Unit No. 1 to 4 of PH-I and PH-II at SGTPS, MPPGCL, Birsinghpur.
Procurement of Position Feedback Transmitter of HPBP System of Unit No. 1 and 2 at SGTPS, MPPGCL, Birsinghpur.
Procurement of 60W industrial well glass LED fitting, 100W Hi-bay LED light and different wattage LED street light complete fitting energy efficient with all necessary fixing arrangement for PHI II III and for colony street light poles at SGTPS,brs
Procurement of Coupling for fan and motor shaft of PA and FD fans Installed in Unit 5 1x500MW at SGTPS MPPGCL Birsinghpur
Biennial work contract for round the clock cleaning of CHP 210 MW consisting of conveyor 21 A/B to 28 A/B including rotary breaker, reject conveyor, belt feeders, tunnel junction towers floors, track hopper . . . . . etc. of 210 MW ATPS Chachai.
Biennial work contract for peon related work / causal office work of O/o S.E.(Services) ATPS, MPPGCL, Chachai.
Procurement of Return Roller Brackets, CSK Bolts and Nuts and Gear Coupling for 4x210 MW CHP I at SGTPS, MPPGCL, Birsinghpur.
Overhauling work of TG Auxiliaries in AOH of Unit No. 10 of PH-IV, STPS, Sarni
Procurement of Brake Drum having dia. 500 mm of Primary Thruster Brake for Wagon Tippler at SGTPS MPPGCL Birsinghpur.
Procurement of batteries for DG2 and UPS with buy back of old batteries of 2X600MW, SSTPP, MPPGCL, Dongalia
Electro-Hydraulic Convertor (EHC) assembly, for LPBP for unit no. 3 and 4 SGTPS, MPPGCL, Birsinghpur.
Procurement of spares of ESP control panels of unit no 3N4 SGTPS Birsinghpur
The work of Annual maintenance contract of Teledyne USA make Hydrogen Generation plant of PH 4STPS Sarni.
National Ambulance Code provided with Mono-block stretcher Nursing and First Aid Kit Oxygen Cylinder and with facilities as required for standard Ambulance Engine capacity 1900 CC and above Diesel Version
Complete repairing or replacement and testing of 630 kVA defective transformer at new ash dam of 500MW unit, at SGTPS, MPPGCL, Birsinghpur.
Procurement of different types of YIL make transmitters for various auto loop for YIL make DCS Centum XL system for PH-I and II SGTPS BRS
Hiring of shift vehicle as per NIT and tender schedule for Rajghat HPS MPPGCL Chanderi
Procurment of spares of Thermocouples and RTD for turbovisory for ATRS System for unit no.3 and 4 at SGTPS,MPPGCL,Birsinghpu
Supply,Installation and testing of complete new Thyristor Controlled Rectifier Control panel mandatory spares for H2 plant at SGTPS,MPPGCL,BRS
Procurement of chain pulley blocks, polystersling, D shackles and Eye bolt at 3x105 MW, THPS I, Sirmour
Work for removal and installation of new aluminum partition along with glass, complete false ceiling work and flooring work and miscellaneous civil work in Unit 1 to 4 for common control room at SGTPS, MPPGCL, Birsinghpur.
PROCUREMENT OF 4 WIRE PRESSURE TRANSMITTER FOR EAST ATRS SYSTEM OF UNIT NO. I and II, SGTPS, MPPGCL, BIRSINGHPUR.
Procurement of spare of 220V/1500AH Chhabi make battery charger spares for unit no. 3and4 and S/B battery of SGTPS Birsinghpur
Work of MOT Lube Oil filtration of Unit No. 10 During AOH and 11 of PH-IV, STPS, Sarni
Procurement of spares of Mekaster make goods lift and thereafter installation at 1x500 MW CHP, SGTPS, MPPGCL, Birsinghpur.
Supply and application of Air seal Material (Ceramic Fiber) in Boiler during AOH of Unit no. 10 STPS Sarni.
Procurement of 90 KW,415V,3 Phase 1485 RPM, Seal water Motor of Ash Handling Plant of PH-I,at SGTPS,MPPGCL, BRS.
Procurement of Large Size Power Cylinder for 4-Way Valve operation of Air Dryer of Unit no.I and II, at SGTPS, MPPGCL, Birsinghpur
Procurement of LP TURBINE FREE STANDING BLADES of 7th and 8th stage of BHEL make KWU TURBINE SET of 250 MW Unit No. 10 and 11, PH-IV, STPS, Sarni.
Procurement of Spares for Coal Burners of Unit no. 3 and 4, SGTPS, Birsinghpur MW unit , SGTPS, MPPGCL, Birsinghpur.
Procurement of Air Port Ring Asembly and body liner for Bowl Mill XRP - 883 at 210 MW, ATPS, MPPGCL, Chachai
Supply, Erection and Commissioning of double circuit 1450mtr length 11 KV ACSR dog conductor overhead line for raw water intake feeder from Chimney 2 to zero point inside plant and 450mtr 11 KV dog conductor overhead line at bridge at SSTPP Dongalia
Hiring of one no AC Jeep Category 6 1 with SUV engine capacity up to 1500 CC for diesel version for official duty to Security Officer for 3000 km per month running for a period of 24 months at SGTPS MPPGCL Birsinghpur
Work of Hiring of one no jeep category 6 1 with SUV with engine capacity up to about 1500cc for diesel version for official duty to Fire OfficerChief Safety Officer Safety Officer O/o C E Gen with monthly runing 2000 km at SGTPS MPPGCL Brs
Annual work contract for Daily cleaning of siloarea and lowerstructure of silosPHI PHII PHIII along with work of loading transportation andunloading flyash by tractor trolley from road between zero mile to NTHand colonyto zeromile anddump into asdyke
Hiring of one no Tata Indica or equivalent car with engine capacity about 1200 CC for petrol diesel version for official duty of the Chief Chemist running 2000 km per month at SGTPS MPPGCL Birsinghpur fora period of 24 months
Annual work contract for Cleaning of Boiler House with associated auxiliaries building and toilets cleaning etc in unit no 1 2 PH I at SGTPS MPPGCL Birsinghpur
Segregation and Transportation of stone/shale collected at the sides of Old Track Hopper or any other places for a lead of 4.5KMs at SGTPS, MPPGCL, Birsinghpur
Annual work contract for providing assistance in day to day work of firefighting cell Unit no. 1 to 5 at SGTPS MPPGCL
Work proposal for AOH of TG Set of Unit No. 2, PH-I, SGTPS, MPPGCL, Birsinghpur.
Contingency work for in-situ Repair of Main Steam Stop Valve(MS-2) installed at Boiler of 1X500 MW, SGTPS, MPPGCL, Birsinghpur
Procurement of 100NB size Electric resistance welded steel pipes confirming to IS 1239 Part I-2004 Grade Fe 410 for Laying of pipeline for disposal of RO-reject water of Effluent treatment plant PH-IV to Dust suppression/sprinkler system of CHP-IV
Availing services of expert supervisory engineer for Fouress make Guillotine gates and damper installed in the boiler of 2x660 MW, SSTPP,MPPGCL,Dongalia.