Loading…
Loading…
1,600 results • Recent activity
Procurement of EOT/hoist spares for various EOTs/hoists of 2X600MW, SSTPP, MPPGCL, Dongalia
Procurement of spare parts of M/s L and T make LT breaker installed at 2x660MW, CHP II, SSTPP, Dongalia
Supply of Sulphuric Acid at SSTPP Khandwa, SGTPS Birsighpur and STPS Sarni
Supply of Polyelectrolyte for STPS Sarni, ATPS Chachai and SSTPP Khandwa
Procurement of Carb / Tribo Sol Clad Coated set of seat and disc for Nuva and ESP diffuser and 65 NB Equalizing valve Installed in AHP of 1X500 MW MM III and 2x210MW MM I, at SGTPS, Birsinghpur
Testing of Safety Valve installed at Boiler side on Boiler drum, water separator equalizing line, Main Steam line, Cold reheat Line (CRH), Hot Reheat Line(HRH) and Soot Blower Station by Online Valtest Method for Boiler unit 1 and 2 ph-1 and 3 and 4