Loading…
Loading…
186 results • Recent activity
Construction of Coffer Dam and Hiring of Hydraulic Excavator for Diversion of water and Construction of RCC Shaddle Block from RD 105 to RD 140 at Riyagri
Construction of Coffer Dam and Hiring of Hydraulic Excavator for fixing of Trash Racks on RCC Work over Trench Weir at Riyagri
Operation Running Repair and Maintenance of water Supply Scheme from Source Pump House to Tail end which includes Rising Main and Distribution system for a period of 6 Months
Relaying of GI pipe 150mm, 80mm and 25mm dia 187.50 Rmt and Laying Jointing and Testing of GI pipe line 150mm 80mm 25mm 235 Rmt damaged due to landslid over the Tunnel at Lower Bijni
Laying Jointing Testing and welding of GI pipe line 20mm 50mm 65mm and 80mm dia at Jail road near Kalyan dham Hospital Road and Tawambra Source
Repair /Overhauling of 150mm WK/WL 65/12 stages Centrifugal KSB make Pump set No II ist Stage